Launch Date
Completion Date
RERA ID
28.585591353906654
77.44582133818527
Not Applicable. The Development is IT/ITES Offices
boundary wall with railing.
Fire tender road in R.C.C as per approved plans
1m-1.2m wide footpath with stamp concrete/Paver tiles.
1. Water source is Greater Noida Authority.
Yes, Connected to municipal drain.
Strom water drains diverting to rainwater harvesting pits and over flow connected to municipal drain.
Total green area 14753 sqm in total project. (Phase 3 pro rata basis)
Total number of trees proposed for project 300 no. phase 3 (Pro data basis)
grid supply .step down wherever possible.
not applicable
1. Sewage is treated through STP and water used for flushing, cooling towers and irrigation. 2. Waste of the sewage is collected in sludge tank and after full decomposition handed over to competent vendor.
As per the directions noted through guidelines for achieving gold rated lead certification.
1. Rainwater harvesting pits 2. STP water used for flushing, cooling towers and irrigation.
1. All High side equipment’s (chillers, pumps, motors and AHU’s are proposed very energy efficient according the Gold rated building.Solar lights are proposed.
1. One layer of the fire sprinkler system on each level and floors. 2. Fire hydrant system 3. Fire extinguisher
not applicable
1. All level is to be marked with fire exit direction signage and building evacuation plan 2. Full building is loaded with fire annunciation system (MCP, and fire man telephone points) 3. According to fire norms fire refuse areas is also proposed 4. Fresh air and smoke evacuation is also proposed on each level.
not applicable
Total Area
41087.00 m²
442256.36 ft²