Launch Date
Completion Date
RERA ID
28.484733
77.54339
Demarcation Done by Total station
Permanent Boundary with Gated Premises
Trimix road All around
Paver path in landscape green
Municipal Corporation Water / Ground Water
STP will be installed for the treatment of sludge
As Per Drawing
As per Drawing
As per guided by authority
As per guided by authority
As Per Drawing
As per guided by authority Stp will be provided
As Per Drawing
As Per Drawing
As Per Drawing
As per guided by authority
As Per Drawing
As per guided by authority
As Per Drawing
Total Area
37760.00 m²
406444.86 ft²