NewActive

Nilay Square

Gautam Buddha Nagar, Uttar Pradesh
01-02-2025
RERA Received Date
New
Type
15-01-2030
Completion Date

Overview

RERA Received Date

01-02-2025

Completion Date

15-01-2030

RERA ID

UPRERAPRJ243992/03/2025

Location

Latitude

28.284321

Longitude

77.312197

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)2580
Project NameNilay Square
Registration Fee (in Rs.)36000
AddressPlot No. SLC-3/1, Sector Alpha -II , Greater NOIDA , Gautam Buddha Nagar, PIN-201310
Village/Locality/Sector etc.Sector Alpha-II, Greater NOIDA
StateUttar Pradesh
Project Duration (In month)60
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-02-2025
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)13000
Proposed Completion Date15-01-2030

Bank Details

Account Details
Name of the AccountNilay Infratech Pvt. Ltd. Collection Account for Nilay Square
Account Number712020110000760
Bank NameBank of India
Branch NameGreater NOIDA
Branch AddressC 6-7-8, F Block, Beta-II, Commercial Complex, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301
IFSC CodeBKID0007120
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountNilay Infratech Pvt. Ltd. Separate Bank Account for Nilay Square
Account Number712022410000001
Bank NameBank of India
Branch NameGreater NOIDA
Branch AddressC 6-7-8, F Block, Beta-II, Commercial Complex, Greater NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeBKID0007120
Transaction Account Details
Name of the AccountNilay Infratech Pvt. Ltd. RERA Transaction Account for Nilay Square
Account Number712022410000002
Bank NameBank of India
Branch NameGreater NOIDA
Branch AddressC 6-7-8, F Block, Beta- II, Commercial Complex, Greater NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeBKID0007120

Development Works

Demarcation of Plots

SLC-3/1 , Alpha- 2, Greater Noida demarcation has been done Greater Noida Industrial Development Authority (GNIDA) is shown as per Site Plan.

Boundary Wall

Boundary wall shall be secured by natural wall of out facing shops other barrier.

Road Work

Road Work will be done using R.C.C. /interlocking tiles as per Sanctioned Plan.

Footpaths

Footpath will be constructed using interlocking / Paver as per Sanctioned Plan.

Water Supply Including Drinking Water Facilities

Drinking Water will be provided by government supply and it will be stored in under ground / overhead tanks STP treated water will be available for gardening and flushing as per plans.

Sewer System

Proper Sewerage system will be constructed using R.C.C. /UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.

Drain

Draining System will be constructed using R.C.C./UPVC pipes as per drawings.

Parks

No

Tree Planting

Sufficient number of trees as per Sanctioned Layout will be planted in the Project.

Design For Electric Supply Including Street Lighting

HT Electrical supply will be made by NPCL/ competent authority, a sub station will be set-up in Project as per drawings and LT electrical supply will be available for individual unit(s). Sufficient power backup arrangement will be made using DG sets. Street Lighting will be done using LT supply/ Power back-up.

Community Buildings

No

Treatment and Disposal System of Sewage and Sullage water

Sewerage Treatment plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.

Solid Waste Management And Disposal System

Solid waste will be collected manually and disposal will be done as per norms.

Water Conservation System

Water conservation will be done by rain water harvesting system and through Sewerage Treatment Plant(STP)

Energy Management System Including Use of Renewable Energy

Good quality and approved brand equipment will be used in sub station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.

Fire Protection And Fire Safety System

Fire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Shopping Complex, Food Court are available in the Project.

Emergency Evacuation Services

Fire staircase refuge area will provided as per requirement for evacuation in case of any emergency.

Other Miscellaneous Work

Proper security system including security guards, CCTV Cameras and controlled access will be made available.

Documents

Lease Deed

No: Lease Deed No. 19931 | Date: 02-07-2024

Allotment Letter issued by Competent Authority

No: Allotment Letter No.GNIDA/COM/CPS-2/2023-24/4290 | Date: 07-03-2024

Allotment Letter issued by Competent Authority

No: Possession Letter Comm/2024/913 | Date: 02-07-2024

Allotment Letter issued by Competent Authority

No: Land Dues Statement from GNIDA | Date: 03-02-2025

Details of Encumbrances

Uploaded: 14-02-2025

Commencement Certificate

Uploaded: 14-02-2025

Other Plan(If Any)

Uploaded: 14-02-2025

Proforma of Application Form

Uploaded: 14-02-2025

Proforma of Allotment Letter

Uploaded: 14-02-2025

Proforma of Conveyance Deed

Uploaded: 14-02-2025

Waste Disposal Plan

Uploaded: 14-02-2025

Water Supply Plan

Uploaded: 14-02-2025

Electricity Supply Plan

Uploaded: 14-02-2025

Development Work Plan

Uploaded: 14-02-2025

Affidavit

Uploaded: 14-02-2025

CA CERTIFICATE

Uploaded: 19-02-2025

ARCHITECT CERTIFICATE

Uploaded: 14-02-2025

ENGINEERS CERTIFICATE

Uploaded: 05-03-2025

Other

Uploaded: 14-02-2025

Proforma of Agreement for Sale

Uploaded: 14-02-2025

Permits

Orignal Permit NoPLG/BP SM-16-AUG-2024.22253
Orignal Permit Date16-01-2025
Valid Upto15-01-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-01-2035
End Date15-01-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Design Square
Contractor AddressF-2, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh,PIN-201001
Architect NameGian Prakash Mathur
Architect AddressC-55, East of Kailash, New Delhi, PIN-110065
Architect Licence NumberCA /1980/5769
Structural Engineer NameAbha Gupta
Structural Engineer AddressC-28, East of Kailash, New Delhi, PIN- 110065
Mobile number(Project Co-ordinator)9717945999

Land Details

AFS

Showing 1 blocks with 301 units

Property Summary

Total Carpet Area

6025.37 m²

64856.48 ft²

Total Units

296

3 different types

Blocks & Floors

1

17 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:20.36 m²
Balconies:186
Parking ratio:0.00 per unit

Block Commercial

301 units

Khasra Details

Total Area

2580.00 m²

27770.86 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSLC-3/1, Sector Alpha-II, Greater NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201310
Area(In Sq. Mt.)2580

Other Details

Contractor Name (if any)Design Square
Contractor AddressF-2, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh,PIN-201001
Architect NameGian Prakash Mathur
Architect AddressC-55, East of Kailash, New Delhi, PIN-110065
Architect Licence NumberCA /1980/5769
Structural Engineer NameAbha Gupta
Structural Engineer AddressC-28, East of Kailash, New Delhi, PIN- 110065
Mobile number(Project Co-ordinator)9717945999