NUMBER OF PLOTS -01, SIZE PER PLOT -20235 SQM, TOTAL AREA DEMARCATED -20235 SQM, METHOD OF DEMARCATION -BY TOTAL STATION, AERIAL SURVEY AND BY YEIDA AUTHORIZED AGENCY.
BOUNDARY WALL LENGTH-580.77M, HEIGHT-2.10M, MATERIAL USED RCC+BRICK+MILD STEEL, TYPE-BRICK +RCC+FENCING.
TOTAL ROAD LENGTH-513.73M AND WIDTH 7.50M, NUMBER OF LANES-01, TYPE OF PAVEMENT-RIGID, DRAINAGE-SURFACE DRAINS, SURFACE DURABILITY-TREMIX/ VDF CONCRETE BROOM FINISHED/PAVER BLOCKS/COBBLE STONES ON TOP.
NA
N. OF WATER CONNECTION-ONE, TANK CAP.840KLD (-570 KLD+ WATER TANK-270 KLD), HYDRANTS-200, SOURCE OF WATER -MUNICIPAL, TREATMENT METHOD-FILTRATION SYSTEM AND COMPLIANCE AS PER IS 10500
LENGTH-400M, DIA 250MM, MANHOLES 21, TYPE OF GRAVITY , MATRIAL-SN44 AND METHOD -AS PER MANNING FORMULA.
LENGTH- 600M, DIA 250MM, 300.MM AND 400 MM , MANHOLES 38, TYPE OF GRAVITY , MATRIAL -SN4 AND METHOD-AS PER MANNING FORMULA , DISPOSAL METHOD-RWH AND OVER FLOW TO MUNICIPAL DRAIN
AREA-10895.96 SQM, NUMBER OF TREES /PLANTS-160 NOS.
NUMBER OF TREES -160 NOS, TYPE/SPECIES- TABEBUIA ARGENTEA AND LAGERSTROEMIA FLOSRGINAE, SPACING -01 TREE PER 100 SQM OF OPEN AREA-MAINTENANCE PLAN-REGULAR MAINTENANCE BY GARDNER
30 NOS LIGHT POLE WITH LED LIGHT FIXTURE, TRANSFORMER (CSS) 2 X 1000+1X 1600 KVA
NUMBER -01, AREA PER BUILDING -2575.79 SQM, CONSTRUCTION TYPE-RCC FRAMED WITH GLAZED FACADE, FACILITIES-HALL + GYM
STP CAP 370 KLD UNITS-ONE , TYPE OF STP- MBBR, TREATED WATER USE-IRRIGATION AND FLUSHING WATER.
TOTAL 1.41 TPD (BIODEGRADABLE 0.66 TPD + NON-BIODEGRADABLE 0.75 TPD) MUNICIPAL SOLID WASTES GENERATED FROM THE PROJECT. THE WASTE WILL BE SEGREGATED INTO BIODEGRADABLE WASTE, NON-BIODEGRADABLE WASTE, PLASTIC WASTE , DOMESTIC HAZARDOUS WASTE AND HORTICULTURE WASTE IN SEPARATE BINS AS PER SOLID WASTE MANAGEMENT RULES, 2016. TH E BILDEGRADABLE WASTES WILL BE COMPOSTED IN ONSITE COMPOSTING UNIT AND THE MANURE WILL BE USED FOR LANDSCAPING. THE SEGREGATED NON-BIODEGRADABLE /RECYCLABLE WASTE WILL BE DISPOSED THROUGH AUTHORIZED VENDORS AS PER LOCAL NORMS.
RWH-05, SIZE -DESILTING TANK-2.5 x 1.75x 2.0m RECHARGE PIT -3.5x 1.75x 2.0m and AUTOMATIC RECHARGE AND EFFICIENT AS PER SOIL CONDITION.
23 KW SOLAR PLANT , 46 NOS OF SOLAR PANEL, DG SET 1x 1010+ 2 x 500 KVA.
HYDRANTS-200. FIRE PROTECTION AS PER CODE AND NBC. A COMPLETE FIRE SAFETY SYSTEM WITH A-GRADE MATERIALS WILL BE INSTALLED AS SPECIFIED IN THE UPFES GUIDELINES ,
NA
ALL EMERGENCY EVACUATIONSERVICES HAVE BEENARRANGED AS PER THE REQUREDNORMS, FIRE STAIRSCASE PROVIDED AS PER GUIDELINES OF (UPFES ) AND ALL THE GUIDELINES WILL BE STRICTLY FOLLOWED.
NA
No: CHALLAN INSTALLMENT PAID TO AUTHORITY | Date:
Showing 23 blocks with 502 units
Total Carpet Area
48639.67 m²
523552.54 ft²
Total Units
502
3 different types
Blocks & Floors
23
26 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20235.00 m²
217807.52 ft²