Launch Date
Completion Date
RERA ID
28.500895
77.409688
NOT APPLICABLE. DEVELOPMENT OF IT\ITES PARK
BRICKWALL WITH STONE CLADDING AN DMS RALLING
FIRE TENDER ROAD IN RCC
1 - 3 METERS WIDE FOOTPATH
WATER SOURCE IS NOIDA AUTHORITY. WTP AND STP WATER IS USED FOR FLUSHING AND IRRIGATION
YES, 300 KLD - STP SYSTEM
STORM WATER DRAINS DIVERTING TO RAIN HARVESTING PITS
GREEN AREA PROVIDED 8700 SQM (35% OF PLOT AREA)
250 NUMBERS PROVIDED
33 KV GRID SUPPLY STEP DOWN TO 415V IN THREE PHASES
N.A.
SEWAGE TREATED THROUGH STP (300KLD) AND WATER USED FOR FLUSHING AND IRRIGATION. WASTE SEWAGE IS COLLECTED IN SLUDGE TANK AND AFTER DECOMPOSITION USED AS MANURE
SOLID WASTES ARE HANDED OVER TO AUTHORISED WASTE COLLECTION AGENCY ENLISTED WITH CPCB
RAIN WATER HARVESTING PITS. STP WATER USED FOR FLUSHING AND IRRIGATION
ALL HIGH SIDE EQUIPMENTS (CHILLERS, PUMPS, MOTORS DGs, AHUs) ARE VERY ENERGY EFFICIENT AS PER GOLD LEED NORMS. HEAT RECOVERY WHEEL FOR ENERGY SAVING. ALL SERVICES CONTROLLED THROUGH BMS
TWO LAYER OF FIRE SPRINKLER SYSTEM ON EACH FLOOR. TWO LAYER OF SMOKE DETECTION SYSTEM. PA SYSTEM AND FIRE HYDRANT SYSTEM. FHC FULLY LOADED WITH ACCESSORIES. SUFFICIENT FIRE EXTINGUISHERS. 2HRS RATED FIRE DOORS
CAFETERIA AND COMMON WASHROOMS
FIRE EXIT DIRECTION SIGNAGE AND BUILDING EVACUATION PLAN PLACED ON ALL FLOORS. FIRE ANNUNCIATION WITH PROPER MCP SYSTEM. REFUSE AREA AS PER FIRE NORMS. LIFT LOBBY AND STAIR CASE PRESSURISED WITH FRESH AIR SYSTEM.
N.A.
Showing 3 blocks with 37 units
Total Carpet Area
54426.67 m²
585843.23 ft²
Total Units
36
2 different types
Blocks & Floors
3
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
24845.00 m²
267429.10 ft²