NewActive

TO-DAY

Gautam Buddha Nagar, Uttar Pradesh
17-11-2018
Launch Date
New
Type
15-11-2020
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

15-11-2020

RERA ID

UPRERAPRJ780746

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)1000
Project NameTO-DAY
Registration Fee (in Rs.)50000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)24
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date17-11-2018
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)3042
Proposed Completion Date15-11-2020

Location

Latitude

28'30'4.432'N

Longitude

77'25'19.4772'E

Bank Details

Account no.157905001653
Name Of Account HolderAMA TOWERS LLP
Bank NameICICI BANK
Branch AddressSECTOR 132 NOIDA
Branch NameSECTOR NOIDA
IFSC CodeICIC0001579

Development Works

Demarcation of Plots

The coordinates have been fixed and demarcated as per the approved masterplan.

Boundary Wall

The parcel being a part of the Project (Housing) Masterplan and located at the corner, no boundary wall has been proposed (for ease of access) along the abutting masterplan roads, due to the corner location.

Road Work

Due to the corner location and abutting the masterplan roads on two sides, no internal vehicular road has been proposed. The other two sides have road access as per the Project (Housing) Masterplan.

Footpaths

Footpaths have been proposed as an integral part of the organised green and landscaped area.

Water Supply Including Drinking Water Facilities

Through Municipal water supply.

Sewer System

Sewage is proposed to be drained directly to the Municipal Line.

Drain

The surface drainage has been recharged through Rain water harvesting.

Parks

Organised green and landscaped areas have been proposed.

Tree Planting

The project parcel is a part of overall Housing Masterplan which is proposed with trees as per the norms.

Design For Electric Supply Including Street Lighting

HT power being received and being transformed to LT voltage and being distributed to each shop through energy meters.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

Being a part of the Housing Masterplan, the sewage line is proposed to be connected to the central STP.

Solid Waste Management And Disposal System

Disposal from the demarcated waste collection point.

Water Conservation System

Through low flow fixtures, sensor type urinals, dual flush cisterns.

Energy Management System Including Use of Renewable Energy

Energy meters are being installed and no PV cells have been proposed.

Fire Protection And Fire Safety System

Fire protection system has been proposed as per Fire Norms. Being a low rise building, Lower ground shops and storages have been provided with sprinkler system. FHCs have been proposed for the upper floors.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Fire staircases have been proposed as per Fire norms and NBC for emergency evaculation.

Other Miscellaneous Work

NIL

Documents

Lease Deed

No: 3858 | Date: 22-09-2010

Lease Deed

No: EG688329 | Date: 18-10-2018

Details of Encumbrances

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 08-03-2019

Commencement Certificate

Uploaded: 16-02-2019

Other Plan(If Any)

Uploaded: 08-03-2019

Proforma of Application Form

Uploaded: 16-02-2019

Proforma of Allotment Letter

Uploaded: 16-02-2019

Waste Disposal Plan

Uploaded: 16-02-2019

Water Supply Plan

Uploaded: 16-02-2019

Electricity Supply Plan

Uploaded: 16-02-2019

Development Work Plan

Uploaded: 16-02-2019

Affidavit

Uploaded: 08-03-2019

CA CERTIFICATE

Uploaded: 08-03-2019

ARCHITECT CERTIFICATE

Uploaded: 08-03-2019

ENGINEERS CERTIFICATE

Uploaded: 08-03-2019

Permits

Orignal Permit NoNOIDA/M.V.N/III-229/636
Orignal Permit Date11-04-2013
Valid Upto10-04-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-04-2021
End Date16-05-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)HULK AND HERCULES LIMITED
Contractor AddressLGF, 119(B-7),WORLDTRADE CENTRE BABAR ROAD, PLACE , NEW-DELHI 110001
Architect Name KULPREET STUDIO AMK ARCHITECTS
Architect Address156, SOMDUTT CHAMBER II, 9 BHIKAJI CAMA PLACE NEW DELHI 110066
Architect Licence NumberCA/2003/3265
Structural Engineer NameHarish Kumar Bhatt
Structural Engineer AddressM/S Pali Design 146, SOMDUTT CHAMBER II, 9 BHIKAJI CAMA PLACE NEW DELHI 110066
Mobile number(Project Co-ordinator)8239730433

Land Details

AFS

Showing 1 blocks with 78 units

Property Summary

Total Carpet Area

171607.28

1847163.60 ft²

Total Units

2970

2 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:57.78
Balconies:0
Parking ratio:0.00 per unit

Block 01

78 units

Khasra Details

Total Area

3915.00

42140.67 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01
Area(In Sq. Mt.)3915

Other Details

Contractor Name (if any)HULK AND HERCULES LIMITED
Contractor AddressLGF, 119(B-7),WORLDTRADE CENTRE BABAR ROAD, PLACE , NEW-DELHI 110001
Architect Name KULPREET STUDIO AMK ARCHITECTS
Architect Address156, SOMDUTT CHAMBER II, 9 BHIKAJI CAMA PLACE NEW DELHI 110066
Architect Licence NumberCA/2003/3265
Structural Engineer NameHarish Kumar Bhatt
Structural Engineer AddressM/S Pali Design 146, SOMDUTT CHAMBER II, 9 BHIKAJI CAMA PLACE NEW DELHI 110066
Mobile number(Project Co-ordinator)8239730433