Eminence Phase-2

Gautam Buddha Nagar, Uttar Pradesh
01-06-2019
Launch Date
New
Type
30-11-2024
Completion Date

Overview

Launch Date

01-06-2019

Completion Date

30-11-2024

RERA ID

UPRERAPRJ828955

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)13000
Project NameEminence Phase-2
Registration Fee (in Rs.)70000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)66
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-06-2019
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)20000
Proposed Completion Date30-11-2024

Location

Latitude

28.42300277777778

Longitude

77.485575

Bank Details

Account no.917020059017526
Name Of Account HolderElicit Realtech Private Limited
Bank NameAxis Bank Limited
Branch AddressSector-51, Noida
Branch NameNoida
IFSC CodeUTIB0001149

Development Works

Demarcation of Plots

By fixing co-ordinate point with all dimensions and tangents as per given approved drawings

Boundary Wall

Having Brick Works upto 2.0 m height with RCC beam and column frame work

Road Work

R.C.C road finishing(trimix) 6.0 m wide has been provided

Footpaths

1.5 m wide path with interlocking tiles finishing has been provided

Water Supply Including Drinking Water Facilities

Government supply line facilities. From U.G. tanks treated water to over head tanks and from over head tanks to individual flats services.

Sewer System

S.T.P system, collection of al sewerage through sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation and car washing etc.

Drain

All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises.

Parks

There are mounds, kid play area, badminton court, sitting benches etc.

Tree Planting

Tree planting along with boundary and park area.

Design For Electric Supply Including Street Lighting

From UPPCL to meter room and line connected to HT panel room then divided in LT panel for all towers area.

Community Buildings

Community area includes gym area,community area, swimming area etc.

Treatment and Disposal System of Sewage and Sullage water

Through S.T.P system and then treated the water in different stages

Solid Waste Management And Disposal System

Disposal as per norms premises

Water Conservation System

Rain water harvesting provided as per requirement

Energy Management System Including Use of Renewable Energy

Solar water heating system shall be provided

Fire Protection And Fire Safety System

All fire equipment using in all towers and all basements

Social Infrastructure And Other Public Amenities Including Public Health Services

Not applicable

Emergency Evacuation Services

All safety norms and related equipment will be provided.

Other Miscellaneous Work

NIL

Documents

Lease Deed

No: I-15071 | Date: 26-12-2013

Lease Deed

No: 6079 | Date: 07-06-2014

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 28-02-2019

Commencement Certificate

Uploaded: 28-02-2019

Other Plan(If Any)

Uploaded: 25-03-2019

Proforma of Application Form

Uploaded: 28-02-2019

Proforma of Allotment Letter

Uploaded: 28-02-2019

Waste Disposal Plan

Uploaded: 28-02-2019

Water Supply Plan

Uploaded: 28-02-2019

Electricity Supply Plan

Uploaded: 28-02-2019

Development Work Plan

Uploaded: 28-02-2019

Affidavit

Uploaded: 30-03-2019

CA CERTIFICATE

Uploaded: 25-03-2019

ARCHITECT CERTIFICATE

Uploaded: 25-03-2019

ENGINEERS CERTIFICATE

Uploaded: 25-03-2019

Permits

Orignal Permit NoNOIDA/M.V.N/2017/IV-1502/977
Orignal Permit Date25-05-2017
Valid Upto24-05-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto24-05-2025
End Date31-05-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)INHOUSE
Contractor AddressINHOUSE
Architect NameMR. RAJIV GOEL
Architect AddressM/S R. N. GUPTA & ASSOCIATES, E-1, SECTOR-55, NOIDA
Architect Licence NumberCA/76/2361
Structural Engineer NameMr. Kamal Sabharwal
Structural Engineer AddressM/S CECON ENGG., HS-25, 2ND FLOOR, LEVEL-3, KAILASH COLONY MARKET, NEW DELHI-110048
Mobile number(Project Co-ordinator)7290039440

Land Details

AFS

Showing 4 blocks with 47 units

Property Summary

Total Carpet Area

27300.40

293858.78 ft²

Total Units

245

3 different types

Blocks & Floors

4

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:111.43
Balconies:159
Parking ratio:0.00 per unit

Block ROW HOUSE (1-7)

1 units

Block TOWER-D

15 units

Block TOWER-E

15 units

Block TOWER-F

16 units

Khasra Details

Total Area

13000.00

139930.70 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-01/CA-7
Area(In Sq. Mt.)13000

Other Details

Contractor Name (if any)INHOUSE
Contractor AddressINHOUSE
Architect NameMR. RAJIV GOEL
Architect AddressM/S R. N. GUPTA & ASSOCIATES, E-1, SECTOR-55, NOIDA
Architect Licence NumberCA/76/2361
Structural Engineer NameMr. Kamal Sabharwal
Structural Engineer AddressM/S CECON ENGG., HS-25, 2ND FLOOR, LEVEL-3, KAILASH COLONY MARKET, NEW DELHI-110048
Mobile number(Project Co-ordinator)7290039440