Launch Date
Completion Date
RERA ID
28.428411
77.504597
Front Side 24 meter. wide road , Back Side Abadi Expansion, Right side plot no. GH-06B & Left Side Informal
2.1meter. Hight boundary wall and 547.45meter. Long
6meter. wide Internal Road & 6meter. Wide road around the tower for circulation
927.891 sq. m.( Area of Footpath)
Under Ground Water Tank 200 KL Raw Water & 200 KL Treated water Tank external water Supply with Distribution .
External Sewerage with STP
External storm water drainage with RWH
Total Landscaping Area including road 7237.667 Sq.Meter
No of proposed Tree-144 and No of proposed evergreen tree-72
Total load of Project 5061 KW the capacity of transformer is 5210 KVA & the transformer of 2 nos of 2000 KVA Load & Transformer of 1250 KV(Total Electric load=3419.67 KV)
Yes, One community centre (G+1) is planned.
STP of 600 KLD with 300 KL of treated effluent Storage tank for flushing Gardening System.
Solid Waste Management System is planned as Per inviorment clearance by (EIA).
Rain Water Harvesting System 4 nos of 4.35 m dia x 4.50 m (Depth) RWH well with 1.50m x 1.50m De-silt and 300mm dia x 25 m boring.
As per guidelines of ministry of renewable energy Govt. of India.
Sprinklers And Alarm Sytem are proposed for towers more than 60m ht.
N.A.
As per fire norms & fire NOC is received
Commmunity building & water body
Showing 5 blocks with 216 units
Total Carpet Area
41621.70 m²
448011.82 ft²
Total Units
691
5 different types
Blocks & Floors
5
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
18154.00 m²
195407.84 ft²