OngoingActive

SOLITAIRIAN CITY - (PARY) PHASE-3

Gautam Buddha Nagar, Uttar Pradesh
01-01-2017
Launch Date
Ongoing
Type
31-03-2025
Completion Date

Overview

Launch Date

01-01-2017

Completion Date

31-03-2025

RERA ID

UPRERAPRJ6887

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)7449
Project NameSOLITAIRIAN CITY - (PARY) PHASE-3
Registration Fee (in Rs.)42500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)99
DistrictGautam Buddha Nagar
Original Start Date01-01-2017
TehsilGautam Buddha Nagar
Proposed Start Date01-01-2017
Sanctioning Competent AuthorityYamuna Expressway Authority
Project Cost (in Lacs)12618.94
Proposed Completion Date31-03-2025

Location

Latitude

28.358525

Longitude

77.531036

Bank Details

Account Details
Name of the AccountPary Developers Pvt. Ltd. Collection Account for Solitairian City (Pary) Phase-3
Account Number165405001349
Bank NameICICI Bank Ltd.
Branch NameShakti Khand-2, Indirapuram, Ghaziabad
Branch AddressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0001654
Branch Email Addressshipra.mendiratta[at]icicibank.com
Separate Account Details
Name of the AccountPARY DEVELOPERS PVT LTD RERA DESIGNATED A/C SOLITAIRIAN CITY (PARY) PHASE 3
Account Number165405001351
Bank NameICICI Bank
Branch NameShakti Khand 2, Indirapuram, Ghaziabad
Branch AddressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand 2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0001654
Transaction Account Details
Name of the AccountPary Developers Pvt Ltd. RERA Transaction Account for Solitairian City (Pary) Phase-3
Account Number165405001350
Bank NameICICI Bank Ltd.
Branch NameShakti Khand-2, Indirapuram, Ghaziabad
Branch AddressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0001654
Branch Email Addressshipra.mendiratta[at]icicibank.com

Development Works

Demarcation of Plots

Green Belts plus 40 Meter Double road at front Plot & Right hand side 32 meter road and 32 meter back side road.

Boundary Wall

2.1 Meter Height Boundary wall on total plot area

Road Work

6 meter Front 22 Meter Wide roads plus 30 Meter wide internal road.

Footpaths

4 feet wide foot path surrounding the green area.

Water Supply Including Drinking Water Facilities

3 under ground reservoir.

Sewer System

External Sewerage System with STP.

Drain

External & Internal Drain with Rain Water Harvesting.

Parks

Total Landscape area including Roads is 50258 Sq. Meter.

Tree Planting

There is Total 544 Trees including Evergreen tree 304.

Design For Electric Supply Including Street Lighting

2 way poles around the Entire inside circular roads.

Community Buildings

Double Story Club House of 22000 Sqft Area.

Treatment and Disposal System of Sewage and Sullage water

STP & Provision of Effulant Water for the Greens.

Solid Waste Management And Disposal System

it`s plan as per environmental Norms.

Water Conservation System

Rain Water Harvesting 8 nos. 4.25 m Dia X 4.5 m Depth.

Energy Management System Including Use of Renewable Energy

As per the Minister of Renewal of Energy.

Fire Protection And Fire Safety System

Sprinklers and Alarm Systems are proposed for all Units.

Social Infrastructure And Other Public Amenities Including Public Health Services

Main Club and Roof top Club

Emergency Evacuation Services

As per the Norms and Fire NOC already Received.

Other Miscellaneous Work

Swimming Pool, Tennis club, Badminton Court ETC.

Documents

Registry Document

No: 24054 | Date: 23-07-2014

Registry Document

No: 32715 | Date: 27-12-2013

Allotment Letter issued by Competent Authority

No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023

Allotment Letter issued by Competent Authority

No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023

Allotment Letter issued by Competent Authority

No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023

Allotment Letter issued by Competent Authority

No: Application to YEIDA for Maps with Challan copy | Date: 25-11-2023

Allotment Letter issued by Competent Authority

No: Affidavit for Extension of Project Pary 3 | Date: 22-11-2023

Allotment Letter issued by Competent Authority

No: Affidavit for Extension of Registration of Solitairian City(Pary) Phase-3 Project | Date: 05-01-2024

Allotment Letter issued by Competent Authority

No: Reply of Objection Letter for Extension of Solitairian City (Pary) Phase-3 | Date: 18-01-2024

Allotment Letter issued by Competent Authority

No: RA-3 Application for Change Bank Accounts with Bank Statements | Date: 07-02-2024

Details of Encumbrances

Commencement Certificate

Proforma of Completion Certificate(Occupancy)

Other Plan(If Any)

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Legal Document of Agreement in Case of other Land

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Permits

Orignal Permit NoYEA/PLANNING/BP-27/1035
Orignal Permit Date08-09-2014
Valid Upto21-02-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-02-2024
End Date31-12-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoYEA/PLANNING/BP-27/1035
Orignal Permit Date30-09-2020
Valid Upto10-07-2023
Revalidated Permit NoYEA/PLANNING/BP-27/1035
Revalidated Permit Date30-09-2020
Revalidated Permit Valid Upto10-07-2028
Permit Extendable Upto10-07-2028
End Date30-06-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameVISHAL SHARMA
Architect AddressNEW DELHI
Architect Licence NumberCA-98/23261
Structural Engineer NameVINTECH CONSULTANT
Structural Engineer AddressNEW DELHI
Mobile number(Project Co-ordinator)8527798859

Land Details

AFS

Showing 2 blocks with 119 units

Property Summary

Total Carpet Area

37782.27 m²

406684.58 ft²

Total Units

356

4 different types

Blocks & Floors

2

33 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:106.13 m²
Balconies:248
Parking ratio:0.00 per unit

Block S1

56 units

Block S5

63 units

Khasra Details

Total Area

67011.60 m²

721306.16 ft²

2 plots
Plot
TypePlot
Khasra/Plot NoGH-B-1
Area(In Sq. Mt.)21622.60
Plot
TypePlot
Khasra/Plot NoGH-B-2
Area(In Sq. Mt.)45389

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameVISHAL SHARMA
Architect AddressNEW DELHI
Architect Licence NumberCA-98/23261
Structural Engineer NameVINTECH CONSULTANT
Structural Engineer AddressNEW DELHI
Mobile number(Project Co-ordinator)8527798859
SOLITAIRIAN CITY - (PARY) PHASE-3 by PARY DEVELOPERS PRIVATE LIMITED | ReraTracker