NewActive

MIGSUN GALLERIA

Gautam Buddha Nagar, Uttar Pradesh
05-02-2021
Launch Date
New
Type
17-11-2025
Completion Date

Overview

Launch Date

05-02-2021

Completion Date

17-11-2025

RERA ID

UPRERAPRJ187432

Location

Latitude

28.479708

Longitude

77.529068

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)10115
Project NameMIGSUN GALLERIA
Registration Fee (in Rs.)112000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)58
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date05-02-2021
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)5010
Proposed Completion Date17-11-2025

Bank Details

Account no.57500000608712
Name Of Account HolderRLCPPL MIGSUN GALLERIA RERA ESCROW ACCOUNT
Bank NameHDFC BANK
Branch AddressGREATER NOIDA, U.P.
Branch NameALPHA COMMERCIAL BELT
IFSC CodeHDFC0000278

Development Works

Demarcation of Plots

Designed plots are demarcated as per the sanctioned layout.

Boundary Wall

Boundary wall shall be commenced as soon as the construction work shall be started.;

Road Work

internal roads designed of different ROW as per the requirement.

Footpaths

Footpath shall be provided as per the layout.

Water Supply Including Drinking Water Facilities

Municipal water supply plan shall be used for drinking purposes.

Sewer System

sewerage system shall be used with STP as per the design calculation.

Drain

seperate drainage line shall be used as per the design calculation.

Parks

landscape area shall be provided as per the local building byelaws.

Tree Planting

shall be provided as per the layout.

Design For Electric Supply Including Street Lighting

Electric supply including street light shall be provided as per the layout.

Community Buildings

TO BE COMPLETED AS PER APPROVED LAYOUT

Treatment and Disposal System of Sewage and Sullage water

disposal system of the sewage and sullage water shall be used through STP for the purpose of landscaping and flushing.

Solid Waste Management And Disposal System

all the solid waste managed as per the biodegradable waste converted into compost and non biogradable delivered to waste management as per the design.

Water Conservation System

Low flow water fixtures shall be used for water conservation and STP water is used for landscaping and flushing purpose.

Energy Management System Including Use of Renewable Energy

TO BE COMPLETED AS PER APPROVED LAYOUT

Fire Protection And Fire Safety System

shall be provided as per the fire drawing and national building code.

Social Infrastructure And Other Public Amenities Including Public Health Services

social infrastructure and other public amenities including public health services shall be provided as per the local building byelaws.

Emergency Evacuation Services

shall be as per the environment management plan and disaster management plan all provisions are made including assembly point.

Other Miscellaneous Work

TO BE COMPLETED AS PER APPROVED LAYOUT

Documents

Lease Deed

No: 36254 | Date: 09-12-2014

Lease Deed

No: 12304 | Date: 09-06-2015

Allotment Letter issued by Competent Authority

No: 00 | Date: 08-03-2021

Details of Encumbrances

Uploaded: 07-02-2021

Commencement Certificate

Uploaded: 07-02-2021

Proforma of Application Form

Uploaded: 08-03-2021

Proforma of Allotment Letter

Uploaded: 08-03-2021

Waste Disposal Plan

Uploaded: 07-02-2021

Water Supply Plan

Uploaded: 07-02-2021

Electricity Supply Plan

Uploaded: 07-02-2021

Development Work Plan

Uploaded: 07-02-2021

Affidavit

Uploaded: 08-03-2021

CA CERTIFICATE

Uploaded: 07-02-2021

ARCHITECT CERTIFICATE

Uploaded: 08-03-2021

ENGINEERS CERTIFICATE

Uploaded: 08-03-2021

Permits

Orignal Permit NoPLG/(BP)3534/5479
Orignal Permit Date18-11-2020
Valid Upto17-11-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-11-2027
End Date17-11-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)JB INFRATECH
Contractor Address319/5, VIJAY NAGAR, GHAZIABAD
Architect NameAHMED MIYAN
Architect Address266/343, BHADEWAN, LUCKNOW
Architect Licence NumberCA/2010/47126
Structural Engineer NameSANJEEV SHARMA
Structural Engineer Address303 PLOT E195, PHASE 8B, INDUSTRIAL AREA, MOHALI, PUNJAB.
Mobile number(Project Co-ordinator)9911816065

Land Details

AFS

Showing 1 blocks with 89 units

Property Summary

Total Carpet Area

17574.40 m²

189169.08 ft²

Total Units

436

2 different types

Blocks & Floors

1

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:40.31 m²
Balconies:0
Parking ratio:0.00 per unit

Block 1

89 units

Khasra Details

Total Area

364285.00 m²

3921127.31 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoREP-02
Area(In Sq. Mt.)364285

Other Details

Contractor Name (if any)JB INFRATECH
Contractor Address319/5, VIJAY NAGAR, GHAZIABAD
Architect NameAHMED MIYAN
Architect Address266/343, BHADEWAN, LUCKNOW
Architect Licence NumberCA/2010/47126
Structural Engineer NameSANJEEV SHARMA
Structural Engineer Address303 PLOT E195, PHASE 8B, INDUSTRIAL AREA, MOHALI, PUNJAB.
Mobile number(Project Co-ordinator)9911816065