Have queries on this Project?
Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Current Price
RERA ID
28.650735
77.491429
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupShowing 4 blocks with 340 units
Total Carpet Area
36784.33 m²
395942.85 ft²
Total Units
483
5 different types
Blocks & Floors
4
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8701.17 m²
93658.52 ft²
PLOT NO GH-3/4, PARK TOWN , NH-24 VILLAGE-MEHRAULI SHAHPUR-BAMHETA, PARGANA-DASNA, TEHSIL, DIS-GHAZIABAD, APPROVED BY GDA .
230MM WIDE AND 2.1 METRE HIGH EARTHQUAKE RESISTANT BOUNDARY WALL OF RCC/ MILD STEEL/BRICK FILLED.
ALL ROADS IN THE PROJECT WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFERENT COLOURS, SHAPE, THICKNESS. ROAD WILL BE LAID OVER 225MM WATER BOUND MACADAM.
ALL FOOTHPATH IN THE PROJECT WILL BE IN COMBINATION OF CONCRETEPAVERS OF DIFFERENT COLOURS, SHAPE AND THICKNESS OF 65MM AND 80MM LAID OVER 150MM WATER BOUND MACADAM SURFACE.
POTABLE WATER SUPPLY FROM UGT SHALL BE COLLECTED AND PUMPED TO OVERHEAD WATER TANK.TTHE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE BE FROM THE SAIDOVERHEAD WATER TANK. TOTAL WATER TO BE CATERED BY POTABLE UNDER GROUND WATER. SUPPLIED THROUGH UNDER GROUND WATER TANK.
THE SEWAGE WILL BE COLLECTED THROUGHA SOIL PIPELINE ARRANGEMENTBENDS AND INSPECTION CHAMBERS LEADING TO THE SEWAGE WATER TREATMENT PLANT(STP) OF THE PROJECT AND TREATED WATERWILL BE USED FOR IRRIGATIONNA AND FLUSHING PURPOSE. SOIL WASTE FROM TOILET AND KITCHEN WILL BE COLLECTED SEPARATELY BY SOIL AND WASTE PIPE LINE.
DRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDEDF FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUN OFF). SEPARATE LINE FOR RAIN WATER AND OTHER LINE FOR SOIL AND WASTE LEADING TO STP.
INTERNAL PARK WILL BE PROVIDED AND MAINTAINED. THE PARKS WILL HAVE JOGGING TRACKS, CHILDREN PLAY AREA AND SITTING AREA.
THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIONSOF THE PROJECTS AND ALONG THE BOUNDARY WALLS. THE TREE SELECTION , FLORA AND VEGETATION.
ELECTRIC SUPPLY PROVIDED THROUGH 11/0.433 KV TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUP. EFFICIENT AND EFFECTIVE DESIGN OF SUBSTATION WITH 100 PERCENT POWERBACKUP AND STREET LIGHT IN WALKWAYS.
NA
SEWAGE SHALL BE TREATED IN SEWAGE TREATMENTSPLANTS 9STP) AND THEREAFTER TREATED WATER TO BE USED FOR FLUSHING AND IRRIGATION. SEWER WATER TREATMENTS THROUGH CENTRALIZED STP.
SOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STORED IN GARBAGE ROOM.RECYCLABLE SHALL BE PROCESSED IN THE COMPOST MACHINE TO MAKE....
RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUND WASTE RECHARGING AND OVERFLOW TO BE DISCHARGED IN THE DRAINS AND TRATED IN STP.BASED HYDRO PNEUMATIC PUMPS USED WITH SENSOR, TREADTED STP WATER USED FOR FLUSHING.
SINGLE POINT METERING WILL BBE THERE FOR ENERGY PURCHASED FROM THE GRID/ POWER SUPPLY COMPANY. PUMPS AND ELECTRICAL ITEMS SELECTED ON EFFICIENCY FACTOR.
SPRINKLER, FIRE DOORS , YARD HYDRANTS, SMOKE DETECTER AND FIRE ALARM SYSTEM WILL BE PROVIDED A APPLICABLE. INTERNAL AND EXTERNAL HYDRANT SYSTEM, BASEMENT SPRINKLERS, MCP AND FIRE EXTINGUISHERS.
COMMON SOCIAL INFRASTRUCTURE SHALL BE PROVIDED FOR ALL THE PHASES COMBINED.
FIRE STAIRCASES SHALL BE PROVIDED AS PER THE APPROVED FIRE DRAWING FOR EVACUATION TO OPEN AREAS.
as per project requirements
VVIP Namah is located in Aditya World City, Ghaziabad. The project is spread across 2.15 acres.
Yes. VVIP Namah is registered under UPRERAPRJ576907 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for VVIP Namah is 14 May 2028.
VVIP Namah is developed by VVIP Group.
VVIP Namah offers 3 BHK and 4 BHK configurations.
Developed by
5 Projects
EXECUTIVE SUMMARY VVIP Group operates through its primary real estate entity, Vibhor Vaibhav Infrahome Private Limited, incorporated in December 2007 and headquartered in Raj Nagar Extension, Ghaziabad, Uttar Pradesh. Th…
Know More about VVIP Group