Launch Date
Completion Date
Configurations
Sizes
Project Size
Total Floors
RERA ID
28.165969
77.325496
Plot area 41,252.32 Sqm Attached layout plan As Annexure -1 North-east - Others Property South-east - Others Property South-west - 45.0 Mt wide Road North-west - Others Property
Combination of M.S railing and R.C.C wall. Thickness of boundary wall 300 mm and height of boundary wall 2100 mm.
Yes, concrete road/concrete Pavers with Kerb stone on edge. As per Architect Design.
Yes, Footpath and walkway path designs will be provided, and all designs will be developed in accordance with the landscape consultants specifications and recommendations like 20 MM to 60 MM pawers etc.
Yes, The water supply will be collected in underground water reservoirs/Tanks, and Terrace tanks will be filled through a pumping system. (As per Authority). UPVC/CPVC/GI pipe 15 MM to 80 MM as per design requirement.
Yes, The soil and waste from toilets and kitchen will be collected in pipes / laid underground having Manholes/ Inspection Chambers at appropriate intervals. It is proposed to install sewage treatment plant on the site for treatment of sewage. The quantity of recycle water required in flushing, horticulture be treated up to tertiary level and the balance waste shall be discharged into municipal drainage system after the treatment. The total capacity of sewage treatment plant will be as per consultant around 690 kld. Hence sewage treatment plant shall be installed in various modules as per the growth of population. In this system, the entire civil work will be done at present, but the electro mechanical equipment will be installed for only will be installed as per population growth.
Yes, stormwater will be collected in the R.W.H. (Rain Water Harvesting) having 6 pits, 1 pit of 21 cum. for groundwater recharge, and after percolation, the overflow water will be discharged into the municipal storm- water drainage system. (As per drawings by the consultant)
Yes, Park designs with plants, water body and shrubs will be developed in accordance with the landscape consultants specifications and recommendations. Along with electrical pole of height 3 to 6 meters placed as per consultant.
Yes, as per the landscape consultants design. Around 401 trees.
Yes, The building shall be supplied power by the State Electricity Board (NPCL). Since the source is unstable due to frequent brown out/ black out, it is proposed that DG power backup shall be provided to all the common services / Commercial Development / 4BHK and back up will be provided to 3BHK apartments with as per divercity factor. Some critical load such as emergency lighting, headed equipment of ELV system etc., shall be additionally backed up using UPS (Battery backup) system. Transformer capacity of 1600 kva.
Yes, the project is provided with facilities such as a banquet hall, swimming pool, gym, yoga area, sports hall, and other related amenities.
The Treatment scheme is aerobic biological aeration treatment using the fluidized media process. The process is named as Moving Bed Bio Reactor (MBBR). Excess aerobic biological sludge generated will be thickened in the aerobic digester cum thickener tank. STP capicity of 690 kld. The treatment scheme proposed is split into three distinct parts 1. Pre-treatment, which comprises of screening, oil and grease trap. 2. Biological treatment comprising of fluidized media aeration followed by clarification. 3. Tertiary treatment comprising of dual media pressure filtration, activated carbon filtration and disinfection system etc.
Yes, solid waste will be managed by installing an organic waste converter and though segregation of waste at the household level. 400 kg of waste per day will be recycled.
Yes, Water Conservation will be provided using low flow fixtures / flow restrictors etc. RWH of 6 nos.
Solar power system is a renewable energy system, converting the sunlight into electricity by using photovoltaic cells. The light is coverted into electricity by the use of photovoltaic effect. Solar panel shall be installed at the roof of building. Shadow free area shall be provided for the installation for the system at roof top. The solar cells shall face South direction to ensure direct exposure to sun rays. Solar capicity of 55 kwh (solar pv) Solar Plant shall comprise of the following. 1. The solar module to convert sunlight into DC electricity. 2. Using Grid Interactive Inverter (UNIT) to convert DC to AC and directly coupled with Grid Bus in Panel. 3. Further, load shall directly be connected to main bus of the panel.
As per sanctioned drawing by Fire Department, all provisions with fire pumps, sprinkler, yard hydrant, and automatic alarm systems required for a high-rise building shall be provided. External hydrant are 25 nos. and internal hydrant are 300 nos.
Toilets for disabled and visitors will be provided on the ground floor of every tower. Sports facilities will be provided as per the landscape plan.
Refuge terraces are required for buildings above 60 m in height. Accordingly, refuge terraces have been provided in every block, along with a dedicated fire- tender path around each tower. (as per sanction plan). Tower A - Refuge areas are provided. Towers B2 - Refuge areas are provided. Tower C1 to C3 - Refuge areas are provided. Tower D3 to D6 - Refuge areas are provided. Balconies in every apartment. A continuous fire-tender path is also provided around each tower for emergency access.
Guard room, entrance and exit gates, maintenance room, Retail Shops facility, CCTV, calling facility, and security guards for proper watch and ward.
Showing 10 blocks with 279 units
Total Carpet Area
112041.06 m²
1205998.77 ft²
Total Units
1043
6 different types
Blocks & Floors
10
31 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
42957.00 m²
462384.85 ft²