OngoingActive

BOULEVARD WALK (PHASE 2)

Gautam Buddha Nagar, Uttar Pradesh
22-10-2014
Launch Date
Ongoing
Type
29-09-2023
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

29-09-2023

RERA ID

UPRERAPRJ7295

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)4035
Project NameBOULEVARD WALK (PHASE 2)
Registration Fee (in Rs.)51000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)108
DistrictGautam Buddha Nagar
Original Start Date22-10-2014
TehsilGautam Buddha Nagar
Proposed Start Date22-10-2014
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)11762
Proposed Completion Date29-09-2023

Location

Latitude

28,36',22.91''

Longitude

77,25',58.07''

Bank Details

Account no.250027003030
Name Of Account HolderREGAL EMPORIA INFRATECH PVT LTD SEPARATE BANK ACCOUNT FOR PROJECT BOULEVARD WALK (PHASE-02)
Bank NameINDUSIND BANK
Branch AddressSECTOR 18, NOIDA
Branch NameSECTOR 18
IFSC CodeINDB0000036

Development Works

Demarcation of Plots

AS PER PLAN

Boundary Wall

AS PER PLAN

Road Work

AS PER PLAN

Footpaths

AS PER PLAN

Water Supply Including Drinking Water Facilities

Since municipal water supply may not be expected to fulfill the entire requirement, it is proposed to meet the total water requirement for the campus by other source/external supply such as bore wells etc. Water shall be passed through a multi grade filter, softened and chlorinated prior to the supply to the buildings

Sewer System

Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid underground with manhole & connected to Centralized STP

Drain

Separate line for rain water with Harvesting pit & Other line for soil & waste and connected to STO

Parks

AS PER PLAN

Tree Planting

AS PER PLAN

Design For Electric Supply Including Street Lighting

Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .

Community Buildings

AS PER PLAN

Treatment and Disposal System of Sewage and Sullage water

Sewer water treatment through Centralized STP with their disposal arrangement

Solid Waste Management And Disposal System

AS PER PLAN

Water Conservation System

VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture

Energy Management System Including Use of Renewable Energy

VFD based Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy

Fire Protection And Fire Safety System

Internal & external hydrant system , sprinkler ,Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms

Social Infrastructure And Other Public Amenities Including Public Health Services

AS PER PLAN

Emergency Evacuation Services

AS PER PLAN

Other Miscellaneous Work

AS PER PLAN

Documents

Lease Deed

No: 20074 | Date: 19-10-2012

Other Plan(If Any)

Uploaded: 18-01-2021

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 31-07-2018

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Details of Encumbrances

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Proforma of Application Form

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Permits

Orignal Permit NoBP-3246/COM/FS8239
Orignal Permit Date22-10-2014
Valid Upto21-10-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-10-2024
End Date31-07-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)MONTE CARLO LTD
Contractor AddressMONTE CARLO LTD, 706,SHILPI BUILDING, NEAR MUNICIPAL MARKET,C.G. ROAD,NAVRANGPURA, AHMEDABAD-380009, GUJARAT
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE. INTERIOR. ENVIRONMENTAL PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator)9811265215

Land Details

AFS

Showing 1 blocks with 554 units

Property Summary

Total Carpet Area

13945.17 m²

150104.42 ft²

Total Units

695

1 different types

Blocks & Floors

1

32 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:20.06 m²
Balconies:0
Parking ratio:0.00 per unit

Block OFFICE

554 units

Khasra Details

Total Area

4035.00 m²

43432.34 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-02
Area(In Sq. Mt.)4035

Other Details

Contractor Name (if any)MONTE CARLO LTD
Contractor AddressMONTE CARLO LTD, 706,SHILPI BUILDING, NEAR MUNICIPAL MARKET,C.G. ROAD,NAVRANGPURA, AHMEDABAD-380009, GUJARAT
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE. INTERIOR. ENVIRONMENTAL PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator)9811265215