Launch Date
Completion Date
RERA ID
28.42300277777778
77.485575
By fixing co-ordinate point with all dimensions and tangents as per given approved drawings
Having Brick Works upto 2.0 m height with RCC beam and column frame work
R.C.C road finishing(trimix) 6.0 m wide has been provided
1.5 m wide path with interlocking tiles finishing has been provided
Government supply line facilities. From U.G. tanks treated water to over head tanks and from over head tanks to individual flats services.
S.T.P system, collection of al sewerage through sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation and car washing etc.
All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises.
There are mounds, kid play area, badminton court, sitting benches etc.
Tree planting along with boundary and park area.
From UPPCL to meter room and line connected to HT panel room then divided in LT panel for all towers area.
Community area includes gym area,community area, swimming area etc.
Through S.T.P system and then treated the water in different stages
Disposal as per norms premises
Rain water harvesting provided as per requirement
Solar water heating system shall be provided
All fire equipment using in all towers and all basements
Not applicable
All safety norms and related equipment will be provided.
NIL
Showing 4 blocks with 47 units
Total Carpet Area
27300.40 m²
293858.78 ft²
Total Units
245
3 different types
Blocks & Floors
4
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13000.00 m²
139930.70 ft²