Projects site is located in Sector-151 Noida (Corner Plot), 20050sqm area, 1 Plot. As per site plan and possession letter.
587 Mtr, 2.4m height, material used; type (brick, RCC, fencing), brick and RCC appearance - as per elevation, safety features- CCTV
Total Road Length- 530 mts and width - 7 mtr, number of lanes - 2 way; type of pavement - rcc/ pavers, rainage - along roag, surface durability - As per Fire tender movement.
Length, width , number of crossings; material used, accessibility, safety design - as per site plan and landscape plan.
Number of water connections, tank capicity, hydrants; source of water, treatment method, compilance with quality standards. Connections - Underground Water tank capicity - 2 Nos. of Fire water tank (184KL + 574 KL = 759 KL, 2 Nos. of Domestic Water Tank (133 KL + 133 KL = 266 Kl), Source of Water Supply - Municipal Water Supply, Water Treatment Method - Dual Media and Activated carbon Filters, Innternal and External Hydrants - Yes Both Provided, Compilance with quality standards - Yes
Length of sewer lines, pipe size, manholes; type(gravity/pressure), material used, network design - Total length of sewage pipe - Approx. 410m, Proposed the manholes and Gully trap location on site plan, All verticals sewer pipes are directly connected to Gully trap manholes, After manhole connection all sewage flow are drain into the STP. The starting pipe size of manhole to manhole connection is 200mm Dia and ending pipe dia for STO connection is approx. 300mm
Length, width, number of open/covered drains; type(storm/surface), material, disposal method - Total Length of storm pipe - Approx. 550m, and also Proposed the storm manholes and Catch basin locations on site plan for storm water drains, All Vertical storm pipes are directly connect to manholes, After manhole connection storm water drain connected to the rain water harvestinf pits (Location MArks on the site plan ) . Overflow from rain harvesting pits is directly connected into External minicipal drain Line. The starting pipe size of manhole-to-manhole connection is 200,, dia and ending pipe dia is approx. 350mm.
Area, number of parks, number of trees/plamts; landscaping features, types of parks, public amenities - as per landscape plan
Number of trees, types/species, spacing; native/exotic trees, maintainance plan- as per landscape plan
Number of poles, lights, transformer units; type of lighting(LED/solar), illumination design - Number of external poles/lights -Approx. 42 Nos, Transformer units - 5 Nos, out of total 5 Nos., 3 Nos. each of 1250 KVA for apartments and common area, and 2 Nos. each of 1000 KVA for EV Charging, Type of lighting (LED/solar) - LED, Illumination design - Yes as per norms
Number, area per building, capacity; purpose (hall,creche), construction type, facilities - as per community building plan.
STP capacity (KLD), number of treatment units, type of STP, treated water use, and regulatory compliance. STP Capacity (KLD) - 375 KLD, Number of Treatment units - 1 No, Type of STP - MBBR System, Treatment Water use - Flushing Water Supply, Horticulture, Regulatory - Yes as per norms
Estimated waste )kg/day), number of bins/collection ponts; segregation, composting/recycling, collection method. Waste GEnerated (Kg/Day) - 519 Kg/day (Organic waste) + 778 kg/day (Inorganic wate) = (1297 Kg/Day) Total Waste Generated
Number and size of harvesting pits, recharge wells; water-efficient fixtures, reuse/recharge strategy, system efficiency Number and size of harvesting pits - 5Nos. of pits and approx. 49.13m3 capacity of each pits, Recharge wells - yes provided, water efficient fixtures - Consider low flow sanitary fixtures, Reuse/recharge strategy - RAin water will be used for ground water recharge,system efficiency - As per norms
(Renewable Energy) Solar capacity (kW), number of panels; type of renewable energy used, grid integration, backup provisions Online Solar power system of capacity 40 KW.
Number of hydrants, fire exits, sprinklers; system type (manual/automatic), NBC compilance, fire safety tarining Number of hydrants - 12 Nos. of External Hydrants, and more than 100 internal hydrants, Sprinklers System (Manual/Automatic) - Automatic with standby sprimklers system, NBC compilance - Yes, Fire safety training - Will be provided at the time of occupancy
Number/area of amenities (toilets,health units) ; type of services offered, inclusiveness, accessibilty - as per applicable norms
Number of evacuation points, roads widths, signage count; route paln. safety measures, public awareness system - As per NBC 2016
Work based on the nature of work 9e.g., number of CCTV units, benches); beautification efforts, signange, asthetic and utility elements - beautification efforts, signage, asthetic and utility elemrnts CCTV proposed as per project requirement.
Showing 3 blocks with 214 units
Total Carpet Area
57741.37 m²
621522.33 ft²
Total Units
457
5 different types
Blocks & Floors
3
42 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20050.00 m²
215816.19 ft²