NEWActive

GODREJ SAMARIS

GURUGRAM, WAZIRABAD ST
02-04-2026
RERA Received Date
NEW
Type
2033-08-31
Completion Date

Overview

Launch Date

11-05-2026

RERA Received Date

02-04-2026

Completion Date

2033-08-31

RERA ID

RERA-GRG-2216-2026

Basic Details

Project NameGODREJ SAMARIS
Project IDRERA-GRG-2216-2026
Project TypeNEW
Applicant TypeCompany
Submission Date02-04-2026 03:00:41 PM
Builder NameGODREJ PROPERTIES LIMITED
CINL74120MH1985PLC035308
PANXXXX995M
WebsiteHttps://www.godrejproperties.com
Phone (Mobile)1244956150
Phone (Landline)01244956150
Registered Address3RD FLOOR, PLOT NO. 35, UM HOUSE, SECTOR 44, GURUGRAM, HARYANA 122002
Project AddressGH-24, URBAN ESTATE, SECTOR 53, GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Bank Details

Bank NameHDFC BANK LTD, SPLENDOR TRADE TOWER, UNIT 18C AND 18D, GOLF COURSE EXT. ROAD, SECTOR 65, GURGAON 122001
Account Number99909667754503
IFSC CodeHDFC0003676
MICR Code110240366
Branch Code3676

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. N.B. Godrej, Mr. Pirojsha Godrej, Mr. Gaurav Pandey, Mr. Rajendra Khetawat, Mr. Alcide Coelho, Mr. Amit Kumar, Mr. Amitesh Shah, Mr. Anand Kheria, Mr. Anil Goel, Mr. Ankur Aggrwal, Mr. Aroop Chatterjee, Mr. Ashish Karyekar, Mr. Ashwini Prasad Kalapala, Mr. Avinash Kothari, Mr. Bikash Kumar Ram, Mr. Deendayal Bagla, Mr. Lalit Makhijani, Mr. Madhu Gogula, Mr. Mayank Poddar, Mr. Rahul Dedhia, Mr. Rakesh Agarwal, Mr. Rohit Mohan, Mr. Sanddep Navlakhe, Mr. Sandipan Pal, Mr. Sanjay Bhattacharya, Mr. Santosh Sahu, Mr. Saurabh Mohindru, Mr. Srikanth Srinivasan, Mr. Subhasish Pattanaik, Mr. Sukant Somani, Ms. Aparna Barve, Ms. Apeksha Desai, Ms. Geetikha Trehan, Ms. Komal Dedhia, Ms. Megha Goel, Ms. Shilpa Tarkar, Mr. Sushil Kumar Sharma, Mr. Anju Agarwal, Mr. Praveen Kumar Yadav, Mr. Yogesh Singla, Ms. Nidhi Bharadwaj, Mr. Niraj Lodha, Mr. Tarun Chopra & Mr. Ravi Shankar Mittal Office address 3rd Floor, UM House, Sector 44 , Gurugram-122002
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area29999.46 (Sqr/mtrs)
Proposed FAR4.05
Permissible FAR4.13
Total Licensed Land29999.46 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4821.03
CONSTRUCTION OF ROADS6081.21
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION1626.84
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
COMMERCIAL147.71
STP768.90
RAIN538.23
SOFTSCAPES4463.68
HARDSCAPES6534.05
COMMUNITY5017.75
Total29999.4

Cost Details

Land Cost121874.30 Lakhs
Other Cost61307.82 Lakhs
Estimated Project Cost364675.41 Lakhs
Estimated Infrastructure Cost13705.31 Lakhs
Estimated Apartment Construction Cost167787.98 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 02-04-2026

DEMARCATION PLAN

Uploaded on: 02-04-2026

ZONING PLAN

Uploaded on: 02-04-2026

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 02-04-2026

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 02-04-2026

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 02-04-2026

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 02-04-2026

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 02-04-2026

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 27-04-2026

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 04-05-2026

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 04-05-2026

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 27-04-2026

Statutory Approvals

BUILDING PLANDate: 30-03-2026Status: ALREADY BEEN OBTAINED
CONVEYANCE DEEDDate: 17-02-2026Status: ALREADY BEEN OBTAINED
ASSURANCE OF WATER SUPPLYDate: 17-06-2025Status: ALREADY BEEN OBTAINED
ASSURANCE FOR SEWERAGE CONNECTIONDate: 10-07-2025Status: ALREADY BEEN OBTAINED
ASSURANCE FOR STORM WATERDate: 09-07-2025Status: ALREADY BEEN OBTAINED
HUDA CONSTRUCTIONDate: 10-07-2025Status: ALREADY BEEN OBTAINED
AAIDate: 11-03-2025Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 09-10-2025Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 09-03-2026Status: ALREADY BEEN OBTAINED
LOIDate: 23-10-2024Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 22-04-2026Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
SOFTSCAPEAS PER PROJECT REPORT
HARDSCAPEAS PER PROJECT REPORT
ELECTRICAL SUBSTATIONAS PER PROJECT REPORT
SIGNAGESAS PER PROJECT REPORT

NOC

ROADSProvider: ALREADY CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: MCGApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Pending
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

YASHITA ARORA
Name
YASHITA ARORA
PAN
XXXX806H
Mobile
1244956150
Landline
1244956150
Address
802 Bliss 1. Skye luxuria Nipania Indore-452010

Managing Director/CEO

PIROJSHA ADI GODREJ
Name
PIROJSHA ADI GODREJ
PAN
XXXX791J
Mobile
2261698500
Landline
02261698500
Address
Aashraye Godrej House 67H Walkeshwar Road Malabar Hills Mumbai Maharashtra 400006

Directors

GAURAV PANDEY
Name
GAURAV PANDEY
PAN
XXXX659J
Mobile
2261698500
Landline
02261698500
Address
Villa 150 Block X Tatavam Hills Sector-48 South City II Gurugram
NADIR GODREJ
Name
NADIR GODREJ
PAN
XXXX643Q
Mobile
2261698500
Landline
02261698500
Address
Opp. Malabar Hill Police Station 40-D BG Kher Marg Malabar Hill Mumbai 400006

Contact Details

Project ContactEmail: [email protected]Mobile: 1244956150Landline: 01244956150
Project Contact PersonName: YASHITA ARORAEmail: [email protected]Mobile: 1244956150Landline: 01244956150

Land Details

Land Area29999.46 (Sqr/mtrs)
Proposed FAR4.05
Permissible FAR4.13
Total Licensed Land29999.46 (Sqr/mtrs)

Land Usage

Land Cost121874.30 Lakhs
Other Cost61307.82 Lakhs
Estimated Project Cost364675.41 Lakhs
Estimated Infrastructure Cost13705.31 Lakhs
Estimated Apartment Construction Cost167787.98 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0268.4268.4447.33
ELECTRICAL SUB STATION----
ELECTRICAL SUBSTATION----
Electricity Supply System0000
HARDCSCAPE----
HARDSCAPE----
Other0000
PARKING----
Parking----
Parks and Playgrounds0000
RAIN WATER HARVESTING4.174.174.174.17
RENEWABLE ENERGY SYSTEM----
Roads & Pavements0000
SECURITY AND FIREFIGHTING----
SIGNAGES----
SIGNANGES----
SOFTSCAPE----
STP0.920.920.920.92
STREET LIGHTING----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
UNDERGROUND WATER TANK0.380.380.380.38
Water Supply System0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres447.33626.27626.27626.27
ELECTRICAL SUB STATION----
ELECTRICAL SUBSTATION----
Electricity Supply System0000
HARDCSCAPE----
HARDSCAPE----
Other0000
PARKING--1.533.06
Parking----
Parks and Playgrounds0000
RAIN WATER HARVESTING12.512.512.516.67
RENEWABLE ENERGY SYSTEM----
Roads & Pavements0000
SECURITY AND FIREFIGHTING----
SIGNAGES----
SIGNANGES----
SOFTSCAPE----
STP2.752.752.753.67
STREET LIGHTING----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
UNDERGROUND WATER TANK1.131.131.131.51
Water Supply System0000
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres626.27626.27626.27536.8
ELECTRICAL SUB STATION-45.83137.5152.77
ELECTRICAL SUBSTATION----
Electricity Supply System35.7235.7234.9535.33
HARDCSCAPE----
HARDSCAPE---11.47
Other0000
PARKING4.594.597.6510.7
Parking----
Parks and Playgrounds0000
RAIN WATER HARVESTING16.6716.6720.8320.83
RENEWABLE ENERGY SYSTEM----
Roads & Pavements38.5338.5337.6938.11
SECURITY AND FIREFIGHTING---7.61
SIGNAGES----
SIGNANGES----
SOFTSCAPE----
STP3.673.674.594.59
STREET LIGHTING---11.7
Sewerage treatment & garbage disposal006.296.36
Shopping area0000
Storm Water Drainage02.036.16.16
UNDERGROUND WATER TANK1.511.511.891.89
Water Supply System002.452.47
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres447.33447.33447.33447.33
ELECTRICAL SUB STATION152.77152.77152.77152.77
ELECTRICAL SUBSTATION----
Electricity Supply System35.7235.7234.9535.33
HARDCSCAPE----
HARDSCAPE11.4711.4711.4711.47
Other0000
PARKING13.7615.9815.63-
Parking---15.81
Parks and Playgrounds0000
RAIN WATER HARVESTING25252529.17
RENEWABLE ENERGY SYSTEM-6.76.78.84
Roads & Pavements38.5338.5337.6938.11
SECURITY AND FIREFIGHTING7.697.698.268.34
SIGNAGES--22.7829.62
SIGNANGES----
SOFTSCAPE----
STP5.55.55.56.42
STREET LIGHTING11.8211.8211.5711.57
Sewerage treatment & garbage disposal6.436.436.978.4
Shopping area017.4326.1526.15
Storm Water Drainage6.236.236.978.4
UNDERGROUND WATER TANK2.262.262.262.64
Water Supply System2.52.52.713.27
2032 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres357.87357.87268.4268.4
ELECTRICAL SUB STATION-152.77152.77106.94
ELECTRICAL SUBSTATION152.77---
Electricity Supply System50.5640.8834.9527.73
HARDCSCAPE----
HARDSCAPE11.4711.4711.4711.47
Other0000
PARKING15.9815.9815.6310.25
Parking----
Parks and Playgrounds0000
RAIN WATER HARVESTING29.1738.2238.2236.56
RENEWABLE ENERGY SYSTEM8.316.76.76.7
Roads & Pavements38.5338.5337.6925.55
SECURITY AND FIREFIGHTING9.97.697.525.01
SIGNAGES29.6229.6245.5741.01
SIGNANGES----
SOFTSCAPE-148.24148.24148.24
STP6.428.428.428.05
STREET LIGHTING11.8211.8211.5712.17
Sewerage treatment & garbage disposal7.797.115.614.81
Shopping area26.1526.1526.1517.43
Storm Water Drainage7.797.115.614.81
UNDERGROUND WATER TANK2.643.463.463.31
Water Supply System3.032.762.181.87
2033 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres178.93---
ELECTRICAL SUB STATION15.28---
ELECTRICAL SUBSTATION----
Electricity Supply System11.29---
HARDCSCAPE11.47---
HARDSCAPE----
Other0---
PARKING1.77---
Parking----
Parks and Playgrounds0---
RAIN WATER HARVESTING16.17---
RENEWABLE ENERGY SYSTEM2.95---
Roads & Pavements12.93---
SECURITY AND FIREFIGHTING3.88---
SIGNAGES----
SIGNANGES29.62---
SOFTSCAPE148.24---
STP3.56---
STREET LIGHTING7.24---
Sewerage treatment & garbage disposal1.73---
Shopping area8.72---
Storm Water Drainage0.5---
UNDERGROUND WATER TANK1.46---
Water Supply System0.67---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILING/LAMINATED WOODEN FLOORING/SKID RESISTANT VITRIFIED TILES/WOODEN LOOK SKID RESISTANT TILES
WALL FINISHING DETAILSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
KITCHEN DETAILSFLOOR: VITRIFIED TILES, WALL: TILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT, CEILING: OIL BOUND DISTEMPER
BATHROOM FITTINGSSANITARY FIXTURES & FITTINGS OF REPUTE MAKE
WOOD WORK ETCLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
DOORS AND WINDOS FRAMESMAIN DOOR: DESIGNER DOOR SHUTTER WITH VENEER FINISH INTERNAL DOORS: LAMINATED DOOR SHUTTER EXTERNAL DOOR & WINDOWS: GLAZED WINDOWS ALUMINUM/ UPVC/MS FRAME
GLASS WORK4MM AND ABOVE AS PER SPECIFICATIONS
ELECTRIC FITTINGSAS PER BUILDING NORMS
CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
CUPBOARD DETAILSNA
WATER STORAGEUNDERGROUND AND OVERHEAD WATER TANKS
LIFT DETAILS4 PASSENGER LIFTS AND 1 SERVICE LIFT
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSPOWDER COATED/PAINTED ALUMINUM/UPVC WINDOWS WITH 4MM OR ABOVE THICK GLAZING AS PER SPECIFICATIONS
DOORSLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
MAIN DOORSLAMINATED/PAINTED/POLISHED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
INTERNAL DOORSLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
AIR CONDITIONINGAS PER SPECIFICATION OF STANDARD MAKE
ELECTRICAL FITTINGSAS PER SPECIFICATION OF STANDARD MAKE
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINTS
INTERNAL FINISHING10 TO 12MM THICK PLASTER ON BLOCKWORKS, RCC WALLS AND COLUMNS WITH CEMENT MORTAR OF 1:5

Unit-wise Specifications

TOILET
FLOORSKID RESISTANT VITRIFIED TILES
WALLSTILE CLADDING UP TO GRID CEILING ON ALL SIDES
CEILINGGRID CEILING
COUNTERSGRANITE COUNTER GLASS SHOWER PARTITION
SANITARY WARE/CP FITTINGSGROHE OR EQUIVALENT SANITARY FIXTURES & FITTINGS
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES/ IMPORTED MARBLE
WALLSTILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT
CEILINGOIL BOUND DISTEMPER
COUNTERSGRANITE WITH STAINLESS STEEL SINK
FIXTURESGROHE OR EQUIVALENT FIXTURES & FITTINGS
KITCHEN APPLIANCESMODULAR KITCHEN WITH HOB & CHIMNEY
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORSKID RESISTANT VITRIFIED TILES
WALLSTILE CLADDING UP TO FALSE CEILING ON ALL SIDES
CEILINGGRID CEILING
COUNTERSGRANITE COUNTER
SANITARY WARE/CP FITTINGSGROHE OR EQUIVALENT SANITARY FIXTURES & FITTINGS
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES/ IMPORTED MARBLE
WALLSACRYLIC EMULSION PAINT
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGACRYLIC EMULSION/OIL BOUND DISTEMPER
TOILETOIL BOUND DISTEMPER
BALCONYNA

Fee Details

Payment 1
amount:6590550
cheque no:1016
draft date:19-02-2026
payable to:HRERA Gurugram
payee bank:HDFC BANK