OngoingActive

Vedantam Phase-2( Tower B1, C2 & C1)

Gautam Buddha Nagar, Uttar Pradesh
30-06-2014
Launch Date
Ongoing
Type
31-12-2018
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

31-12-2018

RERA ID

UPRERAPRJ7730

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)5000
Project NameVedantam Phase-2( Tower B1, C2 & C1)
Registration Fee (in Rs.)30000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)55
DistrictGautam Buddha Nagar
Original Start Date31-12-2012
TehsilGautam Buddha Nagar
Proposed Start Date30-06-2014
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)5000
Proposed Completion Date31-12-2018

Location

Latitude

28.36.51 N

Longitude

77.25.14 E

Bank Details

Account no.04622000001311
Name Of Account HolderRADICON INFRASTRUCTURE & HOUSING PVT LTD
Bank NameBCB BANK LTD
Branch AddressBARAKHAMBHA ROAD,CONNAUGHT PLACE ,NEW DELHI
Branch NameBARAKHAMBHA ROAD,CONNAUGHT PLACE ,NEW DELHI
IFSC CodeDBCL0000046

Development Works

Demarcation of Plots

The plot over which the phase is being developed is demarcated by Plot No. 1A on the North Side, Plot No.1C on the east side, 60 meter wide road on the west side and 60 meter wide road on the south side

Boundary Wall

RCC footing, Beam, PlingthBeam and class one brick massonary with high quality plaster and paint.

Road Work

RCC road with high durability using tremix technology

Footpaths

High quality interlocking blocks and pavers

Water Supply Including Drinking Water Facilities

Ganga water supply from GNIDA with in house water treatment plant

Sewer System

RCC sewer pipes with proper main holes

Drain

RCC pipe and open drains with RCC cover.Rain water harvesting with sumps in basement

Parks

Lush green parks with grass and hedges.

Tree Planting

High quality Round the year palnts and trees like ficus, magnolia, white champa, slendar lady palm and premium specie of bamboo.

Design For Electric Supply Including Street Lighting

Compact sub station of schnider, HT and LT cable of Havells, electric supply of 33 KVA from NPCL, DG sets of Kirloskar.

Community Buildings

Club with gym and swimming pool facility to be ready by PHASE-3.

Treatment and Disposal System of Sewage and Sullage water

Modouler sewage treatment plant with recyled water to be used for flushing and gardening.

Solid Waste Management And Disposal System

As may be approved and provided by the competent authority for the time being in force.

Water Conservation System

rain water harvesting -Pits totaling to 5 No.s

Energy Management System Including Use of Renewable Energy

NA

Fire Protection And Fire Safety System

sprinkler in every room of all flats, fire curtain system in basement, pumproom with main, diesel, fire jockey pumps

Social Infrastructure And Other Public Amenities Including Public Health Services

Club, gym, swimmingpool, kids play area , siting in grean area, community hall, shoping centre

Emergency Evacuation Services

2 NOS fire stair cases in every tower

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 22213 | Date: 18-10-2010

Allotment Letter issued by Competent Authority

No: PROP/BRS-02/2010/1514 | Date: 29-04-2010

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 06-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Legal Document of Agreement in Case of other Land

Uploaded: 13-10-2017

Permits

Orignal Permit NoBP-2527/GH/FTS-5022
Orignal Permit Date18-06-2014
Valid Upto17-06-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-06-2024
End Date31-12-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameNot specified
Architect AddressNot specified
Architect Licence NumberNot specified
Structural Engineer NameNot specified
Structural Engineer AddressNot specified
Mobile number(Project Co-ordinator)9560511663

Land Details

AFS

Showing 3 blocks with 65 units

Property Summary

Total Carpet Area

15135.59

162917.98 ft²

Total Units

247

3 different types

Blocks & Floors

3

22 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:61.28
Balconies:171
Parking ratio:0.00 per unit

Block B1

21 units

Block C2

22 units

Block C1

22 units

Khasra Details

Total Area

20005.50

215337.20 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01B
Area(In Sq. Mt.)20005.50

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameNot specified
Architect AddressNot specified
Architect Licence NumberNot specified
Structural Engineer NameNot specified
Structural Engineer AddressNot specified
Mobile number(Project Co-ordinator)9560511663