Launch Date
Completion Date
Project Size
Total Floors
RERA ID
28.418280023285763
77.48763797780258
Done
R.C.C. & Brick work structure with MS railing & with Plaster Finish & paint , As Per plan
Tremix flooring over WBM as shown in plan
Ploycrete with granite bend on Border as per plan
Water supply through noida , further distribution through overhead tank underground tank with pumps to individual units
Sewer system is laid inside thee plot as per plan dual wastewater /sewer system to individual units /further connected 50 STP/excess treated water disposed in excess rain water is disposed in authority drain
Drain system with RCC NP2 pipes connected to rain water harvesting pit excess rain water disposed in authority drain
No parks are planned green area above basement roof planned
As per horticulture plan approved by authority
Electrical supply as per scheme approval
Club Building proposed
Sewage is treated through sewage treatment plant , excess treated water is disposed in authority drain, Rest used in flushing water & horticulture ,Drainage As above
Door to Door /Garbage chute collection is planned ,Garbage will be collected in garbage room from there non biodegradable waste given to authorized vendor for recycling & biodegradable waste will be treated in compost machine and this compost will be used in horticulture work .
Rain harvesting pits are planned (as required ) and used as manhole in horticulture
Solar heaters and solar photovoltaic are planned on roof
Fire fighting system planned as per fire scheme approval
NA
As per Fire Scheme
NA
Showing 6 blocks with 180 units
Total Carpet Area
41004.17 m²
441364.79 ft²
Total Units
575
2 different types
Blocks & Floors
6
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
80857.00 m²
870336.66 ft²