28.58663065313656
77.44594161072715
Total Units
302
2 unit types
Carpet Area
1,55,229 ft²
14,421.28 m² · carpet only, excludes balcony
Blocks & Floors
5
22 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 514 ft² (47.75 m²)Balconies 19Parking per unit 0.0013 of 146 rows list no units (13 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 146 rows · 9 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal | Verandahs | Verandah Areatotal |
|---|---|---|---|---|---|---|---|---|
| C | BSMNT | OTHER | — | — | — | — | — | — |
| C | GF | OTHER | 1 | 2,130 ft²197.84 m² | — | — | — | — |
| C | GF | OTHER | 1 | 2,766 ft²256.99 m² | — | — | — | — |
| C | GF | OTHER | 1 | 1,344 ft²124.84 m² | — | — | — | — |
| C | GF | OTHER | 1 | 952 ft²88.44 m² | — | — | — | — |
| C | GF | OTHER | 1 | 978 ft²90.88 m² | — | — | — | — |
| C | GF | OTHER | 2 | 61 ft²5.70 m² | — | — | — | — |
| C | GF | OTHER | 1 | 57 ft²5.31 m² | — | — | — | — |
| C | GF | OTHER | 3 | 62 ft²5.75 m² | — | — | — | — |
| C | GF | OTHER | 1 | 64 ft²5.98 m² | — | — | — | — |
| C | GF | OTHER | 2 | 61 ft²5.70 m² | — | — | — | — |
| C | GF | OTHER | 3 | 60 ft²5.62 m² | — | — | — | — |
| C | GF | OTHER | 2 | 62 ft²5.77 m² | — | — | — | — |
| C | GF | OTHER | 1 | 63 ft²5.85 m² | — | — | — | — |
| C | GF | OTHER | 2 | 74 ft²6.86 m² | — | — | — | — |
| C | GF | OTHER | 1 | 75 ft²6.94 m² | — | — | — | — |
| C | GF | OTHER | 3 | 72 ft²6.68 m² | — | — | — | — |
| C | GF | OTHER | 2 | 73 ft²6.76 m² | — | — | — | — |
| C | GF | OTHER | 1 | 77 ft²7.13 m² | — | — | — | — |
| C | 1 | OTHER | 3 | 568 ft²52.81 m² | 1 | 84 ft²7.85 m² | — | — |
| C | 1 | OTHER | 6 | 596 ft²55.37 m² | — | — | — | — |
| C | 1 | OTHER | 3 | 581 ft²53.99 m² | — | — | — | — |
| C | 1 | OTHER | 1 | 562 ft²52.19 m² | — | — | — | — |
| C | 1 | OTHER | 2 | 577 ft²53.57 m² | — | — | — | — |
| C | 1 | OTHER | 1 | 582 ft²54.09 m² | — | — | — | — |
| C | 1 | OTHER | 1 | 1,290 ft²119.85 m² | — | — | — | — |
| C | 1 | OTHER | 1 | 695 ft²64.54 m² | — | — | — | — |
| C | 2 | OTHER | 3 | 568 ft²52.81 m² | 1 | 84 ft²7.85 m² | — | — |
| C | 2 | OTHER | 6 | 596 ft²55.37 m² | — | — | — | — |
| C | 2 | OTHER | 3 | 581 ft²53.99 m² | — | — | — | — |
| C | 2 | OTHER | 1 | 562 ft²52.19 m² | — | — | — | — |
| C | 2 | OTHER | 2 | 577 ft²53.57 m² | — | — | — | — |
| C | 2 | OTHER | 1 | 582 ft²54.09 m² | — | — | — | — |
| C | 2 | OTHER | 1 | 1,290 ft²119.85 m² | — | — | — | — |
| C | 2 | OTHER | 1 | 695 ft²64.54 m² | — | — | — | — |
| C | 3 | OTHER | 3 | 568 ft²52.81 m² | 1 | 84 ft²7.85 m² | — | — |
| C | 3 | OTHER | 6 | 596 ft²55.37 m² | — | — | — | — |
| C | 3 | OTHER | 3 | 581 ft²53.99 m² | — | — | — | — |
| C | 3 | OTHER | 1 | 562 ft²52.19 m² | — | — | — | — |
| C | 3 | OTHER | 2 | 577 ft²53.57 m² | — | — | — | — |
| C | 3 | OTHER | 1 | 582 ft²54.09 m² | — | — | — | — |
| C | 3 | OTHER | 1 | 1,290 ft²119.85 m² | — | — | — | — |
| C | 3 | OTHER | 1 | 695 ft²64.54 m² | — | — | — | — |
| C | 4 | OTHER | 3 | 568 ft²52.81 m² | — | — | — | — |
| C | 4 | OTHER | 6 | 596 ft²55.37 m² | — | — | — | — |
| C | 4 | OTHER | 3 | 581 ft²53.99 m² | — | — | — | — |
| C | 4 | OTHER | 1 | 562 ft²52.19 m² | — | — | — | — |
| C | 4 | OTHER | 2 | 577 ft²53.57 m² | — | — | — | — |
| C | 4 | OTHER | 1 | 582 ft²54.09 m² | — | — | — | — |
| C | 4 | OTHER | 1 | 1,290 ft²119.85 m² | — | — | — | — |
Issued On 10-11-2015 · Valid Upto 09-11-2020 · Extendable Upto 21-12-2024 · Revalidated Permit No PLG/BP-3532/6726 · Revalidated On 10-10-2017 · Revalidated Valid Upto 30-09-2022
1 entry · 5 documents
Issued On 10-11-2015 · Valid Upto 09-11-2020 · Extendable Upto 21-12-2024 · Revalidated Permit No PLG(BP-3532)6808 · Revalidated On 10-11-2015 · Revalidated Valid Upto 30-09-2022
2 entries · 6 documents
Total Plot Area
10.15 acres
41,087.00 m² · plot area
Not Applicable. The Development is IT/ITES Offices
boundary wall with railing.
Fire tender road in R.C.C as per approved plans
1m-1.2m wide footpath with stamp concrete/Paver tiles.
1. Water source is Greater Noida Authority.
Yes, Connected to municipal drain.
Strom water drains diverting to rainwater harvesting pits and over flow connected to municipal drain.
Total green area 14753 sqm in total project. (Phase 1 pro rata basis)
Total number of trees proposed for project 300 no. phase 1 (Pro data basis)
grid supply .step down wherever possible.
not applicable
1. Sewage is treated through STP and water used for flushing, cooling towers and irrigation. 2. Waste of the sewage is collected in sludge tank and after full decomposition handed over to competent vendor.
As per the directions noted through guidelines for achieving gold rated lead certification.
1. Rainwater harvesting pits 2. STP water used for flushing, cooling towers and irrigation.
1. All High side equipment’s (chillers, pumps, motors and AHU’s are proposed very energy efficient according the Gold rated building.Solar lights are proposed.
1. One layer of the fire sprinkler system on each level and floors. 2. Fire hydrant system 3. Fire extinguisher
Not applicable
1. All level is to be marked with fire exit direction signage and building evacuation plan 2. Full building is loaded with fire annunciation system (MCP, and fire man telephone points) 3. According to fire norms fire refuse areas is also proposed 4. Fresh air and smoke evacuation is also proposed on each level.
Not Applicable
Urbainia Trinity NX (phase 1) is located in Gautam Buddha Nagar.
Yes. Urbainia Trinity NX (phase 1) is registered under UPRERAPRJ6110 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Urbainia Trinity NX (phase 1) is 20 June 2021.
Urbainia Trinity NX (phase 1) is developed by AVDESH INFOTECH PVT LTD/URBAINIA SPACES PVT. LTD..
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.