Launch Date
Completion Date
Project Size
Total Floors
RERA ID
28.4182800232
77.48763798
Demarcation done.
R.C.C Brick work structure with MS railing with Plaster Finish and paint, as per plan
Well developed 15 mtr approach road at entrance, internal roads are 7 mtr wide. internal roads are concrete road with trimix flooring on WBM.
Granite stone, grass paver cobbles to be used in pathway and footpaths.
water supply connection shall be taken from noida jal board, further distribution from under ground water tank to overhead tank by pump from there to individual units.
Sewer system is laid inside the plot as per plan, wastewater/ sewer system to individual units/ further connected to STP excess treated water used in flushing and horticulture and left over water shall be disposed to authority drain.
Dain system with RCC NP2 pipes connected to rain water harvesting pit excess rain water disposal in authority drain.
Green area are planned.
Seasonal and evergreen tree shall be planted.
Electricity connection shall be taken from UPPCL than distribution shall be done through smart metering system
NA(not in this phase)
Sewage will be treated through sewage treatment plant, excess treated water shall be used in flushing and horticulture left over water shall be disposed in authority drain.
Door to Door collection is planned. Garbage will be collected for garbage room from there non biodegradable waste given to the authorized vendor for recycling and biodegradable waste will be treated in organic waste convertor machine and compost will be used for horticulture work.
Rain water harvesting pits are planned (as per approved plan) and used as manhole in horticulture.
Smart metering system is proposed, soar plant for emergency lighting in common area is proposed,
Automatic fire detection and alarm system is proposed. One response indicator shall also be mounted outside every apartment. Addressable control module shall be provided, automatic switching on smoke extraction fans and pressurized fans.
Cricket ground with automatic irrigation system is constructed at site.
Fire staircase fire exit door planned, 6mtr wide fire tender path planned for circulation in any emergency,
As per requirement.
Showing 3 blocks with 69 units
Total Carpet Area
20299.56 m²
218502.43 ft²
Total Units
264
1 different types
Blocks & Floors
3
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
80857.00 m²
870336.66 ft²