Total Units
390
2 unit types
Carpet Area
3,26,263 ft²
30,310.86 m² · carpet only, excludes balcony
Blocks & Floors
3
72 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 837 ft² (77.72 m²)Balconies 377Parking per unit 0.009 of 86 rows list no units (9 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 86 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| CB5 | BSMNT2 | OTHER | — | — | — | — |
| CB5 | BSMNT3 | OTHER | — | — | — | — |
| CB5 | GF | OTHER | — | — | — | — |
| CB5 | 1 | 1 BHK | 1 | 550 ft²51.09 m² | 3 | 130 ft²12.09 m² |
| CB5 | 1 | 3 BHK | 5 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 2 | 3 BHK | 1 | 812 ft²75.45 m² | 3 | 196 ft²18.21 m² |
| CB5 | 2 | 3 BHK | 5 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 3 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 4 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 5 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 6 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 7 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 8 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 9 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 10 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 11 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 12 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 13 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 14 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 15 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 16 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 17 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 18 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 19 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 20 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 21 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 22 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 23 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB5 | 24 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | BSMNT2 | OTHER | — | — | — | — |
| CB6 | BSMNT3 | OTHER | — | — | — | — |
| CB6 | GF | OTHER | — | — | — | — |
| CB6 | 1 | 1 BHK | 1 | 550 ft²51.09 m² | 3 | 130 ft²12.09 m² |
| CB6 | 1 | 3 BHK | 5 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 2 | 3 BHK | 1 | 812 ft²75.45 m² | 3 | 196 ft²18.21 m² |
| CB6 | 2 | 3 BHK | 5 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 3 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 4 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 5 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 6 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 7 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 8 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 9 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 10 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 11 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 12 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 13 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 14 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 15 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
| CB6 | 16 | 3 BHK | 6 | 812 ft²75.45 m² | 5 | 196 ft²18.21 m² |
Total Plot Area
51.71 acres
2,09,271.47 m² · plot area
As per approved building plans
As per approved building plans
As per approved building plans
As per approved building plans
Water shall be provided by Authority & internal distribution shall be done by developer.
STP shall be provided for sewerage system.
Proper drainage system shall be provided
As per approved plans
As per approved plans
As per approval from authority.
As per approved plans
STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.
Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.
Adequate nos of recharge pits shall be provided
In common areas LED lights shall be provided with timer control.
As per fire NOC
As per approved building plans
As per fire NOC
As per approved building plans
Supertech Capetown (Phase-V) is located in Gautam Buddha Nagar.
Yes. Supertech Capetown (Phase-V) is registered under UPRERAPRJ17551 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Supertech Capetown (Phase-V) is 29 March 2025.
Supertech Capetown (Phase-V) is developed by SUPERTECH ORB PROJECT PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.