Launch Date
Completion Date
RERA ID
28.559290
77.359299
By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.
Brick work wall upto 2.5 mt. high and designing columns upto 6.8 mt high has been Provided.
R.C.C Road Finishing (trimix) 6.0 m wide has been Provided.
1.5 m wide path with interlocking tiles finishing has been Provided.
Bore-well water, government supply line facilities .
S.T.P System , collection of all sewerage though sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation, and car washing etc.
All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises.
There are mounds , kids play area, bad-Minton court, sitting benches etc.
Tree planting along with the boundary and parks area.
From UPPCL to Meter Room and line connected to HT Panel Room then Divided in LT Panel for all towers area .
11500 Sq ft. Area provided in this area is included gym area, community area, Swimming area etc.
Through S.T.P System and then treated the water in different stages.
Disposal as per norms Premises.
Rain water Harvesting Provided 4 Nos. as per requirement.
AS PER PLAN
All Fire equipment using in all towers and all basements.
Not Applicable
All safety norms and related equipment will be providing
AS PER PLAN
Showing 9 blocks with 324 units
Total Carpet Area
47240.47 m²
508491.70 ft²
Total Units
526
2 different types
Blocks & Floors
9
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12.00 m²
129.17 ft²