Launch Date
Completion Date
RERA ID
28.358525
77.531036
Green Belts plus 40 Meter Double road at front Plot & Right hand side 32 meter road and 32 meter back side road.
2.1 Meter Height Boundary wall on total plot area
6 meter Front 22 Meter Wide roads plus 30 Meter wide internal road.
4 feet wide foot path surrounding the green area.
3 under ground reservoir.
External Sewerage System with STP.
External & Internal Drain with Rain Water Harvesting.
Total Landscape area including Roads is 50258 Sq. Meter.
There is Total 544 Trees including Evergreen tree 304.
2 way poles around the Entire inside circular roads.
Double Story Club House of 22000 Sqft Area.
STP & Provision of Effulant Water for the Greens.
it`s plan as per environmental Norms.
Rain Water Harvesting 8 nos. 4.25 m Dia X 4.5 m Depth.
As per the Minister of Renewal of Energy.
Sprinklers and Alarm Systems are proposed for all Units.
Main Club and Roof top Club
As per the Norms and Fire NOC already Received.
Swimming Pool, Tennis club, Badminton Court ETC.
No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023
No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023
No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023
No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023
No: Affidavit for Extension of Project Pary 3 | Date: 22-11-2023
No: Affidavit for Extension of Registration of Solitairian City(Pary) Phase-3 Project | Date: 05-01-2024
No: Reply of Objection Letter for Extension of Solitairian City (Pary) Phase-3 | Date: 18-01-2024
No: RA-3 Application for Change Bank Accounts with Bank Statements | Date: 07-02-2024
Showing 2 blocks with 119 units
Total Carpet Area
37782.27 m²
406684.58 ft²
Total Units
356
4 different types
Blocks & Floors
2
33 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
67011.60 m²
721306.16 ft²