RERA Received Date
Completion Date
Land Area
Project Size
Total Floors
RERA ID
28.329156
77.546919
The plot will be demarcated as per the sanction and survey drawings.
A boundary wall of RCC/ brick with plaster and railing will be prepared.
Access road to all towers will be provided and the road will be designed to take up live load as per approvals and NBC.
Designed footpath in the central green as walkway and logging track.
YEIDA authority shall supply water for the entire society and it shell be treated and pumped to all the houses.
Centralised STP to treat the sewage will be designed and provided.
Rain water drains will be provided as per the design.
Beautiful parks will be made for the visitors.
As per approved building plan, apt no of trees will be provided.
Power supply from electricity board and street lighting as per approved building plan.
Community spaces will be made as per approved building plan.
Centralised STP to treat the sewage.
Collection, storage and disposal will be done as per sanctions and NBC.
Rain water harvesting system is being provided to conserve rain water and dual flush system will also be provided with water saving fittings.
Usage of LED lights will be used all over the project and use of solar lights will also be explored.
As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detectors and fire alarm.
Social gathering places in the project are being provided.
As per approved building plan and fire approvals, fire staircase are being provided.
As per approved building plans.
No: Sanction Drawing_Site Plan & Area Statement and Basement | Date: 24-12-2024
Showing 1 blocks with 238 units
Total Carpet Area
26336.53 m²
283483.78 ft²
Total Units
898
3 different types
Blocks & Floors
1
19 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20243.00 m²
217893.63 ft²