Have queries on this Project?
28.510547
77.416003
Showing 1 blocks with 169 units
Total Carpet Area
10293.75 m²
110800.90 ft²
Total Units
169
3 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
No: Sub Lease Deed Permission Letter No. 2009/2229 | Date:
No: Land No Dues Certificate by NOIDA Authority | Date:
Total Area
45202.50 m²
486555.19 ft²
The Plot No. 01B, Sector 140A, NOIDA had been demarcated by Noida Development Authority.
A Boundary wall of RCC/Brick work of thickness 115mm/230mm/150mm and height of 900/1500/1800mm with plaster and railing will be prepared , it will be as per design.
Access driveway to all the towers will be provided and that drive way of pavers M 30 Grade with thickness of 65mm and 100mm kerb stone on sides if required. At entry of tower there will be pattern as per landscape design.
Footpath will be provided using 40-50mm paver wherever required.
NOIDA Authority shall supply water for the entire project and it shall be collected in under ground water tanks of 178KLX1, 184KLX1, 184KLX1 Nos. raw water and 178KLX1, 167KLX1 nos. domestic water tanks and water with 656mm dia pipes to overhead tanks at respective tower.
STP of 700 KLD will be constructed using RCC and required pump room, STP treated water will be used in flushing, cooling towers and gardening.
Storm water drainage system will be constructed using 400mm dia pipes as per drawing.
Landscape with civil work masonary 115/250mm and stone, pavers, grass and various type of plantation shurbs.
Tree plantation will be as per sanctioned plan in which 50 percent trees will be evergreen trees.
Incoming HT Electrical supply will be provided by UPPCL/NPCL via 2 Nos. 7.5 MVA Power transformers, substations, LT Panel and DG Sets of Nos X 1010 KVA as planned as per norms. Street lighting will be done using LT supply and power backup as per requirement.
Not Applicable in case of commercial project.
STP will be installed as per drawings. All sewerage will be treated waste water shall be used for landscaping green, cooling towers and flushing system.
STP is proposed at site for the required capacity and treated water shall be used for flushing and irrigation as per latest green building practices.
Rain water harvesting system with separate rain water storage tanks is being provided to conserve rain water and duel flush, Low flow Fixture and Drip/sprinklers in green areas will also be provided.
Solar System shall be provided as per requirement.
In compliance to National Building Code of India 2016 Part IV requirement , Fire Protection and Safety System provided which consists of Underground Fire Tank -3 nos 310KL each. All project sprinkler system provided in compliances to IS codes and project fire safety requirement aligned to NBC 2016 Part IV
Creche facility, Public toilets and driver toilets.
Emergency Evacuation System ( stairways, Exitways etc. ) planned in compliance to National Building Code of India 2016 Part-IV. Refuge areas also provided in compliance to NBC 2016
State of the Art Security system access control system and CCTV provided for Security and controlled access in the building.
CRC The Flagship Phase 5 is located in Noida.
Yes. CRC The Flagship Phase 5 is registered under UPRERAPRJ388326/05/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for CRC The Flagship Phase 5 is 16 November 2027.
CRC The Flagship Phase 5 is developed by IT INFRASTRUCTURE PARK PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.