OngoingActive

Urbainia Trinity NX (phase III)

Gautam Buddha Nagar, Uttar Pradesh
03-01-2016
Launch Date
Ongoing
Type
08-04-2023
Completion Date

Overview

Launch Date

03-01-2016

Completion Date

08-04-2023

RERA ID

UPRERAPRJ6307

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)7187
Project NameUrbainia Trinity NX (phase III)
Registration Fee (in Rs.)10000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)88
DistrictGautam Buddha Nagar
Original Start Date03-01-2016
TehsilGautam Buddha Nagar
Proposed Start Date03-01-2016
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)4723
Proposed Completion Date08-04-2023

Location

Latitude

28.585591353906654

Longitude

77.44582133818527

Bank Details

Account no.158005001056
Name Of Account HolderUrbainia Spaces Pvt. Ltd.
Bank NameICICI Bank Ltd.
Branch AddressStellar IT Park Sector-62 Noida
Branch NameStellar IT Park Sector-62 Noida
IFSC CodeICIC0001580

Development Works

Demarcation of Plots

Not Applicable. The Development is IT/ITES Offices

Boundary Wall

boundary wall with railing.

Road Work

Fire tender road in R.C.C as per approved plans

Footpaths

1m-1.2m wide footpath with stamp concrete/Paver tiles.

Water Supply Including Drinking Water Facilities

1. Water source is Greater Noida Authority.

Sewer System

Yes, Connected to municipal drain.

Drain

Strom water drains diverting to rainwater harvesting pits and over flow connected to municipal drain.

Parks

Total green area 14753 sqm in total project. (Phase 3 pro rata basis)

Tree Planting

Total number of trees proposed for project 300 no. phase 3 (Pro data basis)

Design For Electric Supply Including Street Lighting

grid supply .step down wherever possible.

Community Buildings

not applicable

Treatment and Disposal System of Sewage and Sullage water

1. Sewage is treated through STP and water used for flushing, cooling towers and irrigation. 2. Waste of the sewage is collected in sludge tank and after full decomposition handed over to competent vendor.

Solid Waste Management And Disposal System

As per the directions noted through guidelines for achieving gold rated lead certification.

Water Conservation System

1. Rainwater harvesting pits 2. STP water used for flushing, cooling towers and irrigation.

Energy Management System Including Use of Renewable Energy

1. All High side equipment’s (chillers, pumps, motors and AHU’s are proposed very energy efficient according the Gold rated building.Solar lights are proposed.

Fire Protection And Fire Safety System

1. One layer of the fire sprinkler system on each level and floors. 2. Fire hydrant system 3. Fire extinguisher

Social Infrastructure And Other Public Amenities Including Public Health Services

not applicable

Emergency Evacuation Services

1. All level is to be marked with fire exit direction signage and building evacuation plan 2. Full building is loaded with fire annunciation system (MCP, and fire man telephone points) 3. According to fire norms fire refuse areas is also proposed 4. Fresh air and smoke evacuation is also proposed on each level.

Other Miscellaneous Work

not applicable

Documents

Lease Deed

No: 7749/2015/BOOKNO.10201 | Date: 15-04-2008

Allotment Letter issued by Competent Authority

No: IT/2008/167 | Date: 14-11-2008

Allotment Letter issued by Competent Authority

No: IND/IT/2008 | Date: 04-09-2008

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 31-08-2018

Commencement Certificate

Uploaded: 06-07-2018

Other Plan(If Any)

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 24-08-2018

Proforma of Allotment Letter

Uploaded: 27-08-2018

Waste Disposal Plan

Uploaded: 29-09-2018

Water Supply Plan

Uploaded: 29-09-2018

Electricity Supply Plan

Uploaded: 29-09-2018

Development Work Plan

Uploaded: 29-09-2018

Affidavit

Uploaded: 10-09-2018

CA CERTIFICATE

Uploaded: 29-09-2018

ARCHITECT CERTIFICATE

Uploaded: 01-08-2018

ENGINEERS CERTIFICATE

Uploaded: 29-09-2018

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Details of Encumbrances

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Permits

Orignal Permit NoPLG(BP-3532)6808
Orignal Permit Date10-11-2015
Valid Upto09-11-2020
Revalidated Permit NoPLG/BP-3532/6726
Revalidated Permit Date10-10-2017
Revalidated Permit Valid Upto09-10-2022
Permit Extendable Upto21-12-2024
End Date09-10-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameConfluence Consultancy Services
Architect AddressB-421, New Friends ColonyNew Delhi-110065. India
Architect Licence NumberCA-98/23361
Structural Engineer NameKeen Associates Pvt Ltd
Structural Engineer AddressH-53,1st floor,opposite vijaya bank coomercial area,Sector 63, Noidak
Mobile number(Project Co-ordinator)9899987377

Khasra Details

Total Area

41087.00

442256.36 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPLOT NO. 6A, TECH ZONE IV,GREATER NOIDA WEST
Area(In Sq. Mt.)41087

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameConfluence Consultancy Services
Architect AddressB-421, New Friends ColonyNew Delhi-110065. India
Architect Licence NumberCA-98/23361
Structural Engineer NameKeen Associates Pvt Ltd
Structural Engineer AddressH-53,1st floor,opposite vijaya bank coomercial area,Sector 63, Noidak
Mobile number(Project Co-ordinator)9899987377