RERA Received Date
Completion Date
RERA ID
28.655938
77.482925
5.58 acres site area abutting With 45m wide road at North-East,18m wide road on South-west. Site enclosed with Boundary Wall.
Shall be from 1.5 m to 1.8 metre high wall Finish Combination of Material-Stone Cladding/Grit/Texture Paint/MS Railing .
Inside the Project ---Tremix Concrete Flooring/Pavers.
Material-Stone/ Concrete Paver
Water will be brought into Raw water tank from township Borewell supply . From there water will be transferred to OHT to supply to all users points. The Capacity Overhead Water Tank for Tower A1 and A2 is 22000 LPD for Domestic, 11000 LPD for Flushing and 10000 Litres for Fire. The Capacity Overhead Water Tank for Tower B1 and B2 is 23000 LPD for Domestic, 12000 LPD for Flushing and 10000 Litres for Fire. The Capacity Overhead Water Tank for Club is 10000 LPD for Domestic, 16000 LPD for Flushing and 10000 Litres for Fire.
The soil & waste water discharge from toilets and kitchen conveyance through pipes, and dischange into external sewer lines running between boundary wall and retaining wall/basement ceiling. The sewer lines finally discharge into sewage treatment plant. After treatment, water will be used for flushing and irrigation purposes .
The rainwater collected from terraces of different towers bought into strom water drainage lines running between boundary wall and retaining wall. Adequate number/capacity of rain water harvesting tanks proposed as per CGWB norms.
Combination of Material Grass/Paver/Pebble/EPDM
Planned trees are 270 Nos. in Open areas and along the boundary wall different types of trees shall be provided .
Electrical Supply based upon 11 kva Supply Volatge through Single Point Bulk Supply Electricity Connection. Electricity Supply to Apartmets through Rising Mains System with DSDR Meters at all floors. The External Lighting is proposed based upon Landscape design. External Lighting shall be timer based control system. External lightings and basment lightying shall be timer based control system. Common area lighting shall be sepertely metered.
Spreaded over four levels ie Ground plus two Storeys and terrace. Club Facilities include Party/Banquet Hall, Café, Restaurant,Bar, Saloon, Auditorium, Spa, Music/Karaoke Room, Creche, Indoor Kids Play Area, Gym, Indoor Games Area, Squash Court, Badminton Court, Yoga Room & Swimming Pool.
The treatment of sulluage will be done in sewage treatment plant of adequate capacity of SBR reactor. The treatmnet of sullage will be done with ultra filtration process and outlet parameters will be as per EIA requirements. The treated water will be transferred to OHT for flushing and irrigation purposes. The Capacity of Sewage Treatment Plant is 350 KLD.
Not Applicable.
The water will be conserved by adopting best quality IGBC certified low volume and low dischage fixtures.
Not Applicable.
The fire protection will be done as per Fire NOC
Not Applicable.
1. Fire Staircase at all floors in all towers. 2. Refuge terrace at 60m and 90m height. 3. 9m wide Fire tender movement at ground level.
Construction of Commercial Area on Ground plus Two Storey as Independent Area
Showing 4 blocks with 344 units
Total Carpet Area
49174.17 m²
529305.85 ft²
Total Units
455
2 different types
Blocks & Floors
4
30 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13880.68 m²
149410.25 ft²