Dwarka Expressway

Gurgaon

On the map

Overview

RERA projects
160
+81 not yet checked
Median ₹/sq ft
₹17,500
apartments, ₹10,500–35,000
Past RERA date
17 (11%)
neither ready to move nor cancelled
Since launch
+11%
median change, 50 projects
Due 2026–2028
7,336 homes
in 33 projects, by RERA date
Builders
70
Most active: Signature Global, M3M
Sectors
22
Main road
Dwarka Expressway
Projects by stage
  • 18 new launch
  • 58 under construction
  • 72 ready to move
  • 6 stalled or on hold
  • 2 cancelled

Projects

160 projects checked by our team

Show as slider

Sort byNamePrice₹/sq ftRERA date

  • Under constructionPlots/Floors/Villas

    102 Eden Estate

    COUNTRYWIDE PROMOTERS PRIVATE LIMITED, Sector 102

    RERA date
    30 Apr 2024past its RERA date

    RERA 30 Apr 2024. past its RERA date

  • Ready to movePlots/Floors/Villas

    102 Eden Estate Ii

    COUNTRYWIDE PROMOTERS PRIVATE LIMITED, Sector 102

    RERA date
    Mar 2025registration lapsed

    RERA Mar 2025. registration lapsed

  • Stalled or on holdCommercial

    3X Crossing

    BRISK INFRASTRUCTURES AND DEVELOPERS PVT LTD, Sector 109

    RERA date
    Nov 2026

    RERA Nov 2026

  • Stalled or on holdCommercial

    3xcrossing

    ADDRESS INFRASTRUCTURES PRIVATE LIMITED, Sector 109

    RERA date
    Nov 2026

    RERA Nov 2026

  • Under constructionCommercial

    AARIZE The Tessoro

    Aarize, Sector 114

    RERA date
    Feb 2029

    RERA Feb 2029

  • New launchResidential

    Adani The MarQ

    Adani Realty, Sector 102A

    ₹17,500/sq ftat the area median

    Homes
    3, 4 BHK
    Price
    ₹4.16–5.77 Cr
    RERA date
    Dec 2031
    Size
    2 towers, 368 homes

    3, 4 BHK, RERA Dec 2031

    1.6 km from Dwarka Expressway

  • Stalled or on holdCommercial

    Amb Selfie Square ( Commercial Project)

    VS REALPROJECTS PVT.LTD, Sector 37D

    RERA date
    16 Aug 2022past its RERA date, registration lapsed

    RERA 16 Aug 2022. past its RERA date, registration lapsed

  • Ready to moveResidential

    Ansals Highland Park

    Ansal API Group, Sector 103

    RERA date
    May 2024registration lapsed

    RERA May 2024. registration lapsed

  • New launchResidential
    RERA date
    Mar 2034
    Size
    1 tower, 172 homes

    RERA Mar 2034

    2.0 km from Dwarka Expressway

  • Under constructionResidential

    Assotech Blith

    Assotech, Sector 99

    RERA date
    20 Feb 2025past its RERA date, registration lapsed

    RERA 20 Feb 2025. past its RERA date, registration lapsed

  • Stalled or on holdResidential

    ATS Grandstand Phase 1

    ATS Infrastructure, Sector 99A

    Homes
    3, 4 BHK
    RERA date
    Not recordedregistration lapsed
    Size
    9 towers, 620 homes

    3, 4 BHK. registration lapsed

  • New launchResidential

    ATS Grandstand Phase 2

    ATS Infrastructure, Sector 99A

    ₹13,300/sq ft24% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.83–3.99 Cr
    RERA date
    Mar 2031
    Size
    5 towers, 362 homes

    3, 4 BHK, RERA Mar 2031

    700 m from Dwarka Expressway

  • Under constructionResidential

    ATS Homekraft Sanctuary 105

    ATS Homecraft, Sector 105

    ₹14,000/sq ft20% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.59–3.92 Cr
    RERA date
    Jun 2031
    Size
    11 towers, 472 homes

    3, 4 BHK, RERA Jun 2031

    950 m from Dwarka Expressway

  • Under constructionResidential

    ATS Homekraft Sanctuary 105 Phase 2

    ATS Homecraft, Sector 105

    ₹14,000/sq ft20% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.59–3.92 Cr
    RERA date
    Dec 2031
    Size
    4 towers, 262 homes

    3, 4 BHK, RERA Dec 2031

  • Ready to moveResidential

    Ats Tourmaline

    ATS Infrastructure, Sector 109

    RERA date
    Aug 2023registration lapsed

    RERA Aug 2023. registration lapsed

  • Under constructionResidential

    ₹17,500/sq ftat the area median

    Homes
    2, 3 BHK
    Price
    ₹2.89–4.5 Cr
    RERA date
    Dec 2031
    Size
    5 towers, 885 homes

    2, 3 BHK, RERA Dec 2031

    300 m from Dwarka Expressway

  • Under constructionPlots/Floors/Villas

    BPTP Eden Estate

    BPTP, Sector 103

    RERA date
    Nov 2029

    RERA Nov 2029

  • New launchResidential

    ₹18,000/sq ft3% above the area

    Homes
    3 BHK
    Price
    ₹3.75–3.79 Cr
    RERA date
    Jul 2032
    Size
    3 towers, 531 homes

    3 BHK, RERA Jul 2032

    250 m from Dwarka Expressway

  • Ready to moveResidential

    BPTP Park Terra

    BPTP LTD., Sector 37D

    ₹12,500/sq ft29% below the area

    RERA date
    Apr 2024

    RERA Apr 2024

  • Capital Gateway

    KNS INFRACON PVT.LTD, Sector 111

    RERA date
    30 Jun 2025past its RERA date

    RERA 30 Jun 2025. past its RERA date

  • New launchResidential

    ₹30,000/sq ft71% above the area

    Homes
    1 BHK, Studios
    Price
    ₹3.08–4.93 Cr
    RERA date
    Aug 2032
    Size
    1 tower, 165 homes

    1 BHK, Studios, RERA Aug 2032

    100 m from Dwarka Expressway

  • New launchResidential

    ₹28,000/sq ft60% above the area

    Homes
    3, 4 BHK
    Price
    ₹11.99–15.57 Cr
    RERA date
    Nov 2032
    Size
    3 towers, 216 homes

    3, 4 BHK, RERA Nov 2032

    100 m from Dwarka Expressway

  • New launchResidential

    ₹30,000/sq ft71% above the area

    Homes
    1 BHK, Studios
    Price
    ₹3.08–4.93 Cr
    RERA date
    Aug 2032
    Size
    1 tower, 319 homes

    1 BHK, Studios, RERA Aug 2032

    100 m from Dwarka Expressway

  • Ready to moveResidential

    Centrum Park (Ph-Ii)

    SELENE CONSTRUCTION LTD, Sector 103

    RERA date
    Oct 2018

    RERA Oct 2018

  • Stalled or on holdResidential

    CHD 106 Golf Avenue

    EMPIRE REALTECH PVT. LTD., Sector 106

    RERA date
    30 Jun 2021past its RERA date, registration lapsed

    RERA 30 Jun 2021. past its RERA date, registration lapsed

  • Ready to moveResidential

    CHD 114 Avenue

    VSR Infratech, Sector 114

    RERA date
    Dec 2020

    RERA Dec 2020

  • Ready to moveResidential

    Conscient Habitat

    PRIME INFRASTRUCTURE PVT. LTD, Sector 99A

    RERA date
    Jan 2021

    RERA Jan 2021

  • Ready to moveResidential

    Conscient Habitat 102

    HABITAT TOWNSHIP PVT. LTD, Sector 102

    RERA date
    Jul 2026

    RERA Jul 2026

  • Ready to moveResidential

    Conscient Habitat Prime

    PRIME INFRADEVELOPERS PVT LTD, Sector 99A

    RERA date
    Nov 2025

    RERA Nov 2025

  • Conscient Heritage Max

    DREAMHOME INFRASTRUCTURE PVT. LTD., Sector 102

    RERA date
    31 Dec 2020past its RERA date

    RERA 31 Dec 2020. past its RERA date

  • Ready to moveCommercial

    Conscient One

    Conscient, Sector 109

    RERA date
    Apr 2021
    Size
    1 tower

    RERA Apr 2021

    150 m from Dwarka Expressway

  • Under constructionResidential

    Cosmos Express99 / Cascade Garden

    COSMOS INFRA ENGINEERING INDIA PVT LTD, Sector 99

    RERA date
    31 Mar 2025past its RERA date, registration lapsed

    RERA 31 Mar 2025. past its RERA date, registration lapsed

  • Under constructionResidential

    Diplomats Golf Link

    Diplomats, Sector 110

    RERA date
    4 Sep 2024past its RERA date, registration lapsed

    RERA 4 Sep 2024. past its RERA date, registration lapsed

  • Under constructionResidential

    Elan The Presidential

    ELAN, Sector 106

    ₹18,500/sq ft6% above the area

    Homes
    3 BHK, 4 BHK, 5 BHK, Penthouse Duplex
    Price
    ₹4.53–13.62 Cr
    RERA date
    Oct 2027
    Size
    8 towers, 866 homes

    3 BHK, 4 BHK, 5 BHK, Penthouse Duplex, RERA Oct 2027

    500 m from Dwarka Expressway

  • Under constructionResidential

    Elan The Emperor

    ELAN, Sector 106

    ₹27,500/sq ft57% above the area

    Homes
    4, 5 BHK
    Price
    ₹11.61–16.2 Cr
    RERA date
    Sep 2032
    Size
    5 towers, 580 homes

    4, 5 BHK, RERA Sep 2032

    450 m from Dwarka Expressway

  • Under constructionCommercial

    Elan The Mark

    ELAN, Sector 106

    RERA date
    Jan 2028

    RERA Jan 2028

    200 m from Dwarka Expressway

  • Ready to moveResidential

    Emaar Gurgaon Greens

    EMAAR MGF LAND LTD., Sector 102

    RERA date
    Dec 2019

    RERA Dec 2019

  • Under constructionResidential

    Emaar The 88

    Emaar, Sector 112

    ₹15,000/sq ft14% below the area

    Homes
    2, 3 BHK
    Price
    ₹1.99–2.7 Cr
    RERA date
    Mar 2029
    Size
    2 towers, 88 homes

    2, 3 BHK, RERA Mar 2029

    550 m from Dwarka Expressway

  • Under constructionResidential

    Emaar Urban Ascent

    Emaar, Sector 112

    ₹18,000/sq ft3% above the area

    Homes
    3, 4 BHK
    Price
    ₹3.9–5.67 Cr
    RERA date
    Nov 2031
    Size
    6 towers, 816 homes

    3, 4 BHK, RERA Nov 2031

    400 m from Dwarka Expressway

  • Under constructionResidential

    Emperium Premio

    EMPERIUM INFRASTRUCTURE PRIVATE LIMITED, Sector 37C

    ₹12,000/sq ft31% below the area

    Homes
    2 BHK, 3 BHK, 4 BHK, Penthouse Duplex
    Price
    ₹1.57–4.33 Cr
    RERA date
    Mar 2030
    Size
    1 tower, 216 homes

    2 BHK, 3 BHK, 4 BHK, Penthouse Duplex, RERA Mar 2030

  • Under constructionResidential

    Experion Windchants Nova

    Experion, Sector 108

    ₹21,000/sq ft20% above the area

    Homes
    4 BHK
    Price
    ₹9.13 Cr
    RERA date
    Mar 2030
    Size
    1 tower, 60 homes

    4 BHK, RERA Mar 2030

    550 m from Dwarka Expressway

  • Ready to moveResidential

    Godrej Meridien Phase 1

    Godrej, Sector 106

    ₹16,500/sq ft6% below the area

    Homes
    2, 3, 4 BHK
    Price
    ₹2.25–4.54 Cr
    RERA date
    Mar 2025
    Size
    7 towers, 754 homes

    2, 3, 4 BHK, RERA Mar 2025

  • Ready to moveResidential

    Godrej Meridien Phase 2

    Godrej, Sector 106

    ₹16,500/sq ft6% below the area

    Homes
    2, 3, 4 BHK
    Price
    ₹2.25–4.54 Cr
    RERA date
    Mar 2025registration lapsed
    Size
    7 towers, 754 homes

    2, 3, 4 BHK, RERA Mar 2025. registration lapsed

  • Ready to moveResidential

    ₹16,500/sq ft6% below the area

    Homes
    2, 3, 4 BHK
    Price
    ₹2.25–4.54 Cr
    RERA date
    Sep 2025
    Size
    7 towers, 754 homes

    2, 3, 4 BHK, RERA Sep 2025

  • Under constructionResidential

    Godrej Vrikshya

    Godrej, Sector 103

    ₹19,000/sq ft9% above the area

    Homes
    3, 4 BHK
    Price
    ₹3.7–7.17 Cr
    RERA date
    Jun 2031
    Size
    6 towers, 615 homes

    3, 4 BHK, RERA Jun 2031

    1.8 km from Dwarka Expressway

  • Ready to moveResidential

    Group Housing Colony

    SIGNATURE GLOBAL (INDIA) PVT.LTD

    RERA date
    Jan 2023

    RERA Jan 2023

  • CancelledResidential
    RERA date
    Apr 2022registration lapsed

    RERA Apr 2022. registration lapsed

  • Under constructionResidential

    HCBS Auroville

    HCBS, Sector 103

    RERA date
    31 Aug 2025past its RERA date

    RERA 31 Aug 2025. past its RERA date

  • Under constructionResidential

    HCBS Twin Horizon

    HCBS, Sector 102

    ₹17,250/sq ft1% below the area

    Homes
    3, 4 BHK
    Price
    ₹4.7–6.55 Cr
    RERA date
    Oct 2028
    Size
    2 towers, 268 homes

    3, 4 BHK, RERA Oct 2028

  • Under constructionMixed-Use

    ₹18,250/sq ft

    Homes
    4 BHK
    Price
    ₹6.31 Cr
    RERA date
    Jun 2030
    Size
    2 towers, 254 homes

    4 BHK, RERA Jun 2030

    150 m from Dwarka Expressway

  • Under constructionResidential

    Hero The Palatial Tower D

    Hero Homes, Sector 104

    ₹18,250/sq ft4% above the area

    Homes
    3 BHK
    Price
    ₹5.17 Cr
    RERA date
    Jun 2030
    Size
    1 tower, 174 homes

    3 BHK, RERA Jun 2030

    150 m from Dwarka Expressway

  • Under constructionResidential

    Hero The Palatial Tower E

    Hero Homes, Sector 104

    ₹18,250/sq ft4% above the area

    Homes
    3 BHK
    Price
    ₹5.17 Cr
    RERA date
    Jun 2030
    Size
    1 tower, 170 homes

    3 BHK, RERA Jun 2030

    150 m from Dwarka Expressway

  • Ready to moveResidential

    Imperia Aashiyara

    RENUKA TRADERS PVT LTD, Sector 37C

    RERA date
    Jul 2025

    RERA Jul 2025

  • Ready to moveResidential

    Indiabulls Enigma

    ATHENA INFRASTRUCTURE LTD., Sector 110

    RERA date
    Aug 2018

    RERA Aug 2018

  • Ready to moveResidential

    Indiabulls Enigma 1A

    ATHENA INFRASTRUCTURES LTD., Sector 110

    RERA date
    Mar 2018

    RERA Mar 2018

  • Ready to moveResidential

    Indiabulls Enigma P1

    ATHENA INFRASTRUCTURE LTD., Sector 110

    RERA date
    Sep 2018registration lapsed

    RERA Sep 2018. registration lapsed

  • Under constructionResidential

    Indiabulls Estate & Club - I

    Indiabulls, Sector 104

    ₹17,000/sq ft3% below the area

    Homes
    3, 4 BHK
    Price
    ₹4.19–6.39 Cr
    RERA date
    Oct 2029
    Size
    3 towers, 387 homes

    3, 4 BHK, RERA Oct 2029

    400 m from Dwarka Expressway

  • Ready to moveCommercial

    JMS Marine Square

    JMS BUILDTECH PVT. LTD, Sector 102

    RERA date
    Jun 2026

    RERA Jun 2026

  • Under constructionResidential

    Kirsumi Waterfall Suites 1

    Krisumi Corporation

    RERA date
    Dec 2028
    Size
    1 tower

    RERA Dec 2028

    200 m from Dwarka Expressway

  • Under constructionResidential

    Krisumi Waterfall Suites 2

    Krisumi Corporation, Sector 36A

    ₹22,000/sq ft26% above the area

    Homes
    1, 4 BHK
    Price
    ₹2.07–22.7 Cr
    RERA date
    Dec 2029
    Size
    1 tower, 439 homes

    1, 4 BHK, RERA Dec 2029

    150 m from Dwarka Expressway

  • Under constructionResidential

    Krisumi Waterside Residences

    Krisumi Corporation, Sector 36A

    ₹23,000/sq ft31% above the area

    Homes
    2 BHK, 3 BHK, Penthouse Duplex
    Price
    ₹4–16.4 Cr
    RERA date
    Oct 2029
    Size
    3 towers, 612 homes

    2 BHK, 3 BHK, Penthouse Duplex, RERA Oct 2029

    200 m from Dwarka Expressway

  • New launchResidential

    Krisumi Waterside Residences The Forest Reserve Phase 1

    KRISUMI CORPORATION PVT. LTD., Sector 36A

    ₹23,000/sq ft31% above the area

    Homes
    3 BHK, 4 BHK, Penthouse Duplex, Penthouse Triplex
    Price
    ₹6.29–17.42 Cr
    RERA date
    Jun 2031
    Size
    2 towers, 298 homes

    3 BHK, 4 BHK, Penthouse Duplex, Penthouse Triplex, RERA Jun 2031

    400 m from Dwarka Expressway

  • New launchResidential

    Krisumi Waterside Residences The Forrest Reserve-II

    KRISUMI CORPORATION PVT. LTD., Sector 36A

    ₹23,000/sq ft31% above the area

    Homes
    3 BHK, 4 BHK, Penthouse Duplex, Penthouse Triplex
    Price
    ₹6.29–17.42 Cr
    RERA date
    Jun 2031
    Size
    3 towers, 542 homes

    3 BHK, 4 BHK, Penthouse Duplex, Penthouse Triplex, RERA Jun 2031

    300 m from Dwarka Expressway

  • New launchResidential

    Landmark Skyvue

    Landmark Group, Sector 103

    ₹17,000/sq ft3% below the area

    RERA date
    Mar 2031
    Size
    2 towers, 240 homes

    RERA Mar 2031

  • Ready to moveCommercial
    RERA date
    Aug 2024

    RERA Aug 2024

  • Under constructionResidential

    M3M Capital Phase 1

    M3M, Sector 113

    ₹17,000/sq ft3% below the area

    Homes
    2, 3 BHK
    Price
    ₹2.21–2.83 Cr
    RERA date
    30 Jun 2026past its RERA date
    Size
    5 towers, 644 homes

    2, 3 BHK, RERA 30 Jun 2026. past its RERA date

  • Under constructionResidential

    M3M Capital Phase 2

    M3M, Sector 113

    ₹17,000/sq ft3% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.81–3.91 Cr
    RERA date
    Dec 2026
    Size
    7 towers, 1,760 homes

    3, 4 BHK, RERA Dec 2026

  • Under constructionResidential

    M3M Capital Phase 3

    M3M, Sector 113

    ₹17,000/sq ft3% below the area

    Homes
    4 BHK
    Price
    ₹3.5–3.91 Cr
    RERA date
    Feb 2028
    Size
    2 towers, 268 homes

    4 BHK, RERA Feb 2028

  • New launchCommercial

    ₹25,000/sq ft

    RERA date
    Jun 2033
    Size
    1 tower, 165 homes

    RERA Jun 2033

    150 m from Dwarka Expressway

  • Under constructionResidential

    M3m Crown Phase 1

    M3M, Sector 111

    ₹17,000/sq ft3% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.73–4.54 Cr
    RERA date
    Jan 2028
    Size
    11 towers, 1,332 homes

    3, 4 BHK, RERA Jan 2028

    350 m from Dwarka Expressway

  • New launchResidential

    M3m Elie Saab At Scda

    M3M, Sector 111

    ₹35,000/sq ft100% above the area

    Homes
    4 BHK
    Price
    ₹14.72–16.29 Cr
    RERA date
    Feb 2032
    Size
    3 towers, 336 homes

    4 BHK, RERA Feb 2032

    300 m from Dwarka Expressway

  • Under constructionResidential

    M3M Mansion

    M3M, Sector 113

    ₹21,000/sq ft20% above the area

    Homes
    3, 4, 5 BHK
    Price
    ₹4.36–14.21 Cr
    RERA date
    Mar 2030
    Size
    8 towers, 968 homes

    3, 4, 5 BHK, RERA Mar 2030

    200 m from Dwarka Expressway

  • Under constructionResidential

    M3M St Andrews at SCDA

    M3M, Sector 113

    ₹22,000/sq ft26% above the area

    Homes
    3, 4 BHK
    Price
    ₹4.58–7.51 Cr
    RERA date
    Feb 2031
    Size
    8 towers, 244 homes

    3, 4 BHK, RERA Feb 2031

    200 m from Dwarka Expressway

  • Ready to moveCommercial

    M3m Xpressway 114

    GENEROUS REALTORS PRIVATE LIMITED

    RERA date
    Apr 2025registration lapsed

    RERA Apr 2025. registration lapsed

  • Under constructionResidential

    Max Estate 360

    Max Estates, Sector 36A

    ₹21,000/sq ft20% above the area

    Homes
    2, 3, 4 BHK
    Price
    ₹4.53–7.42 Cr
    RERA date
    Aug 2030
    Size
    6 towers, 864 homes

    2, 3, 4 BHK, RERA Aug 2030

    250 m from Dwarka Expressway

  • Under constructionResidential

    Max Estate 361 (Antara 361)

    Max Estates, Sector 36A

    ₹22,350/sq ft28% above the area

    Homes
    1 BHK, 2 BHK, 3 BHK, 4 BHK, Penthouse Duplex
    Price
    ₹2.56–16.84 Cr
    RERA date
    Sep 2033
    Size
    5 towers, 1,096 homes

    1 BHK, 2 BHK, 3 BHK, 4 BHK, Penthouse Duplex, RERA Sep 2033

    400 m from Dwarka Expressway

  • Under constructionMixed-Use

    MVN Aero One

    MVN, Sector 37D

    ₹25,000/sq ft

    Homes
    5 BHK
    Price
    ₹15.75 Cr
    RERA date
    Dec 2029
    Size
    1 tower, 60 homes

    5 BHK, RERA Dec 2029

    200 m from Dwarka Expressway

  • Ready to moveCommercial

    Nimai Place

    Y B BUILDERS PVT LTD

    RERA date
    Mar 2023

    RERA Mar 2023

  • Ready to moveResidential

    Ninex RMG Residency

    RMG DEVELOPERS PVT. LTD

    RERA date
    Dec 2019registration lapsed

    RERA Dec 2019. registration lapsed

  • Under constructionResidential

    Oxirich Chintamanis

    Chintamanis, Sector 103

    ₹12,500/sq ft29% below the area

    RERA date
    Nov 2026
    Size
    5 towers, 312 homes

    RERA Nov 2026

  • Ready to moveCommercial

    Paras Arcade 114

    CORDIAL INFRASTRUCTURE PVT. LTD

    RERA date
    Jan 2028

    RERA Jan 2028

  • Ready to moveResidential

    Paras Dews

    SEPSET PROPERTIES PVT.LTD., Sector 106

    RERA date
    Jan 2023

    RERA Jan 2023

  • Under constructionResidential

    Pareena Coban Residences

    Pareena, Sector 99A

    ₹10,500/sq ft40% below the area

    Homes
    2, 3 BHK
    Price
    ₹1.63–2.1 Cr
    RERA date
    Mar 2029
    Size
    7 towers, 544 homes

    2, 3 BHK, RERA Mar 2029

  • Ready to moveResidential

    Pareena OM Apartments

    PAREENA BUILDERS & PROMOTERS PVT. LTD.

    RERA date
    Mar 2024registration lapsed

    RERA Mar 2024. registration lapsed

  • Ready to moveCommercial

    Plaza at 106 II

    MAGIC EYE DEVELOPERS PRIVATE LIMITED, Sector 106

    RERA date
    Dec 2024registration lapsed

    RERA Dec 2024. registration lapsed

  • New launchCommercial

    Puri Aerosphere

    Puri Construction, Sector 111

    ₹18,500/sq ft

    RERA date
    Jun 2033
    Size
    1 tower, 417 homes

    RERA Jun 2033

    150 m from Dwarka Expressway

  • Under constructionResidential

    Puri Diplomatic Residences

    Puri Construction, Sector 111

    ₹21,000/sq ft20% above the area

    Homes
    3, 4 BHK
    Price
    ₹4.79–7.3 Cr
    RERA date
    Mar 2032
    Size
    6 towers, 692 homes

    3, 4 BHK, RERA Mar 2032

    450 m from Dwarka Expressway

  • Ready to moveResidential

    Puri Emerald Bay

    PURI CONSTRUCTIONS LTD., Sector 104

    RERA date
    Feb 2020
    Size
    3 towers

    RERA Feb 2020

    200 m from Dwarka Expressway

  • Stalled or on holdResidential

    Raheja Amaltaas Tower B

    RAHEJA DEVELOPERS LTD., Sector 99A

    RERA date
    5 Jul 2022past its RERA date, registration lapsed

    RERA 5 Jul 2022. past its RERA date, registration lapsed

  • Raheja Vanya Tower D

    RAHEJA DEVELOPERS LTD., Sector 99A

    RERA date
    Not recordedregistration lapsed

    registration lapsed

  • New launchResidential

    ₹17,500/sq ftat the area median

    Homes
    2, 3, 4 BHK
    Price
    ₹3.59–5.62 Cr
    RERA date
    Jun 2033
    Size
    2 towers, 344 homes

    2, 3, 4 BHK, RERA Jun 2033

    1.7 km from Dwarka Expressway

  • Ready to moveResidential

    ROF Aalayas

    NANI RESORTS & FLORICULTURE PVT. LTD., Sector 102

    RERA date
    Not recordedregistration lapsed

    registration lapsed

  • New launchResidential

    Satya Levante Residences

    Satya Group, Sector 104

    ₹14,250/sq ft19% below the area

    Homes
    3, 4, 5 BHK
    Price
    ₹3.11–4.93 Cr
    RERA date
    Mar 2032
    Size
    3 towers, 488 homes

    3, 4, 5 BHK, RERA Mar 2032

  • Ready to moveCommercial

    Satya The Hive

    Satya Group, Sector 102

    RERA date
    Nov 2024

    RERA Nov 2024

  • Ready to movePlots/Floors/Villas

    Shapoorji Joyville Phase 1

    Shapoorji Pallonji

    RERA date
    Mar 2023registration lapsed

    RERA Mar 2023. registration lapsed

    750 m from Dwarka Expressway

  • Ready to moveResidential

    Shapoorji Joyville Phase 2

    Shapoorji Pallonji

    RERA date
    Sep 2023registration lapsed

    RERA Sep 2023. registration lapsed

    750 m from Dwarka Expressway

  • Ready to moveResidential

    Shapoorji Joyville Phase 3

    Shapoorji Pallonji

    RERA date
    Apr 2024registration lapsed

    RERA Apr 2024. registration lapsed

    750 m from Dwarka Expressway

  • Ready to moveResidential

    Shapoorji Joyville Phase 4

    Shapoorji Pallonji

    RERA date
    Dec 2024registration lapsed

    RERA Dec 2024. registration lapsed

    750 m from Dwarka Expressway

  • Ready to moveResidential

    Shapoorji Joyville Phase 5

    Shapoorji Pallonji

    RERA date
    Dec 2024registration lapsed

    RERA Dec 2024. registration lapsed

    750 m from Dwarka Expressway

  • Ready to movePlots/Floors/Villas
    RERA date
    Feb 2025registration lapsed

    RERA Feb 2025. registration lapsed

  • Under constructionPlots/Floors/Villas

    Signature Global City 37d-(2)

    SIGNATUREGLOBAL DEVELOPERS PVT. LTD.

    RERA date
    28 Feb 2026past its RERA date

    RERA 28 Feb 2026. past its RERA date

  • Under constructionResidential

    Signature Global DELUXE DXP

    Signature Global, Sector 37D

    ₹14,500/sq ft17% below the area

    Homes
    3, 4 BHK
    Price
    ₹3.58–4.72 Cr
    RERA date
    Mar 2031
    Size
    8 towers, 900 homes

    3, 4 BHK, RERA Mar 2031

    700 m from Dwarka Expressway

  • New launchResidential

    Signature Global Sarvam at DXP Estate

    Signature Global, Sector 37D

    ₹15,700/sq ft10% below the area

    Homes
    3, 4 BHK
    Price
    ₹2.85–3.92 Cr
    RERA date
    Dec 2032
    Size
    11 towers, 1,798 homes

    3, 4 BHK, RERA Dec 2032

    350 m from Dwarka Expressway

  • Under constructionCommercial
    RERA date
    29 Mar 2025past its RERA date

    RERA 29 Mar 2025. past its RERA date

  • Under constructionCommercial

    Signature Global Sco 88a

    Signature Global

    RERA date
    29 Jul 2025past its RERA date

    RERA 29 Jul 2025. past its RERA date

  • Under constructionResidential

    Signature Global Solera

    SIGNATURE BUILDERS PVT. LTD

    RERA date
    31 May 2021past its RERA date

    RERA 31 May 2021. past its RERA date

  • Ready to movePlots/Floors/Villas
    RERA date
    Feb 2025registration lapsed

    RERA Feb 2025. registration lapsed

  • Under constructionResidential

    Smartworld One DXP

    Smartworld, Sector 113

    ₹16,000/sq ft9% below the area

    Homes
    2, 3, 4 BHK
    Price
    ₹2.89–3.09 Cr
    RERA date
    Dec 2027
    Size
    8 towers, 900 homes

    2, 3, 4 BHK, RERA Dec 2027

    300 m from Dwarka Expressway

  • Under constructionResidential

    Smartworld One DXP Phase 2

    Smartworld, Sector 113

    ₹17,500/sq ftat the area median

    Homes
    2, 3, 4 BHK
    Price
    ₹2.57–5.28 Cr
    RERA date
    Aug 2031
    Size
    8 towers, 890 homes

    2, 3, 4 BHK, RERA Aug 2031

    300 m from Dwarka Expressway

  • Under constructionMixed-Use

    Sobha Altus

    SOBHA, Sector 106

    ₹23,000/sq ft

    Homes
    3, 4, 5 BHK
    Price
    ₹6.6–8.86 Cr
    RERA date
    Dec 2031
    Size
    3 towers, 293 homes

    3, 4, 5 BHK, RERA Dec 2031

    550 m from Dwarka Expressway

  • Ready to moveResidential
    RERA date
    Oct 2022registration lapsed

    RERA Oct 2022. registration lapsed

    2.0 km from Dwarka Expressway

  • Ready to moveResidential

    ₹20,000/sq ft14% above the area

    Homes
    2, 3 BHK
    Price
    ₹2.76–4.69 Cr
    RERA date
    Oct 2021

    2, 3 BHK, RERA Oct 2021

    2.0 km from Dwarka Expressway

  • Ready to moveResidential
    RERA date
    Oct 2023

    RERA Oct 2023

    2.0 km from Dwarka Expressway

  • Under constructionResidential
    RERA date
    31 Dec 2024past its RERA date

    RERA 31 Dec 2024. past its RERA date

    2.0 km from Dwarka Expressway

  • Under constructionResidential

    ₹22,000/sq ft26% above the area

    Homes
    3, 4 BHK
    Price
    ₹4.69–5.41 Cr
    RERA date
    Dec 2028
    Size
    6 towers, 396 homes

    3, 4 BHK, RERA Dec 2028

    2.0 km from Dwarka Expressway

  • Ready to moveResidential
    Homes
    2, 3 BHK
    RERA date
    May 2022

    2, 3 BHK, RERA May 2022

    2.0 km from Dwarka Expressway

  • Under constructionResidential
    RERA date
    Dec 2026

    RERA Dec 2026

    2.0 km from Dwarka Expressway

  • Under constructionCommercial

    Sobha Strada

    SOBHA, Sector 106

    ₹26,000/sq ft

    Homes
    1 BHK
    Price
    ₹2.23–2.67 Cr
    RERA date
    Dec 2032
    Size
    1 tower, 251 homes

    1 BHK, RERA Dec 2032

    950 m from Dwarka Expressway

  • Ready to moveResidential

    Tata Gurgaon Gateway

    TATA Realty and Infrastructure Ltd

    RERA date
    Jun 2020

    RERA Jun 2020

  • Ready to moveResidential

    Tata La Vida

    SECTOR -113,GATEVIDA DEVELOPERS PVT.LTD., Sector 113

    ₹17,000/sq ft3% below the area

    RERA date
    Dec 2022

    RERA Dec 2022

  • Ready to moveResidential

    Tata La Vida Phase 2

    SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LTD, Sector 113

    ₹17,000/sq ft3% below the area

    RERA date
    Aug 2027

    RERA Aug 2027

  • New launchMixed-Use

    The Grove At Sanctuary

    1000 TREES HOUSING PRIVATE LIMITED, Sector 105

    ₹15,000/sq ft

    RERA date
    Oct 2028
    Size
    1 tower

    RERA Oct 2028

    900 m from Dwarka Expressway

  • Ready to movePlots/Floors/Villas
    RERA date
    Oct 2022registration lapsed

    RERA Oct 2022. registration lapsed

  • Ready to moveResidential

    Waterfall Residence

    Krisumi Corporation, Sector 36A

    ₹20,000/sq ft14% above the area

    Homes
    2, 3, 4, 5 BHK
    Price
    ₹2.9–12.71 Cr
    RERA date
    Dec 2024
    Size
    3 towers, 433 homes

    2, 3, 4, 5 BHK, RERA Dec 2024

    100 m from Dwarka Expressway

  • Under constructionResidential

    Whiteland Westin Residences

    Whiteland Corporation, Sector 103

    ₹26,000/sq ft49% above the area

    Homes
    3, 4 BHK
    Price
    ₹6.95–11.25 Cr
    RERA date
    Sep 2031
    Size
    5 towers, 848 homes

    3, 4 BHK, RERA Sep 2031

    400 m from Dwarka Expressway

  • Under constructionResidential

    Whiteland Westin Residences Phase 2

    Whiteland Corporation, Sector 103

    ₹26,000/sq ft49% above the area

    RERA date
    Sep 2031
    Size
    2 towers, 264 homes

    RERA Sep 2031

    400 m from Dwarka Expressway

  • Under constructionResidential

    Whiteland Westin Residences Phase 4

    Whiteland Corporation, Sector 103

    ₹26,000/sq ft49% above the area

    Homes
    3, 4 BHK
    Price
    ₹6.95–11.25 Cr
    RERA date
    Dec 2032
    Size
    4 towers, 352 homes

    3, 4 BHK, RERA Dec 2032

    400 m from Dwarka Expressway

  • Under constructionResidential

    Yashika Green Square

    DISHITA INFRA PVT. LTD., Sector 99A

    RERA date
    Jan 2028
    Size
    590 homes

    RERA Jan 2028

  • Ready to moveResidential

    Zara Rossa

    DELURIS BUILDTECH INDIA PVT LTS, Sector 112

    RERA date
    Jun 2024

    RERA Jun 2024

81 more RERA projects here, not yet checked by our teamFound by their RERA address or map point. Not counted in the numbers on this page.
  • 3x Crossing Square
    ADDRESS INFRASTRUCTURES PVT. LTD., SECTOR 109, VILLAGE CHAUMA, GURUGRAM
    RERA completion 31 Oct 2029; address names Sector 109
  • Ats Triumph Villas
    ATS Infrastructure, VILLAGE - DHANWAPUR, SECTOR -104, GURUGRAM
    RERA completion 15 Dec 2028; address names Sector 104
  • Commercial Colony
    EMINENCE TOWNSHIPS INDIA PVT. LTD, SECTOR 112, SECTOR ROAD, BAJGHERA, GURUGRAM
    RERA completion 31 Dec 2020; address names Sector 112
  • Courtyard 37d
    Royal Green, REVENUE ESTATE OF VILL- HARSARU, SECTOR - 37D, GURURGAM
    RERA completion 29 Feb 2028; address names Sector 37D
  • Engracia
    JUBILIANT MALLS PVT. LTD, SECTOR- 37D, VILLAGE BASAI, GURUGRAM
    RERA completion 31 Aug 2019; registration lapsed; address names Sector 37D
  • Experion Windchants Phase 3
    Experion, SECTOR 112, CHOMA, GURUGRAM
    RERA completion 20 Aug 2020; address names Sector 112
  • Experion Windchants Phase 4 (Nursery School Site)
    Experion, VILLAGE CHOMA,SECTOR-112,GURUGRAM
    RERA completion 30 Aug 2020; registration lapsed; address names Sector 112
  • Godrej Summit
    Godrej, SECTOR 104 GURUGRAM
    RERA completion 30 Sep 2018; address names Sector 104
  • Grand Central 114
    CANDEO PROJECTS PVT. LTD., SECTOR 114, GURUGRAM
    RERA completion 18 Jan 2027; address names Sector 114
  • Grand Iva
    JMK HOLDING PVT.LTD., SECTOR-103, GURUGRAM
    RERA completion 28 Sep 2020; address names Sector 103
  • Green Bhoomi
    BST DEVELOPERS INDIA PVT LTD, SECTOR 99A, VILLAGE GOPALPUR, TEHSIL HARSARU
    RERA completion 25 Jan 2027; address names Sector 99A
  • Group Housing Colony
    ADANI M2K PROJECTS LLP, KHEDKI MAZRA, SECTOR 102/102A, GURUGRAM
    RERA completion 30 Sep 2019; address names Sector 102
  • Group Houstng Project Ln (Solera)
    SIGNATURE BUILDERS. PVT. LTD., SEC-107, GURUGRAM
    RERA completion 5 Jan 2019; address names Sector 107
  • Gulmohar Tower (Tower-A)
    RAHEJA DEVELOPERS LTD, SECTOR- 99A
    RERA completion 31 Dec 2022; registration lapsed; address names Sector 99A
  • Heartsong Phase 6
    Experion, SECTOR 108
    RERA completion 13 May 2020; address names Sector 108
  • Hero Homes
    Hero Homes, SECTOR-104, DHANWAPUR, GURUGRAM
    RERA completion 28 Feb 2027; address names Sector 104
  • Hub 108
    Experion, SECTOR 108, GURUGRAM, HARYANA
    RERA completion 5 May 2024; registration lapsed; address names Sector 108
  • Ild Grand
    ALM INFOTECH CITY PVT.LTD., SECTOR 37 C, TEHSIL AND DISTRICT GURUGRAM, HARYANA
    RERA completion 30 Jun 2023; registration lapsed; address names Sector 37C
  • Ild Grand Centra ( Tower 1)
    ILD, SECTOR- 37C, GURUGRAM
    RERA completion 16 Feb 2020; registration lapsed; address names Sector 37C
  • Ild Greens ( Tower 2,6 And 7)
    ILD, SECTOR- 37C, GURUGRAM
    RERA completion 16 Aug 2018; address names Sector 37C
  • Imperial Garden
    EMAAR MGF LAND LTD, SECTOR-102, KHERKI DAULLA, GURUGRAM
    RERA completion 31 Dec 2019; address names Sector 102
  • Imperial Garden Phase 2
    EMAAR MGF LAND LTD., SECTOR- 102, GURUGRAM
    RERA completion 17 Oct 2018; address names Sector 102
  • Indiabulls One 09, Phase-1
    Indiabulls, SECTOR-109, VILLAGE PAWALA KHUSRUPUR, GURGRAM, HARYANA
    RERA completion 4 May 2023; registration lapsed; address names Sector 109
  • Indiabulls One09
    Indiabulls, SECTOR 109, GURUGRAM
    RERA completion 31 May 2026; address names Sector 109
  • Kavyam-Phase-1
    AGRANTE REALTY LTD, SECTOR-108, DHARAMPUR, GURUGRAM
    RERA completion 30 Nov 2022; registration lapsed; address names Sector 108
  • Laxmi Apartments
    Pareena, VILLAGE GOPAL PUR, SECTOR-99, GURUGRAM
    RERA completion 14 Sep 2020; address names Sector 99
  • Lotus Elise
    Lotus Realtech, VILLAGE DHANKOT, SECTOR-99, GURUGRAM
    RERA completion 30 Sep 2021; address names Sector 99
  • Luxe Residency - 112
    RISHALI DEVELOPERS LLP, REVENUE ESTATE OF VILLAGE BAJGHERA, SECTOR 112, GURUGRAM
    RERA completion 2 Nov 2027; address names Sector 112
  • M2k Olive Green Floors
    SADAN REALTECHPRIVATE LIMITED, M2K OLIVE GREENS, VILLAGE DHANWAPUR,SECTOR - 104
    RERA completion 31 Dec 2029; address names Sector 104
  • M2k Olive Greens
    SADAN REALTECH PRIVATE LIMITED, VILLAGE DHANWAPUR, SECTOR - 104
    RERA completion 20 Oct 2025; address names Sector 104
  • M3m 113 Market
    LEKH BUILDTECH PRIVATE LIMITED, SECTOR-113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA
    RERA completion 30 Apr 2023; address names Sector 113
  • Manor One
    KASHISH DEVELOPERS LIMITED, SEC-111, DWARKA EXPRESSWAY,GURUGRAM-122017
    RERA completion 30 Jun 2027; address names Sector 111
  • Mrg Crown
    MRG Group, VILLAGE BABUPUR, SECTOR 106,
    RERA completion 15 Nov 2027; address names Sector 106
  • Mrg Crown 106
    MRG Group, VILLAGE BABUPUR, SECTOR-106, GURUGRAM
    RERA completion 31 Mar 2027; address names Sector 106
  • Neo Centra
    OCIMUM ESTATES PRIVATE LIMITED, REVENUE ESTATE OF VILLAGE-DAULATABAD, SECTOR-103, TEHSIL AND DISTRICT- GURGAON, HARYANA
    RERA completion 31 Dec 2024; address names Sector 103
  • Neo Square
    NEO DEVELOPERS PVT.LTD., VILLAGE PAWALA KHUSRPUR,SECTOR-109, GURUGRAM
    RERA completion 22 Feb 2025; registration lapsed; address names Sector 109
  • Ocus Medley (Commercial Colony)
    Ocus Group, SECTOR-99, KHERKI MAJRA, GURUGRAM
    RERA completion 17 Sep 2022; address names Sector 99
  • Our Homes
    APEX BUILDWELL PVT. LTD., SECTOR-37C, GURUGRAM
    RERA completion 1 Dec 2019; address names Sector 37C
  • Oyster Arcade
    ADANI M2K PROJECTS LLP, VILLAGE KHERKI MAJRA, SECTOR 102 GURUGRAM
    RERA completion 24 Nov 2025; address names Sector 102
  • Oyster Grande-Tower G
    ADANI M2K PROJECTS LLP, SECTOR 102/102A, VILLAGE KHEDKI MAZRA, GURUGRAM
    RERA completion 30 Sep 2024; registration lapsed; address names Sector 102
  • Oyster Greens
    ADANI M2K PROJECTS LLP, VILLAGE KHERKI MAJRA, SECTOR 102A GURUGRAM
    RERA completion 9 Aug 2026; address names Sector 102A
  • Oyster Greens
    ADANI M2K PROJECTS LLP, VILLAGE KHERKI MAJRA SECTOR 102A GURUGRAM
    RERA completion 9 Aug 2026; address names Sector 102A
  • Palash Tower (Tower-C)
    RAHEJA DEVELOPERS LTD, SECTOR 99A
    RERA completion 31 Dec 2022; registration lapsed; address names Sector 99A
  • Park Street
    BPTP LIMITED, SECTOR- 37D, GURUGRAM
    RERA completion 31 May 2018; address names Sector 37D
  • Phase 1,tower C1,c2,c3 Commercial(Shops), Ews And Community Building
    SATYA TOWNSHIPS PVT. LTD., SECTOR 99A , VILLAGE GOPALPU, GURUGRAM, HARYANA
    RERA completion 13 Dec 2022; registration lapsed; address names Sector 99A
  • Platina Street 109
    ISHV REALTORS PRIVATE LIMITED, SECTOR 109, VILLAGE PAWAL KHUSURPUR, DWARKA EXPRESSWAY, GURGAON
    RERA completion 30 Sep 2027; address names Sector 109
  • Plaza 106 Ddjay
    MAGIC EYE DEVELOPERS PVT LTD, PLAZA 106 DDJAY , SECTOR 106, NEAR DAULTABAD VILLAGE, GURGAON
    RERA completion 31 Dec 2024; registration lapsed; address names Sector 106
  • Plaza 106 Sco
    MAGIC EYE DEVELOPERS PVT LTD, PLAZA 106 SCO, SECTOR 106, NEAR DAULTABAD VILLAGE, GURUGRAM
    RERA completion 31 Dec 2026; address names Sector 106
  • Plaza At 106-I
    MAGIC EYE DEVELOPERS PVT. LTD, SECTOR 106, VILLAGE DAULATABAD, TEHSIL AND DISTRICT GURUGRAM
    RERA completion 31 Dec 2021; address names Sector 106
  • Raheja Shilas Low Rise In Raheja Atharva
    RAHEJA DEVELOPERS LTD, SECTOR 109, GURUGRAM
    RERA completion 27 Aug 2022; registration lapsed; address names Sector 109
  • Reach Buzz 114
    Reach Group, SECTOR 114
    RERA completion 30 Sep 2028; address names Sector 114
  • Riddhi Siddhi
    PIVOTAL INFRASTRUCTURE PVT. LTD., SECTOR-99, VILLAGE KHERKI MAJRA DHANKOT, DIST GURUGRAM
    RERA completion 31 Aug 2020; registration lapsed; address names Sector 99
  • Rof Aalayas Phase Ii
    ROF, SECTOR-102, GURUGRAM
    RERA completion 2 Jul 2023; address names Sector 102
  • Rof Alante
    ROF, VILLAGE- DHARAMPUR, SECTOR- 108
    RERA completion 4 Mar 2024; address names Sector 108
  • Signature Global City 37d
    SIGNATUREGLOBAL DEVELOPERS PVT. LTD., VILLAGE GADULI KALAN, SECTOR-37D, GURUGRAM
    RERA completion 28 Apr 2025; registration lapsed; address names Sector 37D
  • Signature Global City 37d - 1
    SIGNATUREGLOBAL DEVELOPERS PVT LTD, VILLAGE GADULI KALAN, SECTOR-37D, GURUGRAM
    RERA completion 28 Sep 2025; address names Sector 37D
  • Sovereign Park
    VATIKA SOVEREIGN PARK PVT. LTD., SECTOR 99, GURUGRAM
    RERA completion 31 Mar 2025; registration lapsed; address names Sector 99
  • Sovereign Park (Phase-Ii)
    VATIKA SOVEREIGN PARK PVT. LTD, SECTOR-99, VILLAGE-KHERKI MAJRA DHANKOT
    RERA completion 10 Jul 2027; address names Sector 99
  • Spiti Greenwood Estate
    SPITI TOWNSHIP LLP, SECTOR 99A, GURGAON
    RERA completion 23 Aug 2028; address names Sector 99A
  • Spiti Homes
    SPITI TOWNSHIP LLP, SECTOR 99A, GURGAON
    RERA completion 28 Jul 2028; address names Sector 99A
  • Tatva Estates
    ALTON BUILDTECH INDIA PVT LTD, SECTOR 99A, GURGAON
    RERA completion 4 Dec 2027; address names Sector 99A
  • The Antalyas
    Navraj Group, SECTOR 37 D
    RERA completion 30 Apr 2027; address names Sector 37D
  • The Esplanade Mall
    DHOOT INFRASTRUCTURE PROJECTS LIMITED, SECTOR 37C
    RERA completion 11 Aug 2022; address names Sector 37C
  • The Heartsong
    Experion, SECTOR 108, GURUGRAM
    RERA completion 16 Oct 2018; address names Sector 108
  • The Heartsong Phase-5,2 No. Nursery School
    Experion, VILLAGE DHARAMPUR,SECTOR-108, GURUGRAM
    RERA completion 27 Aug 2020; address names Sector 108
  • The Kingstown Heights
    Navraj Group, SECTOR 37D
    RERA completion 1 Jan 2031; address names Sector 37D
  • The Millennia 2
    SARVPRIYA SECURITIES PVT LTD, VILLAGE BASAI AND GADOLI KHURD SECTOR 37 D GURUGRAM HARYANA
    RERA completion 29 Feb 2024; address names Sector 37D
  • The Millennia-3
    STERNAL BUILDCON PRIVATE LIMITED, VILLAGE GADOLI KALAN, SECTOR 37D
    RERA completion 30 Dec 2025; address names Sector 37D
  • The Millennia-Iv
    STERNAL BUILDCON PRIVATE LIMITED, VILLAGE GADAULI KALAN, SECTOR 37D, GURUGRAM-MANESAR, DIST. GURUGRAM, HARYANA
    RERA completion 31 Dec 2025; address names Sector 37D
  • The Skyline
    MRG CASTLE REALITY LLP, VILLAGE BABUPUR, SECTOR-106
    RERA completion 30 Jun 2025; address names Sector 106
  • The Walk
    MRG GROUP INDIA PRIVATE LIMITED, SECTOR-106, GURUGRAM
    RERA completion 15 Nov 2027; address names Sector 106
  • Vanmaya Premium Residences
    AGRANTE REALTY LIMTED, SECTOR-106, REVENUE ESTATE- DHARAMPUR & BABUPUR, GURUGRAM
    RERA completion 31 Dec 2030; address names Sector 106
  • Vanmaya Premium Residences
    AGRANTE REALTY LIMTED, SECTOR-106, REVENUE ESTATE- DHARAMPUR & BABUPUR, GURUGRAM
    RERA completion 31 Oct 2030; address names Sector 106
  • Vanya City
    BETTERCHOICE REALTORS PVT LTD, SECTOR 99A
    RERA completion 31 Oct 2025; address names Sector 99A
  • Vienna Greens
    SKYWHALES DEVELOPERS LLP, SECTOR 99A
    RERA completion 30 Jan 2026; address names Sector 99A
  • Westerlies
    Experion, SECTOR 108
    RERA completion 30 Jan 2024; address names Sector 108
  • Westerlies
    Experion, SECTOR 108
    RERA completion 11 Sep 2024; address names Sector 108
  • Yashika-104
    APRICUS HILLS PRIVATE LIMITED, VILLAGE DHANWAPUR, SECTOR-104, GURUGRAM
    RERA completion 6 Jan 2027; address names Sector 104
  • Zara Aavaas- 2
    PERFECT BUILDWELL PVT. LTD., SECTOR-104, GURUGRAM
    RERA completion 14 Feb 2024; registration lapsed; address names Sector 104
  • Zara Aavaas-3
    PERFECT BUIDWELL PVT LTD, SECTOR 104, GURUGRAM
    RERA completion 30 Jun 2025; address names Sector 104
  • Zephyr At The Westerlies
    Experion, SECTOR 108, GURUGRAM
    RERA completion 10 Jul 2024; registration lapsed; address names Sector 108

Comparing projects in Dwarka Expressway? A ReraTracker advisor can talk you through RERA dates, builders and prices.

Prices

Builder asking prices for apartments from 55 projects, updated Sep 2025–Sep 2026.

Median ₹/sq ft
₹17,500
Lowest ₹10,500Highest ₹35,000
Since launch
+11%
median change, 50 projects

Homes by size

From the unit types builders list. Carpet efficiency is the carpet area as a share of the area you pay for.

  • 1 BHK

    4 projects

    ₹2.07–4.93 Cr

    Carpet areas not listed by 3 projects yet

  • 2 BHK

    17 projects

    ₹1.57–5.44 Cr

    Carpet
    848 sq ft
    Efficiency
    55%
    ₹/carpet sq ft
    ₹32,226
  • 3 BHK

    44 projects

    ₹2.1–11.99 Cr

    Carpet
    1,322 sq ft
    Efficiency
    55%
    ₹/carpet sq ft
    ₹33,624
  • 4 BHK

    39 projects

    ₹3.43–22.7 Cr

    Carpet
    1,736 sq ft
    Efficiency
    54%
    ₹/carpet sq ft
    ₹36,387
  • 5 BHK

    5 projects

    ₹4.93–16.2 Cr

    Carpet
    2,280 sq ft
    Efficiency
    53%
    ₹/carpet sq ft
    ₹37,928
  • Penthouse Duplex

    6 projects

    ₹4.33–16.84 Cr

    Carpet
    3,269 sq ft
    Efficiency
    51%
    ₹/carpet sq ft
    ₹41,811

Delivery record

RERA completion dates after extensions, from the RERA filings.

Past RERA date
17
neither ready to move nor cancelled
With a RERA date
157
of 160 projects
Registration lapsed
29
as marked by HRERA

Projects due each year

Due 2026–2028: 33 projects, 7,336 homes

By RERA completion year. Hatched columns are years already past.

  1. 2018: 7 projects, past
  2. 2019: 3 projects, past
  3. 2020: 7 projects, past
  4. 2021: 6 projects, past
  5. 2022: 7 projects, past
  6. 2023: 8 projects, past
  7. 2024: 16 projects, 433 homes, past
  8. 2025: 17 projects, 2,262 homes, past
  9. 2026: 14 projects, 2,716 homes
  10. 2027: 10 projects, 1,766 homes
  11. 2028: 9 projects, 2,854 homes
  12. 2029: 10 projects, 2,130 homes
  13. 2030: 7 projects, 2,706 homes
  14. 2031: 18 projects, 8,299 homes
  15. 2032: 12 projects, 5,728 homes
  16. 2033: 4 projects, 2,022 homes
  17. 2034: 1 project, 172 homes
  18. 2035: 0 projects
  19. 2036: 1 project

Builders here

Most projects first. A chip marks projects past their RERA date, lapsed or extended; no chip means none.

Show all 70 builders
  • Hero Homes4 projects
  • ATHENA INFRASTRUCTURE LTD.3 projects
    1 lapsed
  • 2 lapsed
  • Central Park3 projects
  • ELAN3 projects
  • Smartworld3 projects
  • AIPL2 projects
  • ATS Homecraft2 projects
  • Chintels India2 projects
  • COUNTRYWIDE PROMOTERS PRIVATE LIMITED2 projects
    1 past date1 lapsed
  • HCBS2 projects
    1 past date
  • Indiabulls2 projects
    1 lapsed
  • Max Estates2 projects
  • Pareena2 projects
  • RAHEJA DEVELOPERS LTD.2 projects
    1 past date2 lapsed
  • RENUKA TRADERS PVT LTD2 projects
  • Satya Group2 projects
  • SECTOR -113,GATEVIDA DEVELOPERS PVT.LTD.2 projects
  • SELENE CONSTRUCTION LTD2 projects
  • 1000 TREES HOUSING PRIVATE LIMITED1 project
  • Aarize1 project
  • Adani Realty1 project
  • ADDRESS INFRASTRUCTURES PRIVATE LIMITED1 project
  • 1 lapsed
  • Assotech1 project
    1 past date1 lapsed
  • BRISK INFRASTRUCTURES AND DEVELOPERS PVT LTD1 project
  • Chintamanis1 project
  • Conscient1 project
  • CORDIAL INFRASTRUCTURE PVT. LTD1 project
  • COSMOS INFRA ENGINEERING INDIA PVT LTD1 project
    1 past date1 lapsed
  • DELURIS BUILDTECH INDIA PVT LTS1 project
  • Diplomats1 project
    1 past date1 lapsed
  • DISHITA INFRA PVT. LTD.1 project
  • DREAMHOME INFRASTRUCTURE PVT. LTD.1 project
    1 past date
  • EMAAR MGF LAND LTD.1 project
  • EMPERIUM INFRASTRUCTURE PRIVATE LIMITED1 project
  • EMPIRE REALTECH PVT. LTD.1 project
    1 past date1 lapsed
  • GENEROUS REALTORS PRIVATE LIMITED1 project
    1 lapsed
  • HABITAT TOWNSHIP PVT. LTD1 project
  • JMS BUILDTECH PVT. LTD1 project
  • KNS INFRACON PVT.LTD1 project
    1 past date
  • 1 lapsed
  • MAGIC EYE DEVELOPERS PRIVATE LIMITED1 project
    1 lapsed
  • MVN1 project
  • NANI RESORTS & FLORICULTURE PVT. LTD.1 project
    1 lapsed
  • PAREENA BUILDERS & PROMOTERS PVT. LTD.1 project
    1 lapsed
  • PRIME INFRADEVELOPERS PVT LTD1 project
  • PRIME INFRASTRUCTURE PVT. LTD1 project
  • RMG DEVELOPERS PVT. LTD1 project
    1 lapsed
  • ROSE BUILDING SOLUTIONS PRIVATE LIMITED1 project
  • SEPSET PROPERTIES PVT.LTD.1 project
  • SIGNATURE BUILDERS PVT. LTD1 project
    1 past date
  • SUNCITY PROJECTS PVT LTD1 project
  • Vatika1 project
    1 lapsed
  • VS REALPROJECTS PVT.LTD1 project
    1 past date1 lapsed
  • VSR Infratech1 project
  • Y B BUILDERS PVT LTD1 project

Sectors

Our team defines each micro-market by its sectors; a sector can belong to more than one. Prices are the median apartment ₹/sq ft where 3 or more projects list one.

Most projects first; deeper tiles have more.

  • Sector 103

    15 projects₹19,000/sq ft

  • Sector 102

    11 projects₹17,500/sq ft

    Also in New Gurgaon

  • Sector 106

    10 projects₹17,500/sq ft

  • Sector 113

    10 projects₹17,000/sq ft

  • Sector 36A

    8 projects₹22,350/sq ft

    Also in CPR (Central Peripheral Road)

  • Sector 99A

    8 projects

  • Sector 104

    8 projects₹23,125/sq ft

  • Sector 37D

    6 projects₹14,500/sq ft

Show all 18 sectors
  • Sector 109

    6 projects

  • Sector 111

    6 projects₹21,000/sq ft

  • Sector 110

    4 projects

  • Sector 114

    4 projects

  • Sector 37C

    3 projects

  • Sector 99

    3 projects

  • Sector 105

    3 projects

  • Sector 108

    3 projects

  • Sector 112

    3 projects

  • Sector 102A

    1 project

Also covers sectors 100, 101, 107 and 115, with no checked projects yet.

48 projects with no recorded sector of this micro-market.

What’s around

Named places inside the micro-market, then those within 1 km of its edge.

2 railway stations

  • Gurgaon
  • Basai Dhankot

8 schools

  • Sidheshwar Public School
  • Chiranjiv Bharati School
  • Alpine Convent School, Sector 10
Within 1 km:
  • Colonel's Central Academy
  • New Light Public School
  • Blue Bells Model Sr. Sec. School
  • Marudyan School
  • GD Goenka Public School

1 college or university

  • Govt. P.G. College, Sector-9, Gurugram

16 hospitals

  • R K Hospital, Gurgaon
  • Bhardwaj Hospital
  • Chirag Hospital Pvt. Ltd
  • Kalyan Hospital, Gurgaon
  • Shri Balaji`S Multispeciality Hospital
  • Civil Hospital, Sector 10, Gurugram
  • Kamla Hospital
  • Shri Balaji Hospital and Trauma Center
  • and 8 more

3 malls

  • Shopping Complex
  • Satya The Hive
  • The Esplanade Mall

2 markets

Within 1 km:
  • Palam Vihar Vyapar kendra
  • Palam triangle

4 parks

  • Netaji Subhash Chandra Bose Park
  • Major Vinod Rana Park
  • Central Greens
  • Rose Garden

Map data © OpenStreetMap contributors. Outlines are approximate.

News

About projects here first, then about builders active here.

Nearby micro-markets

How Dwarka Expressway compares with the micro-markets around it.

  • New launch
  • Under construction
  • Ready to move
  • Stalled or on hold
  • Cancelled
  • Dwarka Expressway

    This micro-market

    160 projects₹17,500/sq ft11% past date

  • 8 projects₹22,350/sq ft0% past date

  • 28 projects₹23,250/sq ft29% past date

  • 148 projects₹15,000/sq ft19% past date

  • SPR

    Gurgaon

    81 projects₹15,000/sq ft15% past date

  • Sohna Road

    Gurgaon

    23 projects₹23,400/sq ft17% past date

  • 44 projects₹15,000/sq ft18% past date

Frequently asked questions

How many RERA projects are in Dwarka Expressway?

ReraTracker lists 160 RERA-registered projects in Dwarka Expressway, checked by our team.

What is the price per sq ft in Dwarka Expressway?

The median builder asking price for apartments in Dwarka Expressway is ₹17,500 per sq ft, from ₹10,500 to ₹35,000, across 55 priced projects, updated Sep 2025–Sep 2026.

Which builders have projects in Dwarka Expressway?

The builders with the most projects in Dwarka Expressway are Signature Global, M3M and SOBHA.

Which sectors are in Dwarka Expressway?

Dwarka Expressway covers sectors 36A, 37C, 37D, 99, 99A, 100–102, 102A and 103–115. Its boundary is approximate.

How many projects in Dwarka Expressway are past their RERA completion date?

17 projects in Dwarka Expressway are past their RERA completion date and are neither ready to move nor cancelled.

Projects and dates come from RERA filings (UP RERA, HRERA and Delhi RERA) and ReraTracker’s research. Prices are builder asking prices. Outlines are approximate. Map data © OpenStreetMap contributors.