Launch Date
Completion Date
RERA ID
28.3264000
77.54799000
The Plot area will be demarcated as per the sanction, survey, and Lease plan.
The Boundary wall will be done in RCC/Brick with plaster and railings will be provided.
All sections of roads will be finished by Trimix/pavers/cobbles and will be done as per the slope of the project.
All footpaths will be designed according to the sanction and the By-laws and will be finished properly.
YEIDA will provide a water supply for the complete master plan. The water will be pumped from the UGT to all the units as per the requirements and the Norms.
Centralized STP for the whole project will be installed as per the norms and all the sewerage will be treated with.
All the rainwater drains will be designed to carry the rainwater in a ring line and to effectively drain the rainwater.
Beautiful parks for the enjoyment of users and residents will be developed for the social well-being of the residents. Special areas for kids, juniors, elders, and youth will be provided.
A mixture of flooring and ornamental, shaded trees will be provided.
Streetlights will be designed to take care of common area lighting and provide ambient as well as lighting for easy driving and walking across the roads during the night time.
Community buildings will be designed and planned in the best possible way to provide social and entertainment areas for the residents.
The total sewage and sullage will be treated for the whole masterplan and the recycled water will be used for irrigation purposes.
Total solid waste will be collected in a segregated manner and the plastic and water will be dual recycled in the best possible way.
Water conservation will be the theme of the project. Not even since the drop of water is to be wasted for the complete project.
An energy management system will be designed and implemented in the project in the best possible way and every point will be taken care of.
A fire system is to be installed in each building by the end users and the residents will be guided to follow all the fire norms for the future as per the fire approvals. All fire NOC guidelines will be followed in the Master Plan.
Parks, community buildings, institutional plots, and green areas are the part of social infrastructure of the masterplan and the same will be implemented in the best possible ways.
Emergency evacuation is done through the roads and the right of way of the roads is designed as per the approvals as per the norms.
All the work for the beautification and working of the projects will be done as per the best practices, Authority bye laws and NBC guidelines.
Total Area
404860.60 m²
4357879.01 ft²