Noida Expressway

Noida

On the map

Overview

RERA projects
72
+118 not yet checked
Median ₹/sq ft
₹18,500
apartments, ₹11,000–40,000
Past RERA date
13 (18%)
neither ready to move nor cancelled
Since launch
+14%
median change, 24 projects
Due 2026–2028
6,676 homes
in 22 projects, by RERA date
Builders
33
Most active: ATS Infrastructure, Godrej
Sectors
67
Metro stations
20
in or within 1 km
Main road
Noida-Greater Noida Expressway
Projects by stage
  • 14 new launch
  • 26 under construction
  • 26 ready to move
  • 6 stalled or on hold

Projects

72 projects checked by our team

Sort byNamePrice₹/sq ftRERA date

  • No photo yet
    Stalled or on holdMixed-Use

    Supernova Astralis Phase 3

    SUPERTECH REALTORS PRIVATE LIMITED, Sector 94

    RERA date
    31 Dec 2018past its RERA date

    64.5 km from Noida-Greater Noida Expressway

  • No photo yet
    Stalled or on holdResidential

    Supernova Spira (Phase 2)

    SUPERTECH REALTORS PRIVATE LIMITED, Sector 94

    RERA date
    28 Sep 2023past its RERA date, extended 2 times

    64.5 km from Noida-Greater Noida Expressway

  • No photo yet
    Stalled or on holdMixed-Use

    Supertech Nova Retail

    SUPERTECH REALTORS PRIVATE LIMITED, Sector 94

    RERA date
    27 Oct 2023past its RERA date, extended once

    64.5 km from Noida-Greater Noida Expressway

  • Where it is in the area. No photo yet.
    Stalled or on holdResidential

    Unitech Burgendy

    UNITECH HI-TECH DEVELOPERS LIMITED

    RERA date
    30 Jun 2022past its RERA date, extended once

    200 m from Noida-Greater Noida Expressway

  • Where it is in the area. No photo yet.
    Stalled or on holdResidential

    Unitech Willows

    UNITECH HI-TECH DEVELOPERS LIMITED

    RERA date
    31 Jul 2019past its RERA date

    200 m from Noida-Greater Noida Expressway

118 more RERA projects here, not yet checked by our teamFound by their RERA address or map point. Not counted in the numbers on this page.
  • 168xaviers - Cambridge And Crystal
    OPULENT INFRADEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • 168xaviers - Mariott Tower
    OPULENT INFRADEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Mar 2019; inside the outline on the map
  • ACE Mahagun Medalleo
    ACE Group, Gautam Buddha Nagar
    RERA completion 7 Sep 2029; inside the outline on the map
  • Ace Medley Avenue
    ACE Group, Gautam Buddha Nagar
    RERA completion 30 May 2024; inside the outline on the map
  • Advant Navis Business Park
    ADVANT IT PARK PVT. LTD., Gautam Buddha Nagar
    RERA completion 29 Jun 2021; inside the outline on the map
  • Alphathum Phase - Iv
    Bhutani Infra, Gautam Buddha Nagar
    RERA completion 27 Aug 2022; inside the outline on the map
  • Alphathum Phase 1
    Bhutani Infra, Gautam Buddha Nagar
    RERA completion 1 May 2020; inside the outline on the map
  • Alphathum Phase 2
    Bhutani Infra, Gautam Buddha Nagar
    RERA completion 1 May 2020; inside the outline on the map
  • Amadeus
    SAHA INFRATECH PVT LTD, Gautam Buddha Nagar
    RERA completion 29 Dec 2021; inside the outline on the map
  • Antriksh Golf City - Commercial
    CONTEND INFRASTRUCTURE PRIVATE LIMITED ( ANTRIKSH, Gautam Buddha Nagar
    RERA completion 30 Jan 2024; inside the outline on the map
  • Antriksh Golf City ( Phase Iii )
    CONTEND INFRASTRUCTURE PRIVATE LIMITED ( ANTRIKSH, Gautam Buddha Nagar
    RERA completion 30 Jun 2023; inside the outline on the map
  • Antriksh Golf City ( Phase Iv )
    CONTEND INFRASTRUCTURE PRIVATE LIMITED ( ANTRIKSH, Gautam Buddha Nagar
    RERA completion 30 Jan 2024; inside the outline on the map
  • Antriksh Golf City ( Phase V)
    CONTEND INFRASTRUCTURE PRIVATE LIMITED ( ANTRIKSH, Gautam Buddha Nagar
    RERA completion 30 Jan 2024; inside the outline on the map
  • Antriksh Golf View Ii - Phase I
    COLORFUL ESTATES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 1 Dec 2017; inside the outline on the map
  • Antriksh Golf View Ii ( Phase Ii)
    COLORFUL ESTATES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 24 May 2018; inside the outline on the map
  • Antriksh Golf View Ii- Commercial
    COLORFUL ESTATES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • Antriksh Grand View
    CONSORTIUM INFRASTRUCTURE PVT LTD (ANTRIKSH INDIA, Gautam Buddha Nagar
    RERA completion 30 Sep 2022; inside the outline on the map
  • Antriksh Grand View (Antriksh India Group)
    KAILASHPURI BULIDTECH PRIVATE LIMITED (ANTRIKSH IN, Gautam Buddha Nagar
    RERA completion 30 Sep 2022; inside the outline on the map
  • Arqis Mall
    ADONIS BUILDTECH PRIVATE LIMITED, Plot No. C3-E2, Sector 129, Jaypee Wish Town
    RERA completion 31 Mar 2031; inside the outline on the map
  • Artham (Formerly Broadwalk)
    WIZTOWN PLANNERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 28 Mar 2021; inside the outline on the map
  • Assotech Celeste Towers
    ASSOTECHLIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2019; inside the outline on the map
  • Ats Bouquet
    ATS Infrastructure, Gautam Buddha Nagar
    RERA completion 18 Feb 2022; inside the outline on the map
  • Ats Kinghood Drive
    ATS Infrastructure, Gautam Buddha Nagar
    RERA completion 25 Apr 2023; inside the outline on the map
  • Ats Pristine-Phase-Ii
    ATS Infrastructure, Gautam Buddha Nagar
    RERA completion 29 Jun 2023; inside the outline on the map
  • Avenue 133
    FRANKLIN INFRATECH PVT. LTD., Gautam Buddha Nagar
    RERA completion 26 Sep 2028; inside the outline on the map
  • Aypee Greens Pavilion Courts & Heights (Phase Ii),
    JAIPRAKASH ASSOCIATES LIMITED, Gautam Buddha Nagar
    RERA completion 29 Mar 2021; inside the outline on the map
  • Blossom County(Phase-3tower-J1, K ,n & Club )
    LOGIX INFRASTRUCTURE PVT.LTD., Gautam Buddha Nagar
    RERA completion 31 Oct 2018; inside the outline on the map
  • Blossom Zest (Phase -1 Tower- A ,b,c,& Sat-1 &2 )
    LOGIX CITY DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 30 Nov 2018; inside the outline on the map
  • Blossom Zest (Phase 2 Tower- D,e,f & Club)
    LOGIX CITY DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 30 Jun 2022; inside the outline on the map
  • Blossom Zest(Phase -3 Tower- Sat- 3,4,&7)
    LOGIX CITY DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 30 Jun 2022; inside the outline on the map
  • Blossom Zest(Phase- 4,tower- Sat-8,9 &10)
    LOGIX CITY DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 30 Jun 2022; inside the outline on the map
  • Capital City
    BPTP, Gautam Buddha Nagar
    RERA completion 29 Dec 2020; inside the outline on the map
  • Central Ikon
    BUSINESS BAY FIN INFRA PRIVATE LIMITED, NOIDA
    RERA completion 26 May 2029; inside the outline on the map
  • Central Plaza
    AIMS ANGEL INFRATECH LLP, Gautam Buddha Nagar
    RERA completion 31 Dec 2022; inside the outline on the map
  • Commercial Complex By Kk Projects At Delhi One
    KK PROJECTS, Gautam Buddha Nagar
    RERA completion 30 Apr 2018; inside the outline on the map
  • Cyberthum Phase A
    Bhutani Infra, Gautam Buddha Nagar
    RERA completion 25 Feb 2025; inside the outline on the map
  • Daffodil Tower L (Elements & Convinient Shops)
    MPG REALTY PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Jul 2018; inside the outline on the map
  • Dasnac Place
    WESTRIVER PRIVATE LIMITED, NOIDA
    RERA completion 1 Apr 2029; inside the outline on the map
  • Dasnac Westminster
    E HOMES INFRASTRUCTURE PVT LTD, NOIDA
    RERA completion 22 Apr 2029; inside the outline on the map
  • Dasnac Yuva
    CLEARLAKE PRIVATE LIMITED, SECTOR 124
    RERA completion 24 Oct 2029; inside the outline on the map
  • Dlf Techpark Noida
    DLF, Gautam Buddha Nagar
    RERA completion 1 Apr 2024; inside the outline on the map
  • Dlf Techpark Noida Phase 2
    DLF, Plot No.1, Sector 143A, Noida, Gautam Buddha Nagar, U.P
    RERA completion 30 Sep 2026; inside the outline on the map
  • Elixir Mall
    SDS INFRASTRUCTURE PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 9 Aug 2018; inside the outline on the map
  • Eminence - Phase 1
    ABET BUILDCON PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2023; inside the outline on the map
  • Eminence Phase-2
    ELICIT REALTECH PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Nov 2024; inside the outline on the map
  • Exotica 132
    Exotica Housing, Sector 132, Noida
    RERA completion 10 Jan 2030; inside the outline on the map
  • Eye Of Noida (Eon) - Block-A
    FAIRFOX ITINFRA PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2025; inside the outline on the map
  • Eye Of Noida (Eon) Block -B And D
    FAIRFOX ITINFRA PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 3 Feb 2027; inside the outline on the map
  • Eye Of Noida (Eon) Block-E
    FAIRFOX ITINFRA PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Jan 2027; inside the outline on the map
  • Gh-07/75 Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jan 2021; inside the outline on the map
  • Gh-08/75 (Phase-1) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-08/75 (Phase-2) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-08/75 (Phase-3) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-11/75 (Phase-1) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-11/75 (Phase-2) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-11/75 (Phase-3) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Gh-11/75 (Phase-4) Golf City
    AIMS MAX GARDENIA DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 5 Mar 2020; inside the outline on the map
  • Glory 46 (Phase-1)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-2)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-3)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-4)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-5)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-6)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Glory 46 (Phase-7)
    GARDENIA AIMS DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 14 Apr 2021; inside the outline on the map
  • Greatvalue Anandam
    Great Value, Gautam Buddha Nagar
    RERA completion 30 Mar 2023; inside the outline on the map
  • Gulshan Ikebana -Towers L,m,n,o,p & Q
    Gulshan, Gautam Buddha Nagar
    RERA completion 28 Dec 2016; inside the outline on the map
  • Jaypee Greens Aman, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2019; inside the outline on the map
  • Jaypee Greens Garden Isles, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 29 Dec 2021; inside the outline on the map
  • Jaypee Greens Imperial Arcade, Noida
    JAIPRAKASH ASSOCIATES LIMITED, Gautam Buddha Nagar
    RERA completion 31 Oct 2017; inside the outline on the map
  • Jaypee Greens Kalypso Court (Phase Ii), Noida
    JAIPRAKASH ASSOCIATES LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2018; inside the outline on the map
  • Jaypee Greens Kasa Isles, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 9 Oct 2027; inside the outline on the map
  • Jaypee Greens Kensignton Boulevard Apartments, Noi
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2025; inside the outline on the map
  • Jaypee Greens Kensington Park Apartments, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2019; inside the outline on the map
  • Jaypee Greens Klassic Arcade, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 30 Apr 2018; inside the outline on the map
  • Jaypee Greens Krescent Homes, Noida
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2025; inside the outline on the map
  • Jc World Hospitality Private Limited
    RITA DIXIT, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • Lotus 300 (Tower 3-6, Club And Commercial Building
    HACIENDA PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Lotus Boulevard T-28, T-29 And T-30
    GRANITE GATE PROPERTIES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Lotus Isle (Residential)
    THREE C PROPERTIES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Sep 2021; inside the outline on the map
  • Lotus Panache (Tower 1-4, 14-31, Club And Commerci
    GRANITE GATE PROPERTIES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2023; inside the outline on the map
  • Lotus Zing (Tower 3-14), Club And Commercial Build
    THREE C PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Mahagun Manorial
    MAHAGUN (INDIA) PVT. LTD., Gautam Buddha Nagar
    RERA completion 29 Mar 2024; inside the outline on the map
  • Max Towers
    Max Estates, Gautam Buddha Nagar
    RERA completion 29 Oct 2021; inside the outline on the map
  • Mentis
    GYGY INFRADESIGN PVT.LTD., Gautam Buddha Nagar
    RERA completion 28 Mar 2028; inside the outline on the map
  • Neoworld ( Phase-1 Tower-D, E &f)
    LOGIX INFRA DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Noida World One - Phase 1
    CBS INTERNATIONAL PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Nov 2020; inside the outline on the map
  • Noida World One - Phase 2
    CBS INTERNATIONAL PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Nov 2020; inside the outline on the map
  • Noida World One - Phase 3
    CBS INTERNATIONAL PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 16 Mar 2023; inside the outline on the map
  • Noida World One - Phase 5
    CBS INTERNATIONAL PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Oct 2022; inside the outline on the map
  • Noida World One Phase - 4
    CBS INTERNATIONAL PROJECTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2022; inside the outline on the map
  • Onyx Blue
    SPLENDOR INFORMATION TECHNOLOGY PRIVATE LIMITED, Sector 142, Noida
    RERA completion 30 Jun 2030; inside the outline on the map
  • Orion One 32
    WELLGROW INFOTECH PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2026; inside the outline on the map
  • Parx Laureate
    LAUREATE BUILDWELL PRIVATE LIMITED, Gautam Buddha Nagar
    inside the outline on the map
  • Pebble Court
    JAYPEE INFRATECH LIMITED, Gautam Buddha Nagar
    RERA completion 18 Jul 2026; inside the outline on the map
  • Pebbles Prolease Pvt Ltd (Heartbeat City
    ASHISH BAJPAI, Gautam Buddha Nagar
    RERA completion 30 Apr 2022; inside the outline on the map
  • Pious Hideaways
    HOMEKRAFT INFRA PRIVATE LIMITEDFEST HOMES DEVELOPERS PVT. LTD., Gautam Buddha Nagar
    RERA completion 30 Sep 2026; inside the outline on the map
  • Saya Piazza
    Saya Homes, Gautam Buddha Nagar
    RERA completion 20 Oct 2026; inside the outline on the map
  • Sethi Venice Phase I (Tower A , B , L , M , Conven
    ESTHETIC BUILDTECH PVT. LTD., Gautam Buddha Nagar
    RERA completion 30 Mar 2024; inside the outline on the map
  • Sikka Kaamna Greens
    KINDLE INFRAHEIGHTS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 28 Sep 2022; inside the outline on the map
  • Sikka Karnam Greens
    SIKKA INFRASTRUCTURE PVT LTD, Gautam Buddha Nagar
    RERA completion 29 Dec 2022; inside the outline on the map
  • Sunworld Vanalika Phase-Ii
    SUNWORLD DEVELOPERS PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2017; inside the outline on the map
  • Supertech Ecociti - Phase-1
    SUPERTECH LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2018; inside the outline on the map
  • Surya Appartment-1
    SURYANSH BUILDMART PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 1 Dec 2018; inside the outline on the map
  • Svg Galleria
    SVG GALLERIA PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 31 Dec 2023; inside the outline on the map
  • The Downtown
    GRANITE HILL PROPERTIES PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2023; inside the outline on the map
  • The Flagship Phase 3
    CRC Group, Sector-140A
    RERA completion 16 Nov 2027; inside the outline on the map
  • The Golden Palms (Tower A,b,l,m,n)
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 31 Mar 2018; inside the outline on the map
  • The Golden Palms (Tower-O)
    Nimbus Group, Gautam Buddha Nagar
    RERA completion 31 Dec 2018; inside the outline on the map
  • The Golf Address
    IMPLEX INFRASTRUCTURE PVT. LTD., Gautam Buddha Nagar
    RERA completion 14 Oct 2022; inside the outline on the map
  • The Golf Street Hub
    GEN X ESTATE LLP, Gautam Buddha Nagar
    RERA completion 30 Sep 2022; inside the outline on the map
  • The Resident Tower
    HALE REALTORS PVT. LTD., Gautam Buddha Nagar
    RERA completion 24 Oct 2024; inside the outline on the map
  • To-Day
    AMA TOWERS LLPLOGIX INFRATECH PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 15 Nov 2020; inside the outline on the map
  • Unitech Amber
    UNITECH HI-TECH DEVELOPERS LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2021; inside the outline on the map
  • Unnati Fortune World - Phase 1
    IVR PRIME IT. SEZ PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2025; inside the outline on the map
  • Unnati Fortune World - Phase 2
    IVR PRIME IT. SEZ PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jun 2025; inside the outline on the map
  • Utc Softech
    UTC SOFTECH PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 30 Jul 2019; inside the outline on the map
  • Victory Ace
    DREAM PROCON PRIVATE LIMITEDLOGIX CITY DEVELOPERS PVT.LTD., Gautam Buddha Nagar
    RERA completion 31 Dec 2019; inside the outline on the map
  • Wopl-Wone
    WAVE ONE PRIVATE LIMITED, Gautam Buddha Nagar
    RERA completion 28 Dec 2021; inside the outline on the map

Comparing projects in Noida Expressway? A ReraTracker advisor can talk you through RERA dates, builders and prices.

Prices

Builder asking prices for apartments from 33 projects, updated Nov 2025–Sep 2026.

Median ₹/sq ft
₹18,500
Lowest ₹11,000Highest ₹40,000
Since launch
+14%
median change, 24 projects

Homes by size

From the unit types builders list. Carpet efficiency is the carpet area as a share of the area you pay for.

  • 2 BHK

    9 projects

    ₹1.3–2.93 Cr

    Carpet
    773 sq ft
    Efficiency
    59%
    ₹/carpet sq ft
    ₹23,829
  • 3 BHK

    23 projects

    ₹1.67–8.11 Cr

    Carpet
    1,350 sq ft
    Efficiency
    61%
    ₹/carpet sq ft
    ₹26,297
  • 4 BHK

    22 projects

    ₹3.86–16.59 Cr

    Carpet
    2,126 sq ft
    Efficiency
    55%
    ₹/carpet sq ft
    ₹42,110
  • 5 BHK

    5 projects

    ₹10.62–32.71 Cr

    Carpet
    3,166 sq ft
    Efficiency
    57%
    ₹/carpet sq ft
    ₹42,802
  • Penthouse Duplex

    4 projects

    ₹10.37–33.8 Cr

    Carpet
    5,401 sq ft
    Efficiency
    55%
    ₹/carpet sq ft
    ₹50,644

Delivery record

RERA completion dates after extensions, from the RERA filings.

Past RERA date
13
neither ready to move nor cancelled
Given extensions
31
of 72 UP RERA projects
With a RERA date
72
of 72 projects

Projects due each year

Due 2026–2028: 22 projects, 6,676 homes

By RERA completion year. Hatched columns are years already past.

  1. 2018: 2 projects, 421 homes, past
  2. 2019: 2 projects, past
  3. 2020: 0 projects, past
  4. 2021: 2 projects, past
  5. 2022: 6 projects, 973 homes, past
  6. 2023: 7 projects, 2,142 homes, past
  7. 2024: 4 projects, 349 homes, past
  8. 2025: 12 projects, 6,174 homes, past
  9. 2026: 3 projects, 1,769 homes
  10. 2027: 10 projects, 1,723 homes
  11. 2028: 9 projects, 3,184 homes
  12. 2029: 5 projects, 1,412 homes
  13. 2030: 8 projects, 2,483 homes
  14. 2031: 2 projects, 1,054 homes

Builders here

Most projects first. A chip marks projects past their RERA date, lapsed or extended; no chip means none.

Show all 33 builders

Sectors

Our team defines each micro-market by its sectors; a sector can belong to more than one. Prices are the median apartment ₹/sq ft where 3 or more projects list one.

Most projects first; deeper tiles have more.

  • Sector 150

    17 projects₹14,000/sq ft

    Also in Sports City

  • Sector 94

    7 projects

  • Sector 128

    6 projects₹25,500/sq ft

  • Sector 107

    2 projects

  • Sector 146

    2 projects

  • Sector 151

    2 projects

  • Sector 168

    2 projects

  • Sector 16B

    1 project

Show all 17 sectors
  • Sector 44

    1 project

    Also in Central Noida

  • Sector 45

    1 project

  • Sector 97

    1 project

  • Sector 98

    1 project

  • Sector 105

    1 project

  • Sector 142

    1 project

  • Sector 144

    1 project

  • Sector 152

    1 project

  • Sector 153

    1 project

Also covers sectors 46, 86, 90–93, 93A, 93B, 96, 100, 104, 108, 110, 124–127, 129–137, 140, 143, 143A, 143B, 145, 147, 148, 148A, 149, 151A, 154–160, 163–167, 167A and 167B, with no checked projects yet.

24 projects with no recorded sector of this micro-market.

What’s around

Named places inside the micro-market, then those within 1 km of its edge.

20 metro stations

  • Noida Sector 83
  • NSEZ
  • Noida Sector 137
  • Noida Sector 142
  • Noida Sector 143
  • Noida Golf Course
  • Noida Sector 144
  • Botanical Garden (Blue Line)
  • and 12 more

24 schools

  • Delhi Public School
  • Genesis Global School
  • JBM Global School
  • Step by Step School
  • Indraprastha Global School
  • Somerville International School
  • Jaypee Public School
  • SKS World School, SEctor 137 Noida
  • and 16 more

2 colleges and universities

  • Panchsheel Balak Inter College
  • Amity University, Noida

16 hospitals

  • J S Tomar Memorial Hospital Pvt. Ltd. - Noida
  • Yatharth Hospital, Gautam Buddha Nagar
  • Ganpati Hospitaland Maternity Centre
  • Felix Hospital
  • Bhardwaj Hospital
  • Vinayak Hospital
  • Max Hospital
Within 1 km:
  • Prayag Hospital
  • and 8 more

7 malls

  • SAYA Status Mall
  • Starling Mall
  • Commercial 1 , Paras Tierea
  • The Great India Place
  • Wave Mall
  • DLF Mall Of India
Within 1 km:
  • Bhutani City Center 32

6 markets

  • F-Block Market, Sector 40
  • Brahmaputra complex
Within 1 km:
  • Sector 41 C-Block Market
  • B-Block Market, Sector 41
  • Sector 50 Market
  • Jaipuriya Plaza

39 parks

  • Sector 93A Park
  • Supertech Central Park
  • Sector 132 Park
  • Sector 128 Park
  • Sector 108 Noida Central Park
  • Main Ground
  • JIIT-128 Campus Ground
  • Tirkona park
  • and 31 more

Map data © OpenStreetMap contributors. Outlines are approximate.

News

About projects here first, then about builders active here.

Nearby micro-markets

How Noida Expressway compares with the micro-markets around it.

  • New launch
  • Under construction
  • Ready to move
  • Stalled or on hold
  • Cancelled
  • Noida Expressway

    This micro-market

    72 projects₹18,500/sq ft18% past date

  • 15 projects₹18,500/sq ft0% past date

  • 24 projects₹14,000/sq ft42% past date

  • Greno Sectors

    Greater Noida

    18 projects₹15,500/sq ft6% past date

  • Greater Noida

    Greater Noida

    23 projects₹16,500/sq ft9% past date

  • 2 projectsNo price yet

  • Jaypee Greens

    Greater Noida

    5 projects₹28,500/sq ft20% past date

Frequently asked questions

How many RERA projects are in Noida Expressway?

ReraTracker lists 72 RERA-registered projects in Noida Expressway, checked by our team.

What is the price per sq ft in Noida Expressway?

The median builder asking price for apartments in Noida Expressway is ₹18,500 per sq ft, from ₹11,000 to ₹40,000, across 33 priced projects, updated Nov 2025–Sep 2026.

Which builders have projects in Noida Expressway?

The builders with the most projects in Noida Expressway are ATS Infrastructure, Godrej and Max Estates.

Which sectors are in Noida Expressway?

Noida Expressway covers sectors 16B, 44–46, 86, 90–93, 93A, 93B, 94, 96–98, 100, 104, 105, 107, 108, 110, 124–137, 140, 142, 143, 143A, 143B, 144–148, 148A, 149–151, 151A, 152–160, 163–167, 167A, 167B and 168. Its boundary is approximate.

How many projects in Noida Expressway are past their RERA completion date?

13 projects in Noida Expressway are past their RERA completion date and are neither ready to move nor cancelled.

Projects and dates come from RERA filings (UP RERA, HRERA and Delhi RERA) and ReraTracker’s research. Prices are builder asking prices. Outlines are approximate. Map data © OpenStreetMap contributors.