Launch Date
Completion Date
RERA ID
28^ 31' 40''
77^ 21' 14''
"As per location of Plot : (1) Kalypso Court : Towers KT-5 to KT-10 NE - 24 m wide Master Plan approach road SE - 24 m wide approach road SW - Golf Course NW - Group Housing The Plot has been demarcated (2) Kalypso Court : Towers KT-11 & KT-12 NE - Group Housing SE - Golf Course SW - Group Housing NW - 24 wide Master Plan approach road The Plot has been demarcated"
"This Project is part of Wish Town Township. The over all boundary wall of Town Township has been constructed except few Passages (1) Kalypso Court : Towers KT-5 to KT-10 Due to cluster planning boundary wall has been constructed in front and side only as other towers of this development are interlinked. (2) Kalypso Court : Towers KT-11 & KT-12 Due to cluster planning boundary wall has been constructed in front and side only as other towers of this development are interlinked. "
"The 24 M wide approach road to the project is completed. The internal roads connecting the towers have been planned as per submission drawings. The internal roads for all towers of Kalypso Court are complete. "
The pedestrian footpaths with Kerb Stone as per Landscape Plan have been completed at Township level. The foot paths for Kalypso Court are complete.
"The pipe lines for water supply have been laid and completed at Township Level. The drinking water is being supplied through water centres after necessary treatments. The tapping points for individual towers are available and the same shall be connected before completion of Project. "
"The pipe lines for Sewer System have been laid and completed at Township Level. The Sewage is being treated at Sewerage Treatment Plant. The tapping points for individual towers are available and the same shall be connected before completion of Project. "
"The drainage system has been laid and completed at Township Level. The drainage water is being collected in lakes of Golf Courses. The tapping points for individual towers are available and the same shall be connected before completion of Project. "
"Parks / Play fields are planned at Township Level and are not applicable at tower levels. "
"Tree planting as per approved landscape plan at township level is complete. The tree planting at tower levels for Kalypso Court is complete. "
"The electric supply from Grid Sub Station as planned for Wish Town is complete. The tapping points for towers are available and the same are being connected as and when required before completion of project. "
Not Applicable
"The sewage will be treated at Sewerage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping. "
"The solid waste collected from door to door apartments will be transferred to segregation centres planned / constructed at Sewerage Treatment Plant at Township level. The segregated waste is being transported through facility management maintenance company to the identified sites of Noida Authority for necessary disposal."
Treated water from Sewerage Treatment Plant is being used for irrigation and flushing.
As per approved environment impact assessment authority advice
The Fire Station with all the infrastructure facilities and staff has been provided at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department.
At township level, 500 hundred Bed Super Speciality Hospital, Jaypee Institute of Information & Technology, Jaypee Public School, Temples, Convenient Shopping facilities, Club facilities etc. have already been provided
Fire Escape Staircases are provided in tower and basements as per Norms laid down in respective fire approval of the fire department.
At Township Level Sewerage Treatment Plant & Service Centres, Electric Sub station with DG Power Backup, Fire Station, Parks & Playgrounds have been provided.
Showing 8 blocks with 593 units
Total Carpet Area
95941.05 m²
1032699.87 ft²
Total Units
571
5 different types
Blocks & Floors
8
27 floors across all blocks
Parking
1001
1001 garages, 0 open
Total Area
36051.00 m²
388049.36 ft²