NewActive

Godrej Palm Retreat 2

Gautam Buddha Nagar, Uttar Pradesh
01-09-2020
Launch Date
New
Type
30-12-2025
Completion Date

Overview

Launch Date

01-09-2020

Completion Date

30-12-2025

RERA ID

UPRERAPRJ124632

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12750
Project NameGodrej Palm Retreat 2
Registration Fee (in Rs.)69000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)64
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-09-2020
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)26925
Proposed Completion Date30-12-2025

Location

Latitude

28.433467

Longitude

77.484604

Bank Details

Account no. 777705800084
Name Of Account HolderGodrej ACE 150 Phase 2 70 Account
Bank Nameicici bank
Branch AddressICICI Bank Ltd, SCO 31, Sector 18, Udyog Vihar, Gurgaon
Branch NameUdyog Vihar, Sector 18, Udyog Vihar, Gurgaon
IFSC CodeICIC0006615

Development Works

Demarcation of Plots

As per Approved Master Plan

Boundary Wall

As per Approved Master Plan

Road Work

As per Approved Master Plan

Footpaths

As per Approved Master Plan

Water Supply Including Drinking Water Facilities

Noida Authority shall provide water supply to the entire society further water will be treated and supplied at  customer premise through piping and pumping  for domestic use.

Sewer System

Centralized STP to treat the Sewerage and every tower has its own down comers connected to mail sewerage line.

Drain

Centralized STP to treat the Sewerage and every tower has its own down comers connected to mail sewerage line.

Parks

As per Approved Master Plan.

Tree Planting

As per Approved Master Plan

Design For Electric Supply Including Street Lighting

Single feeder shall be taken from UPPCL and connected to central substation  and entire project shall have street lighting with timer control.

Community Buildings

provided as per plan

Treatment and Disposal System of Sewage and Sullage water

Central STP for entire project and all towers shall be connected to STP.

Solid Waste Management And Disposal System

Project shall have waste segregation area and OWC for treatment of organic waste.

Water Conservation System

Adequate no of  Recharge pits shall be made.

Energy Management System Including Use of Renewable Energy

"LED lights and timer control panes shall be used for efficient energy management/ Solar power cells of 60 KW planned in entire 100 ACRE mainly shall be connected to common gird.

Fire Protection And Fire Safety System

Fire alarm system provided only for the building height above 60 mtr.

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Approved Master Plan.

Emergency Evacuation Services

Every high-rise have its own fire staircase.

Other Miscellaneous Work

As per Approved Master Plan.

Documents

Lease Deed

No: 2411 | Date: 07-04-2015

Lease Deed

No: 2411 | Date: 07-04-2015

Details of Encumbrances

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 06-06-2019

Commencement Certificate

Uploaded: 30-05-2019

Other Plan(If Any)

Uploaded: 30-05-2019

Proforma of Application Form

Uploaded: 23-05-2019

Proforma of Allotment Letter

Uploaded: 23-05-2019

Proforma of Conveyance Deed

Uploaded: 06-06-2019

Waste Disposal Plan

Uploaded: 30-05-2019

Water Supply Plan

Uploaded: 30-05-2019

Electricity Supply Plan

Uploaded: 30-05-2019

Development Work Plan

Uploaded: 30-05-2019

Affidavit

Uploaded: 06-06-2019

CA CERTIFICATE

Uploaded: 06-06-2019

Permits

Orignal Permit NoNoida/MU.VA.NI/2019/IV-1485/1121
Orignal Permit Date15-05-2019
Valid Upto14-05-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto13-05-2029
End Date30-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Ace Mega Structures Private Limited
Contractor Address8th Floor, Plot No. 01/B, Sector-126, Gautam Budh Nagar, Noida-201303, UP
Architect NameAkshay Garg
Architect AddressFlat No-38, Samachar Apartments, Mayur Vihar, Phase-1 Extension, Delhi-110091.
Architect Licence NumberCA/92/14746
Structural Engineer NameMs. Madhura Manjrekar
Structural Engineer AddressAddress: Keshava Building, Shop No. 610, Bandra Kurla Complex Road, Near Family Court, E Block BKC, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051
Mobile number(Project Co-ordinator)8800010790

Land Details

AFS

Showing 5 blocks with 90 units

Property Summary

Total Carpet Area

24630.53

265120.56 ft²

Total Units

211

5 different types

Blocks & Floors

5

27 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:116.73
Balconies:309
Parking ratio:0.00 per unit

Block TOWER C1

8 units

Block TOWER C3

8 units

Block TOWER C4

16 units

Block TOWER C5

8 units

Block TOWER ICONIC C2

50 units

Khasra Details

Total Area

58064.00

624995.09 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-02/F
Area(In Sq. Mt.)58064

Other Details

Contractor Name (if any)Ace Mega Structures Private Limited
Contractor Address8th Floor, Plot No. 01/B, Sector-126, Gautam Budh Nagar, Noida-201303, UP
Architect NameAkshay Garg
Architect AddressFlat No-38, Samachar Apartments, Mayur Vihar, Phase-1 Extension, Delhi-110091.
Architect Licence NumberCA/92/14746
Structural Engineer NameMs. Madhura Manjrekar
Structural Engineer AddressAddress: Keshava Building, Shop No. 610, Bandra Kurla Complex Road, Near Family Court, E Block BKC, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051
Mobile number(Project Co-ordinator)8800010790