Have queries on this Project?
28.7072413
77.4325589
Showing 1 blocks with 268 units
Total Carpet Area
10096.38 m²
108676.42 ft²
Total Units
472
2 different types
Blocks & Floors
1
18 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4082.56 m²
43944.27 ft²
OUTER SITE BOUNDARY WITH PRECAST BOUNDARY WALL WITH 150x150x2700mm HIGH COLUMNS AND PANELS OF SIZE 2100x300x50MM, BOTH OF M30GRADE. COLUMNS AND PANELS BOTH WILL BE REINFORCED WITH 4MM DIA OF HIGH CARBON HTPS WIRE. PRECAST CONCRETE COLUMNS IS TO BE EMBEDDED INTO CEMENT CONCRETE COLUMN.
LENGTH 278.72M , HEIGHT-2.4M, MATERIAL USED-RCC,BRICK,STONE, METAL,TYPE(BRICK,RCC , FENCING) RCC WALL/ COLOUMN AND BRICK WORK AS PER DRAWINGS
12MTR BLACKTOP ROAD WORK WITH WBM AND BITUMINS CONCRETE ROAD AS PER CPWD SPECIFICATION. THE ROAD SHALL BE MADE AFTER COMPACTING THE EARTH TO THE REUISITE DENSITY.
FOOTHPATHS WILL BE MADE OF INTERLOCKING PAVERS OF 100x200mm AND 200x200MM AND 50mm THICKNESS HAVING M3 GRADE CONCRETE.
NO OF WATER CONNECTION 01, TAN CAPACITY 450KLD, NO OF HYDRANTS 34, SOURCE OF WATER MUNICIPAL, TREATMWNT METHOD-FIILTRATION METHOD, COMPLIANCE WITH QUALITY STANDARDS -YES
LENGTH OF SEWER LINE 130M, PIPE SIZE 150 DIA, DESIGN- MANNING FORMULA, GRAVITY SYSTEM NETWORK PROVIDED.MAIN SEWER LINE HAS BEEN DESIGNED ASPER NORMS AND PARTIALLY LAY IN BASEMENT CEILING AND WILL FINALLY CONNECT TO STP.
LENGTH OF DRAIN 180M, WIDTH 300MM AND 200MM, DIA TYPE-STORM/SURFACE, MANNING FORMULA/ DISPOSAL MEHTHOD UNDERGROUND PIPE DRAIN WITH CHAMBER
233.973 SQM GREEN AREA IN PARKS AND OTHER DIFFERENT PLACES, 46 TREES AND OTHER LANDSCAPING FEATURES LIKE BENCHES, LIGHT ETC. LANDSCAPE AND TREE PLANTING HAS BEEN DESIGNED AS PER AUTHORITY GUIDELINES
46 TREES, TYPE/SPICES-CHAMPA 2.5M C/C, NEEM 5M C/C , PILKHAN 5M C/C , SAPTPRANI 5M C/C , MAULSHRI 5M C/C, CONOCORPUS 2.5M C/C, BPTTLE BRUSH 3M C/C, LANDSCAPE AND TREE PLANTING HAS BEEN DESIGNED BY AS PER AUTHORITY GUIDELINES
ONE TRANSFORMER OF 1000KVA WILL BE INSTALLED AS PER LOAD REQUIREMENT AND AS PER APPROVED LAYOUT ALONG WITH FEDER PILLARS AND DISTRIBUTION NETWORK. THE SAME SHALL BE AS PER UP ELECTRICITY BOARD GUIDELINES
THE APPROXIMATE AREA OF COMMUNITY FACILITIES WILL BE DESIDE AS PER LAYOUT DRAWING , THE COMMUNITY BUILDING SHALL BE CONSTRUCTED AS PER SANCTION MAP WHICH INCLUDE HALL, CHILDREN PLAY AREA , GYM, WATER BODY ENTRANCE LOBBY ETC.COMMUNITIY FACILITIES AREA HAS BEEN DESIGNED AS PER AUTHORITY NORMS AND FACILITIES
SEWER WILL BE TREATED IN STP165 KLD AND TREATED WATER WILL BE RECYCED FOR USE IN FLUSHING AND GARDENING
DOOR TO DOOR COLLECTION AND WILL BE DISPOSED UP TO GARBAGE POINT OF THE AUTHORITY
THE RAIN WATER HARVESTING (2 NUMBER OF 5.65 CUM) SHALL BE DONE AS PER EC NORMS TO RECHARGE GROUND WATER TABLE. THE LOW FLOW WATER FIXURES WILL BE USED FOR LESS WATER CONSUMPTION. RECYCLINHG OF WATER AND RAIN WATER SYSTEM TO BE PROVIDE
THE ENERGY MANAGEMENT SHALL BE DONE AS PER ECBC REGULATIONS INCLUDING ONLINE ROOF TOP SOLAR SYSTEM (80KW) FOR BASEMENT LIGHTING ,SOLAR PANEL HAS BEEN PROVIDED AS PER NORMS AT SUITABLE PLACE
NO OF HYDRANT 34, FIRE EXITS PROVIDED AS PER NBC 2016, AUTOMATIC SPRINKLER SYSTEM, NBC COMPLIANCE-YES FIRE SAFTEY TRAINING WILL BE PROVIDED, SYSTEM WILL BE PROVIDED AS PER THE FIRE DEPARTMENT GUIDELINES
PUBLIC TOILET, HEALTH FACILITY , FIRST AID KIT ETC, AS PER SANCTION PLAN
AS PER SANCTION PLAN FOR THE FIRE DEPARTMENT
NA
The Grand Emporio is located in Ghaziabad.
Yes. The Grand Emporio is registered under UPRERAPRJ257958/07/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for The Grand Emporio is 26 February 2031.
The Grand Emporio is developed by SHRINATH JI PROMOTERS AND DEVELOPERS.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.