The Hemisphere_Phase-1_Towers

Gautam Buddha Nagar, Uttar Pradesh
12-03-2018
Launch Date
New
Type
07-03-2025
Completion Date

Overview

Launch Date

12-03-2018

Completion Date

07-03-2025

RERA ID

UPRERAPRJ15465

Location

Latitude

28'28’50.12” N

Longitude

77'31’51.37” E

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)23000
Project NameThe Hemisphere_Phase-1_Towers
Registration Fee (in Rs.)120000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)84
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date12-03-2018
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)7900
Proposed Completion Date07-03-2025

Bank Details

Account no.57500000090740
Name Of Account HolderRoyalGolf Link City Projects Pvt. Ltd
Bank NameHDFC Bank
Branch AddressAlpha Commercial Belt Greater Noida
Branch NameAlpha Commercial Belt Greater Noida
IFSC CodeHDFC0000278

Development Works

Demarcation of Plots

Done

Boundary Wall

Partially Done

Road Work

Will be constructed as per requirements

Footpaths

Will be constructed as per approved layouts

Water Supply Including Drinking Water Facilities

Will be constructed as per approved layouts

Sewer System

Will be constructed as per approved layouts

Drain

Will be constructed as per approved layouts

Parks

Will be constructed as per approved layouts

Tree Planting

Will be constructed as per approved layouts

Design For Electric Supply Including Street Lighting

Will be constructed as per approved layouts

Community Buildings

Will be constructed as per approved layouts

Treatment and Disposal System of Sewage and Sullage water

Will be constructed as per approved layouts

Solid Waste Management And Disposal System

Will be constructed as per approved layouts

Water Conservation System

Will be constructed as per approved layouts

Energy Management System Including Use of Renewable Energy

Will be constructed as per approved layouts

Fire Protection And Fire Safety System

Will be constructed as per approved layouts

Social Infrastructure And Other Public Amenities Including Public Health Services

Will be constructed as per approved layouts

Emergency Evacuation Services

Will be constructed as per approved layouts

Other Miscellaneous Work

Will be constructed as per approved layouts

Documents

Lease Deed

No: 36254 | Date: 10-12-2014

Lease Deed

No: 12304 | Date: 09-06-2015

Details of Encumbrances

Uploaded: 04-07-2018

Commencement Certificate

Uploaded: 04-07-2018

Proforma of Application Form

Uploaded: 04-07-2018

Proforma of Allotment Letter

Uploaded: 04-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 04-07-2018

Water Supply Plan

Uploaded: 04-07-2018

Electricity Supply Plan

Uploaded: 04-07-2018

Development Work Plan

Uploaded: 04-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 17-03-2018

Permits

Orignal Permit No3534-S-1707
Orignal Permit Date12-03-2018
Valid Upto12-03-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto12-03-2023
End Date09-12-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No3534-S-1707
Orignal Permit Date12-03-2018
Valid Upto12-03-2023
Revalidated Permit No3534-S-1707
Revalidated Permit Date12-03-2018
Revalidated Permit Valid Upto10-11-2025
Permit Extendable Upto10-11-2025
End Date08-06-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No3534-S-1707
Orignal Permit Date12-03-2018
Valid Upto10-11-2020
Revalidated Permit No3534-S-1707
Revalidated Permit Date12-03-2018
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto10-11-2025
End Date07-03-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAhmad Miyan
Architect Address266/343,BHADEWAN, LKO-04
Architect Licence NumberCA/2010/47126
Structural Engineer NameSanjeev Sharma
Structural Engineer Address303 Plot-E195 Phase 8B Industrial Area Mohali, Punjab-160055
Mobile number(Project Co-ordinator)9711633880

Land Details

AFS

Showing 12 blocks with 327 units

Property Summary

Total Carpet Area

34107.00

367124.34 ft²

Total Units

439

3 different types

Blocks & Floors

12

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:77.69
Balconies:907
Parking ratio:0.00 per unit

Block Tower-1

31 units

Block Tower - 2

30 units

Block Tower - 3

30 units

Block Tower - 4

31 units

Block Tower- 5

17 units

Block Tower- 6

17 units

Block Tower- 7

18 units

Block Tower- 8

31 units

Block Tower- 9

31 units

Block Tower- 10

30 units

Block Tower- 11

30 units

Block Tower- 12

31 units

Khasra Details

Total Area

364285.00

3921127.31 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoREP-2 Sector-27 Greater Noida
Area(In Sq. Mt.)364285

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAhmad Miyan
Architect Address266/343,BHADEWAN, LKO-04
Architect Licence NumberCA/2010/47126
Structural Engineer NameSanjeev Sharma
Structural Engineer Address303 Plot-E195 Phase 8B Industrial Area Mohali, Punjab-160055
Mobile number(Project Co-ordinator)9711633880