Have queries on this Project?
28.489945
77.521642
Showing 1 blocks with 52 units
Total Carpet Area
1553.06 m²
16716.98 ft²
Total Units
93
2 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1200.00 m²
12916.68 ft²
One Plot of 1200 SQM .
138.95 Mtr total Rmt., Hight-1.0 Mtr (for 37.260 Mtr length) and 1.0 Mtr (for 32.30 Mtr length-front) RCC and Brick, Appearance - As per Elevation
Total road Length- As per GNIDA and width- 18 Mtr, number of lanes - 2; type of pavement plan, surface durability -As per Fire Tender Movement
Length, width, number of crossings; material used, accessibility, safety design As Per Site Plan and Landscape
Number of water connections, tank capacity, hydrants; source of water, treatment method, compliance with quality standards Connections- 1 No, Tank capacity - Raw water Tank 1 KLD, Domestic water tank - 5 KLD Fire Water tank- 10 KL, Hydrants- Yes Provided, Source of water- municipal water supply, water treatment method- water treatment using dual media and activated carbon filters, Compliance with quality standards- Yes
Length of sewer lines, pipe size manholes; type (gravity/pressure), material used, network design Length of sewer lines- 5- mtr, pipe size- 200mm dia, manholes type (gravity/pressure)- Provision on outer side of Site Level; Network design- Piping network.
Length, Width, number open/covered drains; type (storm/surface), material, disposal method Length- 60 mtrs, Width- 200 mm dia (Dia of Pipe), Nomber of open/covered drains; type (storm/surface)- storm water system is planneds using pipe system, Pipe Material - SN4 (PVC), Disposal method - using rainwater harvesting and external drain.
Area, number of parks, number of trees/plants; landscaping features, types of parks, public amenities- As Per Landscape Plan.
Number of trees, types/species, spacing native/exotic trees, maintenance Plan - Nos. 1- Polyalthia longifolia 2- Terminakia Catappa 3- Tectona Grandis
Number of poles, lights, transformer units; type of lighting (LED/solar), illumination design Number of External Poles /lights - Approx. 2 Nos, Transformer units- 1 Nos, Type og lighting (LED/solar)- LED/Solar Illumination design - Yes as per norms
NA
STP capacity (KLD), number of treatment units type of STP, treated wayer use, regulatory compliance. STP Provision - Not Required
Estimated waste (Kg/day), number of bins/collection points; segregation, composting/recycling, collection method. Waste generated (Kg/Day)- 450 Approx
Number of size of harvesting pits, recharge wells; water-efficient fixtures, reuse/recharge strategy , system efficiency Number and size of harvesting pits- 1 Nos. of 11 m3 capacity each, recharge wells - Yes Provided, Water efficient fixtures - considered low flow sanitary fixtures, Reuse/recharge strategy - rain water will be used for ground water recharge, system efficiency - As per Norms.
(Renewable Energy) Solar capacity (kW), number of panels; type of renewable energy used, grid integration, backup provisions Online solar power system of capacity Approx. 100 KW.
Number of hydrants, fire exits, sprinklers; system type (manual/automatic), NBC compliance, fire safety trainning Number of hydrants - 5 Nos. (External), more than Approx.15 Hydrants internal, Sprinklers; system (MCP-mannual/automatic)- Automatic, NBC compliance - Yes, fire safety training - will be provided at the time of occupancy.
NA
Number of evacuation points, road widths, signage count; route plan, safety measures, public awareness system - As per NBC 2016.
Work based on the nature of work (e.g., number of CCTV units, benches); beautification efforts , signage, aesthetic and utility elements CCTV proposed as per project requirement.