OngoingActive

Stellar One Phase 1

Gautam Buddha Nagar, Uttar Pradesh
27-05-2016
RERA Received Date
Ongoing
Type
29-09-2020
Completion Date

Overview

RERA Received Date

27-05-2016

Completion Date

29-09-2020

RERA ID

UPRERAPRJ6209

Location

Latitude

28'-34'-41.92'

Longitude

77'-26'-03.85'

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)21487
Project NameStellar One Phase 1
Registration Fee (in Rs.)112500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)53
DistrictGautam Buddha Nagar
Original Start Date27-05-2016
TehsilDadri
Proposed Start Date27-05-2016
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)18700
Proposed Completion Date29-09-2020

Bank Details

Account no.50200013066086
Name Of Account HolderStellar Spring Projects Pvt Ltd
Bank NameHDFC Bank Ltd
Branch AddressC 25, Stellar IT Park, Sector 62, Noida 201306
Branch NameSector 62, Noida
IFSC CodeHDFC0002649

Development Works

Demarcation of Plots

North side 24m wide road, South side Plot no. GH-10, East side 24m wide road, West side 60m wide road. Temporary barricading between each phase boundary.

Boundary Wall

One meter high boundary wall with a combination of RCC and MS. Temporary barricading between each phase boundary.

Road Work

All internal road work in concrete paver blocks/VDF

Footpaths

Not Applicable

Water Supply Including Drinking Water Facilities

Water Treatment Plant is provided.

Sewer System

Sewer line with required slope and adequate manholes.

Drain

Adequate catch basins and manholes are provided for surface drain.

Parks

Green area as per authority norms.

Tree Planting

A variety of trees as per authority norms.

Design For Electric Supply Including Street Lighting

As per consultant and supply from NPCL.

Community Buildings

Community facility in CSC block as per approved plan.

Treatment and Disposal System of Sewage and Sullage water

Providing STP as per requirement.

Solid Waste Management And Disposal System

Provided as per authority norms.

Water Conservation System

Rain water harvesting pits are provided as per norms.

Energy Management System Including Use of Renewable Energy

Mix of CFL, LED lights and some solar panels.

Fire Protection And Fire Safety System

As per fire department norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Community facility inside project and public amenities in the vicinity.

Emergency Evacuation Services

As per fire department norms.

Other Miscellaneous Work

As per architects design.

Documents

Lease Deed

No: Book No.1 Volume 16654 Page No. 163 to 194 Sl. 26868 | Date: 14-08-2014

Details of Encumbrances

Uploaded: 05-06-2018

Commencement Certificate

Uploaded: 05-06-2018

Other Plan(If Any)

Uploaded: 05-06-2018

Proforma of Application Form

Uploaded: 05-06-2018

Proforma of Allotment Letter

Uploaded: 05-06-2018

Water Supply Plan

Uploaded: 05-06-2018

Electricity Supply Plan

Uploaded: 05-06-2018

Affidavit

Uploaded: 05-06-2018

CA CERTIFICATE

Uploaded: 30-06-2020

ARCHITECT CERTIFICATE

Uploaded: 30-06-2020

ENGINEERS CERTIFICATE

Uploaded: 30-06-2020

Floor plans of all types

Uploaded: 03-11-2017

Proforma of Allotment Letter

Uploaded: 27-11-2017

Permits

Orignal Permit NoBP-3475/GH/FB-2388
Orignal Permit Date24-04-2015
Valid Upto24-04-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto-
End Date31-03-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoBP-3475/GH/FB-2388
Orignal Permit Date24-04-2015
Valid Upto24-04-2020
Revalidated Permit NoBP-3475/GH/FB-2388
Revalidated Permit Date24-04-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto14-08-2021
End Date31-03-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoBP-3475/GH/FB-2388
Orignal Permit Date24-04-2015
Valid Upto24-04-2020
Revalidated Permit NoBP-3475/GH/FB-2388
Revalidated Permit Date24-04-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto24-04-2025
End Date31-03-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Keystone Developers Pvt. Ltd.
Contractor AddressC-56/9 Sec 62 Noida
Architect NameDinesh Banyal
Architect AddressC-56/9 Sec 62 Noida
Architect Licence NumberCA/2014/66004
Structural Engineer NameC S BHANDARI
Structural Engineer AddressB-55 SHIVALIK, NEW DELHI-17
Mobile number(Project Co-ordinator)8130187772

Land Details

AFS

Showing 5 blocks with 126 units

Property Summary

Total Carpet Area

35341.62 m²

380413.66 ft²

Total Units

588

3 different types

Blocks & Floors

5

16 floors across all blocks

Parking

115

0 garages, 115 open

Average unit size:60.10 m²
Balconies:336
Parking ratio:0.20 per unit

Block H

16 units

Block J

44 units

Block K

44 units

Block CSC

6 units

Block F

16 units

Khasra Details

Total Area

21486.70 m²

231280.69 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-09, Sec-1, Greater Noida West
Area(In Sq. Mt.)21486.70

Other Details

Contractor Name (if any)Keystone Developers Pvt. Ltd.
Contractor AddressC-56/9 Sec 62 Noida
Architect NameDinesh Banyal
Architect AddressC-56/9 Sec 62 Noida
Architect Licence NumberCA/2014/66004
Structural Engineer NameC S BHANDARI
Structural Engineer AddressB-55 SHIVALIK, NEW DELHI-17
Mobile number(Project Co-ordinator)8130187772