Launch Date
Completion Date
RERA ID
28,36',22.91''
77,25',58.07''
AS PER PLAN
AS PER PLAN
AS PER PLAN
AS PER PLAN
Since municipal water supply may not be expected to fulfill the entire requirement, it is proposed to meet the total water requirement for the campus by other source/external supply such as bore wells etc. Water shall be passed through a multi grade filter, softened and chlorinated prior to the supply to the buildings
Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid underground with manhole & connected to Centralized STP
Separate line for rain water with Harvesting pit & Other line for soil & waste and connected to STO
AS PER PLAN
AS PER PLAN
Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .
AS PER PLAN
Sewer water treatment through Centralized STP with their disposal arrangement
AS PER PLAN
VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture
VFD based Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy
Internal & external hydrant system , sprinkler ,Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms
AS PER PLAN
AS PER PLAN
AS PER PLAN
Showing 1 blocks with 554 units
Total Carpet Area
13945.17 m²
150104.42 ft²
Total Units
695
1 different types
Blocks & Floors
1
32 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4035.00 m²
43432.34 ft²