spectrum@Metro ( Phase-1)

Gautam Buddha Nagar, Uttar Pradesh
10-12-2015
Launch Date
Ongoing
Type
30-06-2021
Completion Date

Overview

Launch Date

10-12-2015

Completion Date

30-06-2021

RERA ID

UPRERAPRJ6018

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)10064
Project Namespectrum@Metro ( Phase-1)
Registration Fee (in Rs.)111000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)67
DistrictGautam Buddha Nagar
Original Start Date10-12-2015
TehsilGautam Buddha Nagar
Proposed Start Date10-12-2015
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)24714
Proposed Completion Date30-06-2021

Location

Latitude

283429.06

Longitude

772256.46

Bank Details

Account no.081505001670
Name Of Account HolderBLUE SQUARE INFRASTRUCTURE LLP
Bank NameICICI BANK
Branch AddressICICI BANK LTD., SHOP NO. A-3 /13, SECTOR 110, NOIDA 201 301, GAUTAM BUDDHA NAGAR DIST, UP
Branch NameSECTOR-110, NOIDA, UP
IFSC Code ICIC0000815

Development Works

Demarcation of Plots

Survey carried out at site

Boundary Wall

Temporary fencing erected at site

Road Work

Not applicable during construction stage and will be constructed as per approved plans

Footpaths

Not applicable during construction stage and will be constructed as per approved plans

Water Supply Including Drinking Water Facilities

Not applicable during construction stage and will be constructed as per approved plans

Sewer System

Not applicable during construction stage and will be constructed as per approved plans

Drain

Not applicable during construction stage and will be constructed as per approved plans

Parks

Not applicable during construction stage and will be constructed as per approved plans

Tree Planting

Not applicable during construction stage and will be constructed as per approved plans

Design For Electric Supply Including Street Lighting

Not applicable during construction stage and will be constructed as per approved plans

Community Buildings

not applicable

Treatment and Disposal System of Sewage and Sullage water

Not applicable during construction stage and will be constructed as per approved plans

Solid Waste Management And Disposal System

as per respective norms as directed by statutary bodies

Water Conservation System

as per respective norms as directed by statutory bodies

Energy Management System Including Use of Renewable Energy

as per respective norms as directed by statutory bodies

Fire Protection And Fire Safety System

Not applicable during construction stage and will be constructed as per approved plans

Social Infrastructure And Other Public Amenities Including Public Health Services

as per respective norms as directed by statutary bodies

Emergency Evacuation Services

as per respective norms as directed by statutary bodies

Other Miscellaneous Work

As per approved plans

Documents

Lease Deed

No: 10841 | Date: 01-12-2011

Proforma of Application Form

Uploaded: 31-07-2018

Proforma of Allotment Letter

Uploaded: 31-07-2018

Affidavit

Uploaded: 31-07-2018

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 31-07-2018

Affidavit

Uploaded: 30-07-2017

Legal Document of Agreement in Case of other Land

Uploaded: 30-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 14-10-2017

Permits

Orignal Permit NoNOI/CAP/2015/IV-1480/850
Orignal Permit Date10-12-2015
Valid Upto10-12-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-12-2025
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNOI/CAP/2015/IV-1480/850
Orignal Permit Date10-12-2015
Valid Upto10-12-2020
Revalidated Permit NoNOI/CAP/2015/IV-1480/850
Revalidated Permit Date10-12-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto10-12-2025
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameVishal Mittal
Architect AddressB-34,Sector-67, NOIDA-201301
Architect Licence NumberCA/98/23185
Structural Engineer NameV.D Sharma
Structural Engineer AddressB-24, SECTOR-67, NOIDA-201301
Mobile number(Project Co-ordinator)+919891329075

Land Details

AFS

Showing 1 blocks with 339 units

Property Summary

Total Carpet Area

15762.53 m²

169666.30 ft²

Total Units

655

1 different types

Blocks & Floors

1

9 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:24.06 m²
Balconies:0
Parking ratio:0.00 per unit

Block C

339 units

Khasra Details

Total Area

25471.00 m²

274167.30 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC&D
Area(In Sq. Mt.)25471

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameVishal Mittal
Architect AddressB-34,Sector-67, NOIDA-201301
Architect Licence NumberCA/98/23185
Structural Engineer NameV.D Sharma
Structural Engineer AddressB-24, SECTOR-67, NOIDA-201301
Mobile number(Project Co-ordinator)+919891329075