BOULEVARD WALK (PHASE 4)

Gautam Buddha Nagar, Uttar Pradesh
01-09-2017
RERA Received Date
New
Type
29-03-2023
Completion Date

Overview

RERA Received Date

01-09-2017

Completion Date

29-03-2023

RERA ID

UPRERAPRJ15654

Location

Latitude

28,36',22.91''

Longitude

77,25',58.07''

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)547
Project NameBOULEVARD WALK (PHASE 4)
Registration Fee (in Rs.)10940
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)67
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-09-2017
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)1594
Proposed Completion Date29-03-2023

Bank Details

Account no.250027002929
Name Of Account HolderREGAL EMPORIA INFRATECH PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR BOULEVARD WALK PHASE-04
Bank NameINDUSIND BANK LIMITED
Branch AddressSECTOR-18, NOIDA, UP-201301
Branch NameINDUSIND BANK, SECTOR-18, NOIDA BRANCH
IFSC CodeINDB0000036

Development Works

Demarcation of Plots

AS PER PLAN

Boundary Wall

AS PER PLAN

Road Work

AS PER PLAN

Footpaths

AS PER PLAN

Water Supply Including Drinking Water Facilities

Since municipal water supply may not be expected to fulfill the entire requirement, it is proposed to meet the total water requirement for the campus by other source/external supply such as bore wells etc. Water shall be passed through a multi grade filter, softened and chlorinated prior to the supply to the buildings

Sewer System

Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid underground with manhole & connected to Centralized STP

Drain

Separate line for rain water with Harvesting pit & Other line for soil & waste and connected to STO

Parks

AS PER PLAN

Tree Planting

AS PER PLAN

Design For Electric Supply Including Street Lighting

Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .

Community Buildings

AS PER PLAN

Treatment and Disposal System of Sewage and Sullage water

Sewer water treatment through Centralized STP with their disposal arrangement

Solid Waste Management And Disposal System

AS PER PLAN

Water Conservation System

VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture

Energy Management System Including Use of Renewable Energy

VFD based Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy

Fire Protection And Fire Safety System

Internal & external hydrant system , sprinkler ,Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms

Social Infrastructure And Other Public Amenities Including Public Health Services

AS PER PLAN

Emergency Evacuation Services

AS PER PLAN

Other Miscellaneous Work

AS PER PLAN

Documents

Lease Deed

No: 20074 | Date: 19-10-2012

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 31-07-2018

Legal Document of Agreement in Case of other Land

Uploaded: 06-04-2018

Authentic copy of Approval of Project

Uploaded: 06-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 06-04-2018

Permits

Orignal Permit NoBP-3246/COM/FS8239
Orignal Permit Date22-10-2014
Valid Upto21-10-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-10-2024
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)MONTE CARLO LTD
Contractor AddressMONTE CARLO LTD, 706,SHILPI BUILDING, NEAR MUNICIPAL MARKET,C.G. ROAD,NAVRANGPURA, AHMEDABAD-380009, GUJARAT
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE. INTERIOR. ENVIRONMENTAL PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator) 9811265215

Land Details

AFS

Showing 1 blocks with 28 units

Property Summary

Total Carpet Area

3223.68

34699.37 ft²

Total Units

36

1 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.55
Balconies:0
Parking ratio:0.00 per unit

Block MULTIPLEX

28 units

Khasra Details

Total Area

547.00

5887.85 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-02
Area(In Sq. Mt.)547

Other Details

Contractor Name (if any)MONTE CARLO LTD
Contractor AddressMONTE CARLO LTD, 706,SHILPI BUILDING, NEAR MUNICIPAL MARKET,C.G. ROAD,NAVRANGPURA, AHMEDABAD-380009, GUJARAT
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE. INTERIOR. ENVIRONMENTAL PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator) 9811265215