Total Units
46
1 unit type
Carpet Area
1,12,420 ft²
10,444.14 m² · carpet only, excludes balcony
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 2,444 ft² (227.05 m²)Balconies 24Parking per unit 0.002 of 14 rows list no units (2 floors are empty), so they add nothing to these totals
All blocks
Showing 14 of 14 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| ORB-R (PHASE III) | BSMNT | OTHER | — | — | — | — |
| ORB-R (PHASE III) | BSMNT2 | OTHER | — | — | — | — |
| ORB-R (PHASE III) | GF | 4 BHK | 2 | 2,442 ft²226.89 m² | 2 | 510 ft²47.40 m² |
| ORB-R (PHASE III) | 1 | 4 BHK | 4 | 2,442 ft²226.89 m² | 2 | 510 ft²47.40 m² |
| ORB-R (PHASE III) | 2 | 4 BHK | 4 | 2,442 ft²226.89 m² | 2 | 510 ft²47.40 m² |
| ORB-R (PHASE III) | 3 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 4 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 5 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 6 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 7 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 8 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 9 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 10 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
| ORB-R (PHASE III) | 11 | 4 BHK | 4 | 2,444 ft²227.09 m² | 2 | 512 ft²47.61 m² |
Total Plot Area
51.71 acres
2,09,271.47 m² · plot area
As per approved building plans
As per approved building plans
As per approved building plans
As per approved building plans
Water shall be provided by Authority & internal distribution shall be done by developer.
STP shall be provided for sewerage system.
Proper drainage system shall be provided
As per approved plans
As per approved plans
As per approval from authority.
As per approved building plans
STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.
Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.
Adequate nos of recharge pits shall be provided
In common areas LED lights shall be provided with timer control.
As per fire NOC
As per approved building plans
As per fire NOC
As per approved building plans
Supertech Orb-R (Phase-Iii) is located in Gautam Buddha Nagar.
Yes. Supertech Orb-R (Phase-Iii) is registered under UPRERAPRJ5551 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Supertech Orb-R (Phase-Iii) is 29 December 2021.
Supertech Orb-R (Phase-Iii) is developed by SUPERTECH LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.