Designed plots are demarcated as per the sanctioned layout.
Boundary wall shall be commenced as soon as the construction work shall be started.;
internal roads designed of different ROW as per the requirement.
Footpath shall be provided as per the layout.
Municipal water supply plan shall be used for drinking purposes.
sewerage system shall be used with STP as per the design calculation.
seperate drainage line shall be used as per the design calculation.
landscape area shall be provided as per the local building byelaws.
shall be provided as per the layout.
Electric supply including street light shall be provided as per the layout.
TO BE COMPLETED AS PER APPROVED LAYOUT
disposal system of the sewage and sullage water shall be used through STP for the purpose of landscaping and flushing.
all the solid waste managed as per the biodegradable waste converted into compost and non biogradable delivered to waste management as per the design.
Low flow water fixtures shall be used for water conservation and STP water is used for landscaping and flushing purpose.
TO BE COMPLETED AS PER APPROVED LAYOUT
shall be provided as per the fire drawing and national building code.
social infrastructure and other public amenities including public health services shall be provided as per the local building byelaws.
shall be as per the environment management plan and disaster management plan all provisions are made including assembly point.
TO BE COMPLETED AS PER APPROVED LAYOUT
Showing 1 blocks with 89 units
Total Carpet Area
17574.40 m²
189169.08 ft²
Total Units
436
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
364285.00 m²
3921127.31 ft²