Launch Date
Completion Date
RERA ID
28 36 36N
77 27 47E
Proposal for boundary wall around the project of four side up to 2.0 m heights
Provision for 6.0 m wide drive way as per approved drgs
Proposal for footpath area as per approved drgs
Provision for water supply by over head tanks for drinking and fire water tanks in each Tower/block seperately
Provision for sewer line and manholes connecting to STP OF 400 KLD as per approved drgs
Provision for internal drains for rain water and external water collection for harvesting of water
Proposal for green and landscape area as per approved drgs
Proposal for 136 nos of trees plantation as per approved drgs
Provision of Led street lighting , dedicated transformer,including power backup as per approvals
Provision for Club for social gathering and public meeting
Provision of 400 KLD STP plant dedicated to project
Provision of Garbage chute in each Blocks/towers and disposal by mechanical means, Solid Waste Management And Disposal System
Rain water harvesting system at ground level around the projects
Energy Management System as per ECBC guidline
Provision of Sprinkler and Hydrant systems for each Block/Tower including external area
Provision for club and commercial space for public amenities
Provision for fire stairs for Emergency Evacuation Services in each Tower /block seperately
Ampetheatre ,Swimming pool ,Green area
Showing 6 blocks with 145 units
Total Carpet Area
48184.92 m²
518657.66 ft²
Total Units
774
3 different types
Blocks & Floors
6
24 floors across all blocks
Parking
803
803 garages, 0 open
Total Area
17288.00 m²
186086.30 ft²