28.6480
77.4032
Part of Plot No. 4/ BS-01 and BS-05, Siddharth Vihar NH-24 Ghaziabad
Combination of RCC and MS Work upto 2.4 metre with peripheral tree plantation along boundary
Road work is combination of concrete paver and stone work with design patterns
Footpaths are made up of stone to connect the entire project with entrance lobbies, Parks.
Water supply connection will be provided by UPAVP (Uttar Pradesh Awas Evam Vikas Parishad), Ghaziabad and will be connected to project Under ground tank, further distributed to Overhead tank and then to individual flats
Sewar water will be treated in the proposed project Sewage Treatment Plant of capacity 1860 KLD
Storm water drain will be connected to Rain Water Harvesting Pit provided as per norms
Park/ Green areas will be developed as per sanctioned plan.
Diffrerent Evergreen and ornamental trees, shrubs, groundcovers, creepers will be provided and peripheral boundary plantation as proposed.
Electric Supply will be provided by UPPVVNL
Community building is provided with facilities like Swimming Pool, Gymnasium, Well equipped kids play areas, Multipurpose hall with party lawn, Reading Room, Yoga.
Sewage and Sullage water will be treated in the proposed Project Sewage treatment plant of capacity 1860 KLD and later will be used in flushing and Horticulture.
Solid waste management area will be provided as per norms in Basement with all required equipments.
All water from Hardscapes, Terraces, Internal roads will be connected with drains and will connect to Rain Water Harvesting pit to recharge groundwater
Solar energy system/ photovoltaic will be placed at terrace level to cater the energy needs of common areas/Landscape.
Fire fighting system will be provided as per fire norms with Hose reels, Fire Alarm systems with proper placement of sprinklers and smoke detectors.
Multipurpose hall, Gym, TT Room, Swimming Pool, Kids play area, Parks etc
Building premises are equipped with fire staircases, fire shafts, and fire hose reels and other necessary equipments , fire tender route is provided in entire site as per fire norms
N/A
Showing 6 blocks with 384 units
Total Carpet Area
90083.92 m²
969654.31 ft²
Total Units
1092
3 different types
Blocks & Floors
6
35 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
154916.51 m²
1667505.80 ft²