28'30'4.432'N
77'25'19.4772'E
The coordinates have been fixed and demarcated as per the approved masterplan.
The parcel being a part of the Project (Housing) Masterplan and located at the corner, no boundary wall has been proposed (for ease of access) along the abutting masterplan roads, due to the corner location.
Due to the corner location and abutting the masterplan roads on two sides, no internal vehicular road has been proposed. The other two sides have road access as per the Project (Housing) Masterplan.
Footpaths have been proposed as an integral part of the organised green and landscaped area.
Through Municipal water supply.
Sewage is proposed to be drained directly to the Municipal Line.
The surface drainage has been recharged through Rain water harvesting.
Organised green and landscaped areas have been proposed.
The project parcel is a part of overall Housing Masterplan which is proposed with trees as per the norms.
HT power being received and being transformed to LT voltage and being distributed to each shop through energy meters.
Not Applicable
Being a part of the Housing Masterplan, the sewage line is proposed to be connected to the central STP.
Disposal from the demarcated waste collection point.
Through low flow fixtures, sensor type urinals, dual flush cisterns.
Energy meters are being installed and no PV cells have been proposed.
Fire protection system has been proposed as per Fire Norms. Being a low rise building, Lower ground shops and storages have been provided with sprinkler system. FHCs have been proposed for the upper floors.
Not Applicable
Fire staircases have been proposed as per Fire norms and NBC for emergency evaculation.
NIL
Showing 1 blocks with 78 units
Total Carpet Area
171607.28 m²
1847163.60 ft²
Total Units
2970
2 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3915.00 m²
42140.67 ft²