Launch Date
Completion Date
RERA ID
28.48
77.53
18324 Sq.ft. built-up area to be developed.
NA
Yes, RCC TRIMIX ROAD OR BITUMAN ROAD WITH KARBSTONE ON SIAD. STONE PAVING IN FRONT OF TOWER.
YES, CEMENT CONCRETE STONE AND GRASS PAVERS.
Yes , as per approved plan. GNOIDA water supply system collected in under ground water reservoirs and pumped to terrace tanks filled with Hydro penumatic.
Yes, as per approved plan, RCC/DWC hume pipe with manhole chambers and collections to intend STP as per GNIDA requirement.
Yes, as per approved plan. RCC drain water line will be use on project.
Yes, Beautiful land scape with civil work with masonary and stone with horticultuer work and various types of planation.
Tree planting all along road in the project.
Yes, as per approved plan.
NA
Yes, S.T.P and through GNIDA sewerage system as applicable.
Yes, Organic waste convertor, collection bins and segregation table as per master plan. approved by GNIDA.
Rain water harvesting pits drip irrigation with sprinklers as per master plan approved by GNIDA.
Yes, Solar Energy Lights in common area sand external area.
yes, Sprinklers system, Yard and sanitary facilites on stilt floor of every tower.
Yes, proper water supply and sanitary facilities on stilt floor of every tower.
Yes, as per approved plan.
na
Showing 3 blocks with 6 units
Total Carpet Area
19155.00 m²
206182.50 ft²
Total Units
6
1 different types
Blocks & Floors
3
2 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
80961.00 m²
871456.11 ft²