Project Size
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Launch Price
Current Price
RERA ID
28.1905
77.3154
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupShowing 23 blocks with 502 units
Total Carpet Area
48639.67 m²
523552.54 ft²
Total Units
502
3 different types
Blocks & Floors
23
26 floors across all blocks
Parking
0
0 garages, 0 open
No: CHALLAN INSTALLMENT PAID TO AUTHORITY | Date:
Total Area
20235.00 m²
217807.52 ft²
NUMBER OF PLOTS -01, SIZE PER PLOT -20235 SQM, TOTAL AREA DEMARCATED -20235 SQM, METHOD OF DEMARCATION -BY TOTAL STATION, AERIAL SURVEY AND BY YEIDA AUTHORIZED AGENCY.
BOUNDARY WALL LENGTH-580.77M, HEIGHT-2.10M, MATERIAL USED RCC+BRICK+MILD STEEL, TYPE-BRICK +RCC+FENCING.
TOTAL ROAD LENGTH-513.73M AND WIDTH 7.50M, NUMBER OF LANES-01, TYPE OF PAVEMENT-RIGID, DRAINAGE-SURFACE DRAINS, SURFACE DURABILITY-TREMIX/ VDF CONCRETE BROOM FINISHED/PAVER BLOCKS/COBBLE STONES ON TOP.
NA
N. OF WATER CONNECTION-ONE, TANK CAP.840KLD (-570 KLD+ WATER TANK-270 KLD), HYDRANTS-200, SOURCE OF WATER -MUNICIPAL, TREATMENT METHOD-FILTRATION SYSTEM AND COMPLIANCE AS PER IS 10500
LENGTH-400M, DIA 250MM, MANHOLES 21, TYPE OF GRAVITY , MATRIAL-SN44 AND METHOD -AS PER MANNING FORMULA.
LENGTH- 600M, DIA 250MM, 300.MM AND 400 MM , MANHOLES 38, TYPE OF GRAVITY , MATRIAL -SN4 AND METHOD-AS PER MANNING FORMULA , DISPOSAL METHOD-RWH AND OVER FLOW TO MUNICIPAL DRAIN
AREA-10895.96 SQM, NUMBER OF TREES /PLANTS-160 NOS.
NUMBER OF TREES -160 NOS, TYPE/SPECIES- TABEBUIA ARGENTEA AND LAGERSTROEMIA FLOSRGINAE, SPACING -01 TREE PER 100 SQM OF OPEN AREA-MAINTENANCE PLAN-REGULAR MAINTENANCE BY GARDNER
30 NOS LIGHT POLE WITH LED LIGHT FIXTURE, TRANSFORMER (CSS) 2 X 1000+1X 1600 KVA
NUMBER -01, AREA PER BUILDING -2575.79 SQM, CONSTRUCTION TYPE-RCC FRAMED WITH GLAZED FACADE, FACILITIES-HALL + GYM
STP CAP 370 KLD UNITS-ONE , TYPE OF STP- MBBR, TREATED WATER USE-IRRIGATION AND FLUSHING WATER.
TOTAL 1.41 TPD (BIODEGRADABLE 0.66 TPD + NON-BIODEGRADABLE 0.75 TPD) MUNICIPAL SOLID WASTES GENERATED FROM THE PROJECT. THE WASTE WILL BE SEGREGATED INTO BIODEGRADABLE WASTE, NON-BIODEGRADABLE WASTE, PLASTIC WASTE , DOMESTIC HAZARDOUS WASTE AND HORTICULTURE WASTE IN SEPARATE BINS AS PER SOLID WASTE MANAGEMENT RULES, 2016. TH E BILDEGRADABLE WASTES WILL BE COMPOSTED IN ONSITE COMPOSTING UNIT AND THE MANURE WILL BE USED FOR LANDSCAPING. THE SEGREGATED NON-BIODEGRADABLE /RECYCLABLE WASTE WILL BE DISPOSED THROUGH AUTHORIZED VENDORS AS PER LOCAL NORMS.
RWH-05, SIZE -DESILTING TANK-2.5 x 1.75x 2.0m RECHARGE PIT -3.5x 1.75x 2.0m and AUTOMATIC RECHARGE AND EFFICIENT AS PER SOIL CONDITION.
23 KW SOLAR PLANT , 46 NOS OF SOLAR PANEL, DG SET 1x 1010+ 2 x 500 KVA.
HYDRANTS-200. FIRE PROTECTION AS PER CODE AND NBC. A COMPLETE FIRE SAFETY SYSTEM WITH A-GRADE MATERIALS WILL BE INSTALLED AS SPECIFIED IN THE UPFES GUIDELINES ,
NA
ALL EMERGENCY EVACUATIONSERVICES HAVE BEENARRANGED AS PER THE REQUREDNORMS, FIRE STAIRSCASE PROVIDED AS PER GUIDELINES OF (UPFES ) AND ALL THE GUIDELINES WILL BE STRICTLY FOLLOWED.
NA