Greno Sectors

Greater Noida

On the map

Overview

RERA projects
18
+83 not yet checked
Median ₹/sq ft
₹15,500
apartments, ₹10,000–31,000
Past RERA date
1 (6%)
neither ready to move nor cancelled
Since launch
+8%
median change, 10 projects
Due 2026–2028
60 homes
in 1 project, by RERA date
Builders
12
Most active: Gaurs Group, Godrej
Sectors
23
plus 1 locality
Metro stations
6
in or within 1 km
Projects by stage
  • 8 new launch
  • 7 under construction
  • 3 ready to move

Projects

18 projects checked by our team

Show as slider

Sort byNamePrice₹/sq ftRERA date

  • Under constructionResidential

    CRC The Peridona (Jaypee Greens)

    CRC Group, Jaypee Greens

    ₹26,000/sq ft68% above the area

    Homes
    4, 5 BHK
    Price
    ₹12.87–19.5 Cr
    RERA date
    Feb 2030
    Size
    7 towers, 341 homes

    4, 5 BHK, RERA Feb 2030

  • New launchResidential

    ₹17,000/sq ft10% above the area

    Homes
    3, 4 BHK
    Price
    ₹3.01–5.6 Cr
    RERA date
    May 2030
    Size
    3 towers, 288 homes

    3, 4 BHK, RERA May 2030

  • New launchResidential

    Eldeco 7 Peaks Residences

    Eldeco, Sector Omicron 1A

    ₹13,000/sq ft16% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.37–3.71 Cr
    RERA date
    Nov 2030
    Size
    7 towers, 820 homes

    3, 4 BHK, RERA Nov 2030

  • Ready to moveResidential

    Gaur Atulyam

    UP TOWNSHIP INFRASTRUCTURE PRIVATE LIMITED, Omicron 1

    RERA date
    Jun 2023extended once

    RERA Jun 2023. extended once

  • Under constructionResidential

    Gaurs The Islands

    Gaurs Group, Jaypee Greens

    ₹16,000/sq ft3% above the area

    Homes
    4, 5 BHK
    Price
    ₹5.89–9.62 Cr
    RERA date
    Apr 2030
    Size
    9 towers, 514 homes

    4, 5 BHK, RERA Apr 2030

  • New launchResidential

    Godrej Arden

    Godrej, Sigma 3

    ₹15,000/sq ft3% below the area

    Homes
    2, 3, 4 BHK
    Price
    ₹2.07–3.91 Cr
    RERA date
    May 2030
    Size
    9 towers, 956 homes

    2, 3, 4 BHK, RERA May 2030

  • Under constructionCommercial

    Godrej Avenue 9

    Godrej, Sector 27

    ₹36,500/sq ft

    RERA date
    Apr 2030
    Size
    1 tower, 585 homes

    RERA Apr 2030

  • New launchCommercial

    Jaypee Greens Wish Point, Noida

    JAYPEE INFRATECH LIMITED, Jaypee Greens

    RERA date
    30 Sep 2021past its RERA date

    RERA 30 Sep 2021. past its RERA date

  • New launchCommercial

    Knowledge Square

    KNOWLEDGESQUARE REALTECH LLP, Knowledge Park III

    RERA date
    Apr 2030

    RERA Apr 2030

  • Under constructionResidential

    Legacy By Gaurs

    Gaurs Group, Jaypee Greens

    ₹31,000/sq ft100% above the area

    Homes
    4 BHK
    Price
    ₹10.88–14.77 Cr
    RERA date
    Sep 2029
    Size
    4 towers, 265 homes

    4 BHK, RERA Sep 2029

  • Under constructionResidential

    Northwind Sanctuary

    NORTHWIND ESTATES PRIVATE LIMITEDASSOTECH INFRASTRUCTURE PRIVATE LIMITED, Sector Pi

    ₹11,000/sq ft29% below the area

    RERA date
    Jan 2030
    Size
    4 towers, 195 homes

    RERA Jan 2030

  • Ready to moveResidential

    Purvanchal Royal City

    Purvanchal Projects, Sector Chi V

    RERA date
    Mar 2019
    Size
    18 towers, 2,597 homes

    RERA Mar 2019

  • Ready to moveResidential

    Purvanchal Royal City Phase II

    Purvanchal Projects, Sector Chi V

    RERA date
    Dec 2023extended 2 times
    Size
    18 towers, 2,597 homes

    RERA Dec 2023. extended 2 times

  • New launchCommercial

    Sigma Galleria

    GREEN PROJECTS LLP, Sigma II

    RERA date
    Dec 2029
    Size
    1 tower, 146 homes

    RERA Dec 2029

  • Under constructionResidential

    SKA Destiny One

    SKA Group, Zeta 1

    Homes
    3, 4 BHK
    RERA date
    Jan 2029
    Size
    3 towers, 645 homes

    3, 4 BHK, RERA Jan 2029

  • New launchResidential

    SKA Estate

    SKA Group, ETA II

    ₹10,000/sq ft35% below the area

    Homes
    3, 4 BHK
    Price
    ₹1.45–2.13 Cr
    RERA date
    Jan 2030
    Size
    5 towers, 1,059 homes

    3, 4 BHK, RERA Jan 2030

  • New launchResidential

    Sobha Aurum

    SOBHA, Sector 36

    ₹15,000/sq ft3% below the area

    Homes
    1, 2, 3, 4 BHK
    Price
    ₹1.11–3.43 Cr
    RERA date
    Apr 2030
    Size
    2 towers, 420 homes

    1, 2, 3, 4 BHK, RERA Apr 2030

  • Under constructionResidential

    Trecento Residences By Gaurs

    Gaurs Group, Jaypee Greens

    ₹31,000/sq ft100% above the area

    Homes
    4 BHK
    Price
    ₹15.5–15.65 Cr
    RERA date
    Jul 2028
    Size
    1 tower, 60 homes

    4 BHK, RERA Jul 2028

83 more RERA projects here, not yet checked by our teamFound by their RERA address or map point. Not counted in the numbers on this page.
  • Alpha Plaza
    SHREE VINAYAKA INFRASPACE DEVELOPERS PRIVATE LIMIT, Gautam Buddha Nagar
    RERA completion 29 Mar 2019; inside the outline on the map
  • Alstonia Apartments
    ANS APARTMENTS PVT LTD, Gautam Buddha Nagar
    RERA completion 12 Mar 2023; inside the outline on the map
  • Ats Dolce
    ATS Infrastructure, Gautam Buddha Nagar
    RERA completion 4 Nov 2025; inside the outline on the map
  • Bhs-12/13 Eta-Ii Gh-1a/1
    GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • Bhs-17 Lohiya Enclave Omicron-1a
    GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY, Gautam Buddha Nagar
    RERA completion 20 Feb 2020; inside the outline on the map
  • Bhs-17, Lohiya Enclave, Plot No-Gh-03a, Omicron-1
    GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY, Gautam Buddha Nagar
    RERA completion 30 Sep 2018; inside the outline on the map
  • Biigtech
    PRASANDI INFOTECH PARK PRIVATE LIMITED, Knowledge Park-III, Greater Noida
    RERA completion 30 Jun 2030; inside the outline on the map
  • Casa Grande
    EARTHCON CONSTRUCTIONS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Nov 2017; inside the outline on the map
  • Casa Grande-2
    EARTHCON CONSTRUCTIONS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Casa Grande2-Towera1
    EARTHCON CONSTRUCTIONS PRIVATE LIMITED, SECTOR-CHI-5
    RERA completion 30 Dec 2029; inside the outline on the map
  • Crest
    AR LANDCRAFT LLP, Gautam Buddha Nagar
    RERA completion 21 Apr 2022; inside the outline on the map
  • Cyber Hub 2
    GALACTIC CITY PRIVATE LIMITEDELEGANT IT SOLUTIONS PVT. LTD., Gautam Buddha Nagar
    RERA completion 26 Nov 2024; inside the outline on the map
  • Delta City Centre
    STARTLE INFRASTRUCTURE PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 7 Apr 2021; inside the outline on the map
  • Delta Square
    BABA PROJECTS PRIVATE LIMITED, Sector - Delta 2 , Greater NOIDA
    RERA completion 15 Oct 2030; inside the outline on the map
  • Delta Square 1
    BABAGREEN INFRABUILD PRIVATE LIMITED, Sector Delta 1
    RERA completion 9 Jan 2031; inside the outline on the map
  • Divyansh Green Heights
    PRASU DIVYANSH INFRAHEIGHT LLP, SECTOR Pi-01 & 2, GREATER NOIDA
    RERA completion 8 Jun 2030; inside the outline on the map
  • Durva Greens
    KAMRUP HOUSING PROJECT PVT. LTD., Gautam Buddha Nagar
    RERA completion 31 Dec 2017; inside the outline on the map
  • Evoke
    AR LANDCRAFT LLP, Gautam Buddha Nagar
    RERA completion 29 Apr 2024; inside the outline on the map
  • Gateway Plaza
    Godrej, Gautam Buddha Nagar
    RERA completion 3 Apr 2024; inside the outline on the map
  • Global Business Square
    SRIGARV INFRATECH PVT LTD, Gautam Buddha Nagar
    RERA completion 26 Sep 2024; inside the outline on the map
  • Green View- Ii Sahakari Awas Samiti Limited
    GREEN VIEW-II SAHAKARI AWAS SAMITI LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2025; inside the outline on the map
  • Greno Complex
    SHUBHSIDDHI INFRATECH PVT.LTD, Gautam Buddha Nagar
    RERA completion 30 Jan 2021; inside the outline on the map
  • Greno Plaza
    NAVDURGA BUILDCON PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 19 May 2028; inside the outline on the map
  • Hi Castle
    HI CASTLE REALTECH LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2025; inside the outline on the map
  • Iitl Nimbus The Express Park View (Tower I1, J1, K1)
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 29 Sep 2020; inside the outline on the map
  • Iitl Nimbus The Express Park View (Tower L,l1,m,m1
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • Iitl-Nimbus The Express Park View (Tower I,j & K)
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 31 Dec 2017; inside the outline on the map
  • India Trade Centre
    OMAXE INDIA TRADE CENTRE PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 28 Jun 2022; inside the outline on the map
  • Ithum’s Galleria (Formerly Rst Galleria)
    ADIHM DEVELOPERS PVT LTD., Gautam Buddha Nagar
    RERA completion 4 Jun 2023; inside the outline on the map
  • Jp Parks
    GANADHI PATI CONSTRUCTION PRIVATE LIMITED, Sector PI-1, Greater NOIDA
    RERA completion 19 Jul 2029; inside the outline on the map
  • Kaveri City Centre
    KAVERI TECHOBUILD PVT. LTD, Gautam Buddha Nagar
    RERA completion 3 Feb 2023; inside the outline on the map
  • Kaveri City Centre-2
    KAVERI ELITE INFRA DEVELOPERS PRIVATE LIMITED, Sector Delta-1, Greater Noida
    RERA completion 7 Jan 2031; inside the outline on the map
  • Kb Complex
    SHREE KUNJ BIHARIJI INFRATECH PVT.LTD, Gautam Buddha Nagar
    RERA completion 31 Dec 2019; inside the outline on the map
  • Kourtyard
    LAXMI TOWN PLANNERS PRIVATE LIMITED, SECTOR-DELTA-02, GREATER NOIDA
    RERA completion 25 Sep 2030; inside the outline on the map
  • Levante City Vista
    FASTECH GLOBE REALTORS, BLOCK-G, DELTA-2, GREATER NOIDA (U.P)
    RERA completion 16 Nov 2030; inside the outline on the map
  • Levante Metro Walk
    LEVANTE PROJECTS, SECTOR- DELTA-1
    RERA completion 30 Dec 2030; inside the outline on the map
  • Lifestyle Central
    DTR DEVELOPERS LLP, Sector-Delta-2
    RERA completion 8 Apr 2031; inside the outline on the map
  • Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up
    SUPEREMO INFRATECH PRIVATE LIMITED, GAUTAM BUDDHA NAGAR
    RERA completion 5 Mar 2030; inside the outline on the map
  • Migsun Central Market
    ANSAL IT CITY & PARKS LIMITEDMAHALUXMI BUILDTECH LIMITEDMAHALUXMI INFRAHOME PVT LTD, Greater Noida
    RERA completion 17 Oct 2028; inside the outline on the map
  • Migsun Delta Street
    MAHALUXMI INFRAHOME PVT LTDPARSVNATH DEVELOPERS LIMITED, SECTOR DELTA 2
    RERA completion 10 Sep 2029; inside the outline on the map
  • Migsun Galleria
    ROYALGOLF LINK CITY PROJECTS PRIVATE LIMITEDMAHALUXMI REALTECH PVT LTD, Gautam Buddha Nagar
    RERA completion 17 Nov 2025; inside the outline on the map
  • Migsun Jorbagh (Formerly The Hemisphere_phase-2_expa Villas)
    ROYALGOLF LINK CITY PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 8 Jun 2023; inside the outline on the map
  • Migsun Nehru Place 1
    ANSAL IT CITY & PARKS LIMITEDMAHALUXMI BUILDTECH LIMITEDMAHALUXMI INFRAHOME PVT LTD, TZ 06
    RERA completion 10 Oct 2028; inside the outline on the map
  • Migsun Nehru Place 2
    ANSAL IT CITY & PARKS LIMITEDMAHALUXMI BUILDTECH LIMITEDMAHALUXMI INFRAHOME PVT LTD, TZ06
    RERA completion 10 Oct 2028; inside the outline on the map
  • Migsun Ultimo
    MAHALUXMI INFRAHOME PVT LTD, Gautam Buddha Nagar
    RERA completion 21 Dec 2022; inside the outline on the map
  • Migsun Wynn
    S. J. P. HOTELS & RESORTS PVT LTD, Gautam Buddha Nagar
    RERA completion 27 Jul 2024; inside the outline on the map
  • Nilay Square
    NILAY INFRATECH PRIVATE LIMITED, Sector Alpha-II, Greater NOIDA
    RERA completion 15 Jan 2030; inside the outline on the map
  • Opulence Phase-I
    SAHA ESTATE DEVELOPERS PRIVATE LIMITEDWISH LAND BUILD ZONE PVT. LTD., Gautam Buddha Nagar
    RERA completion 5 Mar 2027; inside the outline on the map
  • Orizzonte
    CONCEPT HORIZON INFRA PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 17 Nov 2019; inside the outline on the map
  • Parsvnath Palacia Phase-I
    Parsvnath Developers Ltd, Gautam Buddha Nagar
    RERA completion 14 Dec 2021; inside the outline on the map
  • Parsvnath Palacia Phase-Ii
    PARSVNATH DEVELOPERS LIMITED, Gautam Buddha Nagar
    RERA completion 2 Aug 2022; inside the outline on the map
  • Parsvnath Privilege Phase-1
    Parsvnath Developers Ltd, Gautam Buddha Nagar
    RERA completion 30 Jan 2020; inside the outline on the map
  • Parsvnath Privilege Phase-Ii
    Parsvnath Developers Ltd, Gautam Buddha Nagar
    RERA completion 31 Jul 2019; inside the outline on the map
  • Parsvnath Privilege Phase-Iii
    Parsvnath Developers Ltd, Gautam Buddha Nagar
    RERA completion 30 Jan 2022; inside the outline on the map
  • Parsvnath Privilege Phase-Iv
    Parsvnath Developers Ltd, Gautam Buddha Nagar
    RERA completion 30 Jun 2022; inside the outline on the map
  • Pi City Center
    GOVINDA HOUSING LIMITED, Sector PI-1 , Greater NOIDA
    RERA completion 19 Jan 2030; inside the outline on the map
  • Presidential Villas
    Godrej, Gautam Buddha Nagar
    RERA completion 29 Mar 2024; inside the outline on the map
  • Royal Walkway
    VIDHI INFRABUILD PRIVATE LIMITEDVARDHMAN INFRABUILD PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Dec 2024; inside the outline on the map
  • Sattyam Complex
    PRO INFRA REAL PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Dec 2019; inside the outline on the map
  • Shagun City Center
    SHAGUN MART LLP, Sector-PI-1
    RERA completion 11 Apr 2029; inside the outline on the map
  • Shivam Plaza
    ISP CONSTRUCTION PVT LTD, Gautam Buddha Nagar
    RERA completion 31 Mar 2019; inside the outline on the map
  • Singapore Residency
    R S BUILTWELL PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Dec 2012; inside the outline on the map
  • Ska Metro Ville
    SKA Group, Gautam Buddha Nagar
    RERA completion 25 Nov 2024; inside the outline on the map
  • Suntwilight - Commercial
    SUNRISE STRUCTURES & DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 13 Feb 2024; inside the outline on the map
  • Suntwilight - Recreational - Phase - I
    SUNRISE STRUCTURES & DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 13 Feb 2024; inside the outline on the map
  • Suntwilight - Recreational - Phase-Ii
    SUNRISE STRUCTURES & DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Feb 2025; inside the outline on the map
  • Sushant Serene Residency Ph1 T7b1 & T6d
    ANSAL PROPERTIES & INFRASTRUCTURE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2019; inside the outline on the map
  • Sushant Serene Residency Ph2 T3e,t4e,t5d
    ANSAL PROPERTIES & INFRASTRUCTURE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2021; inside the outline on the map
  • Sushant Serene Residency Phase 3 Tower 10 (D) & T
    ANSAL PROPERTIES & INFRASTRUCTURE LIMITED, Gautam Buddha Nagar
    RERA completion 29 Mar 2022; inside the outline on the map
  • Sushant Serene Residency Phase 4 Tower T8b & T12e&
    ANSAL PROPERTIES & INFRASTRUCTURE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2022; inside the outline on the map
  • Svg Townsquare-2
    VINAYAKA EXPO PLAZA PRIVATE LIMITED, ALPHA -2
    RERA completion 1 Jul 2029; inside the outline on the map
  • Swarn Plaza
    VINAYAKA SHOPPING COMPLEX PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 29 Mar 2021; inside the outline on the map
  • Terminal 21
    GALACTIC CITY PRIVATE LIMITEDELEGANT IT SOLUTIONS PVT. LTD., Gautam Buddha Nagar
    RERA completion 31 Dec 2024; inside the outline on the map
  • The Express Park View Ii- Low Rise Apartments
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 22 Jan 2025; inside the outline on the map
  • The Hemisphere_phase-1
    ROYALGOLF LINK CITY PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 8 Jun 2023; inside the outline on the map
  • The Hemisphere_phase-1_towers
    ROYALGOLF LINK CITY PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 7 Mar 2025; inside the outline on the map
  • The Hemisphere_royalgolf Plaza
    ROYALGOLF LINK CITY PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 8 Jun 2023; inside the outline on the map
  • The Park Street
    IITL-NIMBUS THE EXPRESS PARK VIEW, Gautam Buddha Nagar
    RERA completion 30 Sep 2021; inside the outline on the map
  • Town Square-1
    MAHAVINAYAKA INFRAPROJECT PRIVATE LIMITED, SECTOR-ALPHA-2 GREATER NOIDA
    RERA completion 28 Dec 2028; inside the outline on the map
  • Unitech Cascade
    UNITECH LIMITED (MR.RAMESH CHANDRA, MR.AJAY CHANDRA,MR.SANJAY CHANDRA), Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • Unitech Habitat
    UNITECH LIMITED (MR.RAMESH CHANDRA, MR.AJAY CHANDRA,MR.SANJAY CHANDRA), Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Universal Hub 2
    GALACTIC CITY PRIVATE LIMITEDELEGANT IT SOLUTIONS PVT. LTD., Gautam Buddha Nagar
    RERA completion 26 Nov 2024; inside the outline on the map
  • Vardhman I Valley
    VARDHMAN ESTATES & DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map

Comparing projects in Greno Sectors? A ReraTracker advisor can talk you through RERA dates, builders and prices.

Prices

Builder asking prices for apartments from 10 projects, updated May–Jul 2026.

Median ₹/sq ft
₹15,500
Lowest ₹10,000Highest ₹31,000
Since launch
+8%
median change, 10 projects

Homes by size

From the unit types builders list. Carpet efficiency is the carpet area as a share of the area you pay for.

  • 3 BHK

    6 projects

    ₹1.45–4.07 Cr

    Carpet
    1,066 sq ft
    Efficiency
    55%
    ₹/carpet sq ft
    ₹23,919
  • 4 BHK

    10 projects

    ₹2.13–15.65 Cr

    Carpet
    1,937 sq ft
    Efficiency
    56%
    ₹/carpet sq ft
    ₹36,752

Delivery record

RERA completion dates after extensions, from the RERA filings.

Past RERA date
1
neither ready to move nor cancelled
Given extensions
2
of 18 UP RERA projects
With a RERA date
18
of 18 projects

Projects due each year

Due 2026–2028: 1 project, 60 homes

By RERA completion year. Hatched columns are years already past.

  1. 2019: 1 project, 2,597 homes, past
  2. 2020: 0 projects, past
  3. 2021: 1 project, past
  4. 2022: 0 projects, past
  5. 2023: 2 projects, 2,597 homes, past
  6. 2024: 0 projects, past
  7. 2025: 0 projects, past
  8. 2026: 0 projects
  9. 2027: 0 projects
  10. 2028: 1 project, 60 homes
  11. 2029: 3 projects, 1,056 homes
  12. 2030: 10 projects, 5,178 homes

Builders here

Most projects first. A chip marks projects past their RERA date, lapsed or extended; no chip means none.

  • Gaurs Group3 projects
  • Godrej3 projects
  • 1 extended
  • SKA Group2 projects
  • CRC Group1 project
  • Eldeco1 project
  • GREEN PROJECTS LLP1 project
  • JAYPEE INFRATECH LIMITED1 project
    1 past date
  • KNOWLEDGESQUARE REALTECH LLP1 project
  • NORTHWIND ESTATES PRIVATE LIMITEDASSOTECH INFRASTRUCTURE PRIVATE LIMITED1 project
Show all 12 builders
  • SOBHA1 project
  • UP TOWNSHIP INFRASTRUCTURE PRIVATE LIMITED1 project
    1 extended

Sectors

Our team defines each micro-market by its sectors; a sector can belong to more than one. Prices are the median apartment ₹/sq ft where 3 or more projects list one.

Most projects first; deeper tiles have more.

Show all 12 sectors

Also covers sectors Beta II, Delta I, Eta I, Knowledge Park V, Omega I, Omega II, Omicron II, Omicron III, P4, Pi I, Pi II and Zeta II, with no checked projects yet.

What’s around

Named places inside the micro-market, then those within 1 km of its edge.

6 metro stations

  • Delta 1
  • GNIDA Office
  • Alpha 1
  • Depot Station
  • Pari Chowk
Within 1 km:
  • Knowledge Park II

9 schools

  • Father Agnel School
  • Hillwoods Academy Gr Noida
  • Samsara The World Academy
  • Ursline Convent School
  • Holy Public School
  • Braintree Global School
Within 1 km:
  • Delhi Public School
  • Sanfort World School
  • and 1 more

9 colleges and universities

  • Janhit Institute of education and information
  • AIT - School Of Architecture & Planning
  • Sharda University
  • Dronacharya Group of Institutions
Within 1 km:
  • Ram-Eesh Institute of Vocational and Technical Education
  • KCC Institute
  • Innovative Group of Colleges
  • Army Institute of Management and Technology
  • and 1 more

13 hospitals

  • Green City Hospital
  • Astha Hospital
  • Navin Hospital, Noida
  • Roshan Hospital
  • Nimt Hospital
  • Sharda Hospital
Within 1 km:
  • Kailash Hospital Greater Noida
  • Kailash Institute Of Naturopathy Ayurveda And Yoga
  • and 5 more

2 malls

  • Ansal Plaza
  • Habitech Qube Crystal Mall

1 market

Within 1 km:
  • Phase 1 Market

16 parks

  • City Park
  • Pari Chowk Park
  • Park 1,Block A
  • Park 2,Block B
  • Park 3,Block C
  • Park A
  • Park 5 ,Block A
  • Park 6,Block B
  • and 8 more

Map data © OpenStreetMap contributors. Outlines are approximate.

News

About projects here first, then about builders active here.

Nearby micro-markets

How Greno Sectors compares with the micro-markets around it.

  • New launch
  • Under construction
  • Ready to move
  • Stalled or on hold
  • Cancelled
  • Greno Sectors

    This micro-market

    18 projects₹15,500/sq ft6% past date

  • Greater Noida

    Greater Noida

    23 projects₹16,500/sq ft9% past date

  • Jaypee Greens

    Greater Noida

    5 projects₹28,500/sq ft20% past date

  • 72 projects₹18,500/sq ft18% past date

  • 24 projects₹14,000/sq ft42% past date

  • Greater Noida West

    Greater Noida West

    21 projects₹12,250/sq ft0% past date

  • Yamuna Expressway

    Yamuna Expressway

    12 projects₹9,150/sq ft8% past date

Frequently asked questions

How many RERA projects are in Greno Sectors?

ReraTracker lists 18 RERA-registered projects in Greno Sectors, checked by our team.

What is the price per sq ft in Greno Sectors?

The median builder asking price for apartments in Greno Sectors is ₹15,500 per sq ft, from ₹10,000 to ₹31,000, across 10 priced projects, updated May–Jul 2026.

Which builders have projects in Greno Sectors?

The builders with the most projects in Greno Sectors are Gaurs Group, Godrej and Purvanchal Projects.

Which sectors and localities are in Greno Sectors?

Greno Sectors covers sectors 27, 36, Beta II, Chi V, Delta I, Eta I, Eta II, Knowledge Park III, Knowledge Park V, Omega I, Omega II, Omicron I, Omicron IA, Omicron II, Omicron III, P4, Pi, Pi I, Pi II, Sigma II, Sigma III, Zeta I and Zeta II, plus Jaypee Greens. Its boundary is approximate.

How many projects in Greno Sectors are past their RERA completion date?

1 project in Greno Sectors is past its RERA completion date and is neither ready to move nor cancelled.

Projects and dates come from RERA filings (UP RERA, HRERA and Delhi RERA) and ReraTracker’s research. Prices are builder asking prices. Outlines are approximate. Map data © OpenStreetMap contributors.