Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Current Price
RERA ID
BSP only. GST, PLC, Parking, IFMS could be add ons.
Total Units
571
4 unit types
Carpet Area
4,80,755 ft²
44,663.66 m² · carpet only, excludes balcony
Blocks & Floors
6
138 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 842 ft² (78.22 m²)Balconies 885Parking per unit 0.005 of 307 rows list no units (5 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 307 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| Cyprus (Tower-4) | GF | OTHER | — | — | — | — |
| Cyprus (Tower-4) | 1 | 4 BHK | 1 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 1 | 3 BHK | 2 | 885 ft²82.25 m² | 2 | 237 ft²21.98 m² |
| Cyprus (Tower-4) | 1 | 3 BHK | 1 | 1,083 ft²100.66 m² | 3 | 289 ft²26.85 m² |
| Cyprus (Tower-4) | 2 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 3 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 4 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 5 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 6 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 7 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 8 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 9 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 10 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 11 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 12 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 13 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 14 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 15 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 16 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 17 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 18 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 19 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 20 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 21 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 22 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 23 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 24 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 25 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 26 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 27 | 4 BHK | 2 | 1,276 ft²118.57 m² | 3 | 326 ft²30.28 m² |
| Cyprus (Tower-4) | 2 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 3 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 4 | 3 BHK | 2 | 885 ft²82.25 m² | 2 | 237 ft²21.98 m² |
| Cyprus (Tower-4) | 5 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 6 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 7 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 8 | 3 BHK | 2 | 885 ft²82.25 m² | 2 | 237 ft²21.98 m² |
| Cyprus (Tower-4) | 9 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 10 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 11 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 12 | 3 BHK | 2 | 885 ft²82.25 m² | 2 | 237 ft²21.98 m² |
| Cyprus (Tower-4) | 13 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 14 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 15 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 16 | 3 BHK | 2 | 885 ft²82.25 m² | 2 | 237 ft²21.98 m² |
| Cyprus (Tower-4) | 17 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 18 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 19 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
| Cyprus (Tower-4) | 20 | 2 BHK | 2 | 722 ft²67.03 m² | 2 | 189 ft²17.53 m² |
| Cyprus (Tower-4) | 21 | 3 BHK | 2 | 885 ft²82.25 m² | 4 | 198 ft²18.36 m² |
Total Plot Area
10.95 acres
44,310.00 m² · plot area
NA
1.5m high boundary wall along front road and 2.0m high boundary wall along other sides with Elegant Design integrated with security rails as per approved design
Peripheral Loop road connects to each tower as per approved building plan
Network of Footpaths connects the various part of the Landscape, Towers and Gardens as per approved building plan
Noida Authority shall provide the water supply to the entire society, further water will be treated and supplied at customer premises through piping, and pumping / gravity system.
Centralized STP to treat sewage and every tower has its own downcomers connected to main sewage line.
Drainage thru network of pipe and catch basin to nearest Storm Water Drain / Rain Water Harvesting Pit.
As per approved Building Plan
As per approved Building Plan
Single feeder shall be taken from Noida Electricity Board and connected to Sub-Station. Entire Project would have street lighting.
Community Building as per approved Building Plan
Central STP for entire Project and all towers shall be connected to STP
Project shall have waste segregation area and OWC for treatment of organic waste
Adequate nos. of Recharge Pits shall be provided.
LED Lights and timer control panel shall be used for efficient energy management.
Fire Alarm System provided for towers with height above 60m.
As per Approved Building Plan
As per approved Building Plan
As per approved Building Plan
Godrej Woods Phase 2 is located in Sector 43, Noida. The project is spread across 10.95 acres.
Yes. Godrej Woods Phase 2 is registered under UPRERAPRJ145318 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Godrej Woods Phase 2 is 28 January 2027.
Godrej Woods Phase 2 is developed by Godrej.
Godrej Woods Phase 2 offers 2 BHK and 3 BHK configurations.
Developed by
55 Projects
EXECUTIVE SUMMARY OF GODREJ Godrej Properties Limited (GPL) is the real estate development arm of the Godrej Industries Group, one of India's oldest and most respected conglomerates with a lineage dating to 1897. Incorpo…
Know More about Godrej