OngoingActive

VICTORY ACE

Gautam Buddha Nagar, Uttar Pradesh
15-10-2012
Launch Date
Ongoing
Type
31-12-2019
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

31-12-2019

RERA ID

UPRERAPRJ332663

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)12110
Project NameVICTORY ACE
Registration Fee (in Rs.)66000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)87
DistrictGautam Buddha Nagar
Original Start Date15-10-2012
TehsilGautam Buddha Nagar
Proposed Start Date15-10-2012
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)17500
Proposed Completion Date31-12-2019

Location

Latitude

28.559290

Longitude

77.359299

Bank Details

Account no.90961010013774
Name Of Account HolderDream Procon Pvt. Ltd.
Bank NameSyndicate Bank
Branch AddressNew Delhi – 110034(Delhi)
Branch NameNetaji Subhash Place, PitamPura
IFSC CodeSYNB0009096

Development Works

Demarcation of Plots

By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.

Boundary Wall

Brick work wall upto 2.5 mt. high and designing columns upto 6.8 mt high has been Provided.

Road Work

R.C.C Road Finishing (trimix) 6.0 m wide has been Provided.

Footpaths

1.5 m wide path with interlocking tiles finishing has been Provided.

Water Supply Including Drinking Water Facilities

Bore-well water, government supply line facilities .

Sewer System

S.T.P System , collection of all sewerage though sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation, and car washing etc.

Drain

All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises.

Parks

There are mounds , kids play area, bad-Minton court, sitting benches etc.

Tree Planting

Tree planting along with the boundary and parks area.

Design For Electric Supply Including Street Lighting

From UPPCL to Meter Room and line connected to HT Panel Room then Divided in LT Panel for all towers area .

Community Buildings

11500 Sq ft. Area provided in this area is included gym area, community area, Swimming area etc.

Treatment and Disposal System of Sewage and Sullage water

Through S.T.P System and then treated the water in different stages.

Solid Waste Management And Disposal System

Disposal as per norms Premises.

Water Conservation System

Rain water Harvesting Provided 4 Nos. as per requirement.

Energy Management System Including Use of Renewable Energy

AS PER PLAN

Fire Protection And Fire Safety System

All Fire equipment using in all towers and all basements.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

All safety norms and related equipment will be providing

Other Miscellaneous Work

AS PER PLAN

Documents

Lease Deed

No: 4971 | Date: 08-06-2011

Lease Deed

No: 498708 | Date: 08-03-2013

Lease Deed

No: 2567 | Date: 08-06-2011

Details of Encumbrances

Commencement Certificate

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Affidavit

CA CERTIFICATE

Details of Encumbrances

Uploaded: 30-01-2019

Commencement Certificate

Uploaded: 30-01-2019

Other Plan(If Any)

Uploaded: 21-12-2018

Proforma of Application Form

Uploaded: 21-12-2018

Proforma of Allotment Letter

Uploaded: 21-12-2018

Waste Disposal Plan

Uploaded: 08-03-2019

Water Supply Plan

Uploaded: 08-03-2019

Electricity Supply Plan

Uploaded: 21-12-2018

Development Work Plan

Uploaded: 08-03-2019

Affidavit

Uploaded: 08-03-2019

ARCHITECT CERTIFICATE

Uploaded: 21-12-2018

ENGINEERS CERTIFICATE

Uploaded: 21-12-2018

Permits

Orignal Permit NoNOIDA/M.V.N/2018/III-250/715
Orignal Permit Date08-01-2014
Valid Upto07-01-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto06-08-2020
End Date31-12-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Moon construction - Asha Enterprises
Contractor AddressK-189, Gautam Vihar Delhi-110053 ----Goyal Colony, Bhangel Noida, G.B. Nagar
Architect NameGian P. Mathur and Associates
Architect AddressC-55, East Of Kailash New Delhi-110065
Architect Licence Number80/5769
Structural Engineer NameAthar Tauheed
Structural Engineer Address1st FLOOR, H-53, OPP. VIJAYA BANK COMMERCIAL AREA, SECTOR-63, NOIDA UP.
Mobile number(Project Co-ordinator)8527693031

Land Details

AFS

Showing 9 blocks with 324 units

Property Summary

Total Carpet Area

47240.47

508491.70 ft²

Total Units

526

2 different types

Blocks & Floors

9

27 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.81
Balconies:1296
Parking ratio:0.00 per unit

Block TOWER A 1

53 units

Block TOWER A 2

26 units

Block TOWER B 1

21 units

Block TOWER B 2

23 units

Block TOWER C 1

40 units

Block TOWER C 2

40 units

Block TOWER C 3

40 units

Block TOWER D 1

40 units

Block TOWER D 2

41 units

Khasra Details

Total Area

12.00

129.17 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot No. GH-02, Sector-143 Noida, Di
Area(In Sq. Mt.)12,110.00 Sq.mt

Other Details

Contractor Name (if any)Moon construction - Asha Enterprises
Contractor AddressK-189, Gautam Vihar Delhi-110053 ----Goyal Colony, Bhangel Noida, G.B. Nagar
Architect NameGian P. Mathur and Associates
Architect AddressC-55, East Of Kailash New Delhi-110065
Architect Licence Number80/5769
Structural Engineer NameAthar Tauheed
Structural Engineer Address1st FLOOR, H-53, OPP. VIJAYA BANK COMMERCIAL AREA, SECTOR-63, NOIDA UP.
Mobile number(Project Co-ordinator)8527693031