NewActive

Ithum’s Galleria (Formerly RST Galleria)

Gautam Buddha Nagar, Uttar Pradesh
06-06-2018
Launch Date
New
Type
04-06-2023
Completion Date

Overview

Launch Date

06-06-2018

Completion Date

04-06-2023

RERA ID

UPRERAPRJ15652

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)11584
Project NameIthum’s Galleria (Formerly RST Galleria)
Registration Fee (in Rs.)126000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date06-06-2018
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)22000
Proposed Completion Date04-06-2023

Location

Latitude

28.47777778

Longitude

77.52305556

Bank Details

Account Details
Name of the AccountAdhim Developers Pvt Ltd I-Thums Galleria Collection Account
Account Number918020047697601
Bank NameAxis Bank Ltd
Branch NameSECTOR-62, NOIDA
Branch AddressGround Floor, Office No. 1, Tower A, Lobe-05, Plot No. A-41, The Corenthum, Sector-62, Noida, UP-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeUTIB0000723
Transaction Account Details
Name of the AccountAdihm Developers Pvt Ltd I-Thums Galleria Operative Account
Account Number918020047903618
Bank NameAxis Bank Ltd
Branch NameSECTOR-62, NOIDA
Branch AddressGround Floor, Office No. 1, Tower A, Lobe-05, Plot No. A-41, The Corenthum, Sector-62 Noida, UP-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeUTIB0000723

Development Works

Demarcation of Plots

Plot No. C-3, Alpha II, Greater Noida. As demarcated by Greater Noida Authority.

Boundary Wall

2400mm High, along entire periphery having combination of masonary walls & grills with variable heights

Road Work

Interlocking pavers & Trimix concrete flooring with mix pattern

Footpaths

Interlocking pavers & stone flooring.

Water Supply Including Drinking Water Facilities

Under Ground water tank Cap. 200.0 K.L.

Sewer System

Under Ground Sewer System as per IS:- 16098 Part 1 or Part 2 (Upvc SN4)

Drain

Under Ground Drain System as per IS:- 16098 Part 1 or Part 2 (Upvc SN4)

Parks

Hard & Soft landscape having a total area of 1607.62 shall be provided.

Tree Planting

62 nos. of trees shall be planted out of which 50% will be evergreen tree.

Design For Electric Supply Including Street Lighting

Two Electricity Transformers of 2500 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

STP of capacity  360 KLD shall be provided. Treated water shall be used for flushing, irrigation & Air Cooling.

Solid Waste Management And Disposal System

Organic waste converter shall be provided in the project

Water Conservation System

Rain water harvesting facilities shall be provided and Recycle water shall be used for Flushing& HVAC.

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.

Fire Protection And Fire Safety System

Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC & NOC from fire dept.

Social Infrastructure And Other Public Amenities Including Public Health Services

S.T.P / E.T.P, Garbage segregation area

Emergency Evacuation Services

Fire Staircases shall be provided  In Basement & The Towers for fire/ emergency exit as per norms.

Other Miscellaneous Work

N.A.

Documents

Lease Deed

No: 15470 | Date: 10-08-2011

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 23-08-2018

Commencement Certificate

Uploaded: 23-08-2018

Other Plan(If Any)

Uploaded: 14-09-2018

Proforma of Application Form

Uploaded: 14-09-2018

Proforma of Allotment Letter

Uploaded: 14-09-2018

Proforma of Conveyance Deed

Uploaded: 14-09-2018

Waste Disposal Plan

Uploaded: 23-08-2018

Water Supply Plan

Uploaded: 23-08-2018

Electricity Supply Plan

Uploaded: 23-08-2018

Development Work Plan

Uploaded: 14-09-2018

Affidavit

Uploaded: 23-08-2018

CA CERTIFICATE

Uploaded: 14-09-2018

ARCHITECT CERTIFICATE

Uploaded: 14-09-2018

ENGINEERS CERTIFICATE

Uploaded: 14-09-2018

Registry Document In Case of Own Land

Uploaded: 07-04-2018

Authentic copy of Approval of Project

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 07-04-2018

Proforma of Application Form

Uploaded: 07-04-2018

Proforma of Allotment Letter

Uploaded: 07-04-2018

Waste Disposal Plan

Uploaded: 07-04-2018

Water Supply Plan

Uploaded: 07-04-2018

Electricity Supply Plan

Uploaded: 07-04-2018

Affidavit

Uploaded: 07-04-2018

Permits

Orignal Permit NoPLG/(BP)-3860-1623
Orignal Permit Date08-03-2018
Valid Upto07-03-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-03-2028
End Date05-12-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Solutrean Building Technologies Limited
Contractor AddressA-41, Tower B, Ground Floor, The Corenthum, Sector 62, Noida, (U.P)
Architect NameAteesh Agarwal
Architect AddressF-89, Green Park Main, New Delhi - 110016
Architect Licence NumberCA/2003/31212
Structural Engineer NameV.D. Sharma
Structural Engineer AddressB-24, Sector 67, Noida, (U.P)
Mobile number(Project Co-ordinator)7835877777

Land Details

AFS

Showing 1 blocks with 969 units

Property Summary

Total Carpet Area

33608.18

361755.09 ft²

Total Units

966

2 different types

Blocks & Floors

1

19 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:34.79
Balconies:436
Parking ratio:0.00 per unit

Block 1

969 units

Khasra Details

Total Area

11584.00

124689.02 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-3
Area(In Sq. Mt.)11584

Other Details

Contractor Name (if any)Solutrean Building Technologies Limited
Contractor AddressA-41, Tower B, Ground Floor, The Corenthum, Sector 62, Noida, (U.P)
Architect NameAteesh Agarwal
Architect AddressF-89, Green Park Main, New Delhi - 110016
Architect Licence NumberCA/2003/31212
Structural Engineer NameV.D. Sharma
Structural Engineer AddressB-24, Sector 67, Noida, (U.P)
Mobile number(Project Co-ordinator)7835877777