TREVOC ROYAL RESIDENCES

GURUGRAM, GURGAON
01-08-2024
Launch Date
NEW
Type
2030-02-06
Completion Date

Overview

Launch Date

01-08-2024

Completion Date

2030-02-06

Project Size

2 Buildings - 172 units

RERA ID

RERA-GRG-1700-2024

Basic Details

Project NameTREVOC ROYAL RESIDENCES
Project IDRERA-GRG-1700-2024
Project TypeNEW
Applicant TypeCompany
Submission Date01-08-2024 04:10:39 PM
Builder NameJHS ESTATE PRIVATE LIMITED
CINU68100DL2023PTC412322
PANXXXX527R
Emailhello@trevocgroup.com
Websitehttps://www.jhsestate.com/
Phone (Mobile)9811566292
Phone (Landline)01246920555
Registered AddressSPAZE BUSINESS PARK,TOWER B, 3RD & 4TH FLOOR, SECTOR-66,GURUGRAM-122018,HARYANA
Project AddressSECTOR 56, URBAN ESTATE, GURGAON II, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Location

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameKOTAK MAHINDRA BANK, BADSHAPUR BRANCH, GURUGRAM
Account Number5849394150
IFSC CodeKKBK0000298
MICR Code110485057
Branch Code000298

Account Related Information

Annex copy of the balance sheet of last 3 yearsNo
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Gurpal Chawla and Mr Sehaj Chawla(both R/o: K S Farm, Khasra No. 482/ 483,Opp Air Force Station, Rajokri, AF Rajokri, Vasant Vihar, Delhi - 110038
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area2.059 (Acre)
Proposed FAR4.12
Permissible FAR4.12
Total Licensed Land2.059 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3415.462
CONSTRUCTION OF ROADS2338.29
PAVEMENTS0
PARKS AND PLAYGROUNDS808.959
GREEN BELTS499.151
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION47.062
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER100.7673
GUARDROOMANDBASEMENTANDSTAIRCASEMUMTY30.968
COMMERCIAL1057.639
RAINWATERHARVESTING36.00
Total8334.2983

Cost Details

Land Cost14919.23 Lakhs
Other Cost12828.27 Lakhs
Estimated Project Cost58977.57 Lakhs
Estimated Infrastructure Cost5490.67 Lakhs
Estimated Apartment Construction Cost25739.4 Lakhs

Documents

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 01-08-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 01-08-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 01-08-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 01-08-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 01-08-2024

TOWER A AND B ELEVATION A

Uploaded on: 04-09-2024

SITE PLAN WITH MEP

Uploaded on: 04-09-2024

TOWER A - LOWER PENT HOUSE FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

AFFIDAVIT FOR 4 2 L D

Uploaded on: 04-09-2024

ENVIRONMENT CLEARANCE

Uploaded on: 04-09-2024

BANK UNDERTAKING

Uploaded on: 04-09-2024

DEMARCATION PLAN

Uploaded on: 04-09-2024

UNDERTAKING FREE FROM ENCUMBRANCE

Uploaded on: 04-09-2024

CA CERTIFICATE-QUATERLY EXPENDITURE, QUATERLY CASHFLOW AND QUATERLY FUND FLOW

Uploaded on: 04-09-2024

4TH FLOOR COMMERCIAL AND AREA DIAGRAM

Uploaded on: 04-09-2024

HSVP BUILDING PLAN APPROVAL

Uploaded on: 04-09-2024

PODIUM 3 - 3RD FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

SUPERIMPOSED PLAN

Uploaded on: 04-09-2024

TOWER A AND B SECTION B

Uploaded on: 04-09-2024

TERRACE AND ROOF PLAN

Uploaded on: 04-09-2024

NOC FROM DEBENTURE TRUSTEE

Uploaded on: 04-09-2024

LOI

Uploaded on: 04-09-2024

AIRPORT HEIGHT CLEARANCE

Uploaded on: 04-09-2024

MINING PERMISSION

Uploaded on: 04-09-2024

NON APPLICABILITY OF POWER LINE SHIFTING

Uploaded on: 04-09-2024

FOREST NOC

Uploaded on: 04-09-2024

SALE DEED OF THE LAND

Uploaded on: 04-09-2024

PODIUM 1 - 1ST FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

TYPE A AND TYPE B UNIT PLAN

Uploaded on: 04-09-2024

TYPE C AND TYPE D UNIT PLAN

Uploaded on: 04-09-2024

TYPE E UNIT PLAN

Uploaded on: 04-09-2024

TOWER A - UPPER PENT HOUSE FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

TOWER A AND B SECTION C

Uploaded on: 04-09-2024

SUPERIMPOSED PLAN

Uploaded on: 04-09-2024

APPLICATION TO ISSUE CERTIFIED COPY OF REVISED ZONING PLAN

Uploaded on: 04-09-2024

NON APPLICABILITY OF NCZ

Uploaded on: 04-09-2024

FIRE FIGHTING

Uploaded on: 04-09-2024

VARIOUS APPROVALS

Uploaded on: 04-09-2024

GROUND FLOOR PLAN (LOBY AND COMMERCIAL) AND AREA DIAGRAM AND GROUND COVERAGE

Uploaded on: 04-09-2024

TOWER A AND B SECTION A

Uploaded on: 04-09-2024

TOWER A - SERVICE FLOOR

Uploaded on: 04-09-2024

SITE PLAN WITH GREEN AREA CALCULATION

Uploaded on: 04-09-2024

HSVP ALLOTMENT LETTER

Uploaded on: 04-09-2024

POWER ASSURANCE LETTER

Uploaded on: 04-09-2024

TOWER A - FLOOR PLAN 6TH - 14TH FLOOR

Uploaded on: 04-09-2024

ASSURANCE OF DRINKING, SEWER AND STORM CONNECTION

Uploaded on: 04-09-2024

TREE CUTTING PERMISSION

Uploaded on: 04-09-2024

5TH FLOOR PLAN

Uploaded on: 04-09-2024

BASEMENT PLAN 01 - PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

BASEMENT PLAN 02 - PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

PODIUM 2 - 2ND FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 04-09-2024

TOWER A AND B ELEVATION B

Uploaded on: 04-09-2024

TOWER A - FLOOR 15 AND 24 AND AREA DIAGRAM

Uploaded on: 04-09-2024

Statutory Approvals

NO OBJECTION CERTIFICATE FOR HEIGHT CLEARANCEDate: 26-02-2024Status: ALREADY BEEN OBTAINED
ASSURANCE FOR DRINKING WATER SUPPLY, SEWERCONNECTION AND STORM WATER CONNECTIONDate: 07-02-2024Status: ALREADY BEEN OBTAINED
NOC FOR USE OF TREATED WASTE WATER FORCONSTRUCTION ACTIVITIESDate: 13-02-2024Status: ALREADY BEEN OBTAINED
GRANT OF PERMISSION FOR TRANSFER OF TDR CERTIFICATESDate: 09-04-2024Status: ALREADY BEEN OBTAINED
ASSURANCE CERTIFICATE OF DHBVN FOR POWER SUPPLYDate: 22-02-2024Status: ALREADY BEEN OBTAINED
GREEN RATING FOR INTEGRATED HABITAT ASSESSMENTDate: 22-02-2024Status: ALREADY BEEN OBTAINED
REQUEST FOR REDUCING OF MINIMUM SETBACKSDate: 20-02-2024Status: ALREADY BEEN OBTAINED
SITE CO-ORDINATES IN WGS 84 AND SITE ELEVATIONCERTIFICATEDate: 13-02-2024Status: ALREADY BEEN OBTAINED
TREE CUTTING PERMISSIONDate: 05-02-2024Status: ALREADY BEEN OBTAINED
APPROVAL FOR NO ENCROACHMENT ON SITE, NOLITIGATION ON SITE, NO HT LINE PASSING OVER THE SITE,NO HARYANA CITY GAS DISTRIBUTION PIPELINE PASSINGOVER OR UNDER THE SITE, NO EFFECT OF PLPA ACT ONSITE, NO EFFECT OF ARAVALI NOTIFICATION, NO FORESTLAND ON SITE, NO EFFECT OF NATURAL CONSERVATIONZONE.Date: 02-02-2024Status: ALREADY BEEN OBTAINED
SITE PLANSDate: 29-07-2024Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 29-07-2024Status: ALREADY BEEN OBTAINED
FIRE FIGHTING SCHEMEDate: 28-08-2024Status: ALREADY BEEN OBTAINED
MINING PERMISSIONDate: 20-08-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERAS PER PROJECT REPORT
SEWERAGE SYSTEMYET TO BE PREPARED
STPYET TO BE PREPARED
UNDERGROUND WATER TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED

NOC

ROADSProvider: CONNECTED ROADTHROUGH HUDA (APPROVAL NOT REQUIRED)Approval Status: Pending
WATER SUPPLYProvider: HSVP (ASSURANCE GRANTED)Approval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVP (ASSURANCE GRANTED)Approval Status: Approved

Project Team

Authorized Representative

MOHAN KUMAR NAIR
Name
MOHAN KUMAR NAIR
PAN
XXXX881Q
Email
mohan.nair@trevocgroup.com
Mobile
9811566292
Landline
01246920555
Address
28C B- 12 A Dhawlagiri Apartments Sector34 Noida - 201301

Managing Director/CEO

GURPAL SINGH CHAWLA
Name
GURPAL SINGH CHAWLA
PAN
XXXX402R
Email
hello@trevocgroup.com
Mobile
9355581442
Landline
01246920555
Address
K S Farms Khasra No. 482483 Opp. Air Force Station Rajokri A F Rajokri Vasant Vihar Delhi - 110038

Directors

SEHAJ CHAWLA
Name
SEHAJ CHAWLA
PAN
XXXX948G
Email
hello@trevocgroup.com
Mobile
9355581443
Landline
01246920555
Address
K S Farms Khasra No. 482483 Opp. Air Force Station Rajokri A F Rajokri Vasant Vihar Delhi - 110038

Contact Details

Project ContactEmail: royal.residences@trevocgroup.comMobile: 9911911138Landline: N/A
Project Contact PersonName: PRAHLAD DALALEmail: prahlad.dalal@trevocgroup.comMobile: 9911911138Landline: N/A

Land Details

Land Area2.059 (Acre)
Proposed FAR4.12
Permissible FAR4.12
Total Licensed Land2.059 (Acre)

Land Usage

Land Cost14919.23 Lakhs
Other Cost12828.27 Lakhs
Estimated Project Cost58977.57 Lakhs
Estimated Infrastructure Cost5490.67 Lakhs
Estimated Apartment Construction Cost25739.4 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN/ IMPORTED MARBLE/ VITRIFIED TILE/LAMINATE WOODEN FLOORING/ ANTISKIDVITRIFIED
WALL FINISHING DETAILSPLASTER + DADO UP TO 7FT IN VITRIFIEDTILE(ONLY FOR TOILETS)
KITCHEN DETAILSWALLS: PLASTER + DADO ABOVE COUNTERUP TO 2FT HIGH IN VITRIFIED TILE
BATHROOM FITTINGSNA
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME WITH FLUSHDOOR/LAMINATE OR SKIN DOOR PANELS
GLASS WORKUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
ELECTRIC FITTINGSMODULAR SWITCHES AND SOCKETS
CONDUCTING AND WIRING DETAILS1.5 SQMM - 4 SQMM FRLS COPPER WIRING
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSNA
EXTERNAL GLAZINGSUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
WINDOWS/GLAZINGSUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
MAIN DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
AIR CONDITIONINGVRV / VRF
ELECTRICAL FITTINGSPROVISION ONLY
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYTHROUGH FTTH SYSTEM
EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE WEATHERSHIELD PAINT
INTERNAL FINISHINGPUTTY WITH COMBINATION OF OBD AND ACRYLIC EMULSION, PLASTER NOT REQUIRED FOR RCC SURFACES

Unit-wise Specifications

TOILET
FLOORANTISKID VITRIFIED / CERAMIC TILES
WALLSPLASTER + DADO UP TO 7FT IN VITRIFIED TILE
CEILINGWATER RESISTANT
COUNTERSSTONE / ENGINEERED STONE
SANITARY WARE/CP FITTINGSEWC, WASH BASIN, SHOWER AND OTHER NECESSARY CP FITTINGS
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES
WALLSPLASTER + DADO ABOVE COUNTER UP TO 2FT HIGHIN VITRIFIED TILE
CEILINGLOW VOC ACRYLIC EMULSION PAINT/OBD
COUNTERSSTONE / ENGINEERED STONE
FIXTURESSS SINK AND CP FITTINGS
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORANTISKID VITRIFIED TILES
WALLS & CEILINGLOW VOC EXTERIOR GRADE WEATHER SHIELDPAINT
RAILINGSGLASS / MS / ALUMINIUM
FIXTURESNA
BED ROOMS
FLOORLAMINATE WOODEN FLOORING/VITRIFIED TILES
WALLSPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
CEILINGPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
WARDROBESNA
MASTER TOILET
FLOORANTISKID VITRIFIED / CERAMIC TILES
WALLSPLASTER + DADO UP TO 7FT IN VITRIFIED TILE
CEILINGWATER RESISTANT
COUNTERSSTONE / ENGINEERED STONE
SANITARY WARE/CP FITTINGSEWC, WASH BASIN, SHOWER AND NECESSARY CP FITTINGS
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORITALIAN/IMPORTED MARBLE/VITRIFIED TILE
WALLSPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
CEILINGPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORITALIAN/IMPORTED MARBLE/VITRIFIED TILE
WALLSLOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES
CEILINGLOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES AND PART FALSE CEILING AS PERDESIGN
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED / CERAMIC TILES
WALLS & CEILINGPUTTY AND PAINT OBD
TOILETANTISKID CERAMIC TILE IN DADO AND FLOOR
BALCONYCERAMIC / VITRIFIED TILES

Fee Details

Payment 1
amount:1242931
cheque no:52024072600618928
draft date:26-07-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:343373
cheque no:52024072600607739
draft date:26-07-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:204415
cheque no:52024082200841750
draft date:22-08-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK