Launch Date
Completion Date
RERA ID
28.581810712658626
77.43464434841938
Demarcation is done at site
NA
NA
NA
Water supply via Underground Tank
Underground System using uPVC(SN-4) Sewer pipes.
Underground System using uPVC(SN-4) pipes.
NA
GNIDA
Transformers (Compact Sub station) shall be used along with necessary switch-gear for distributing electricity at LT voltage.
NA
NA
NA
NA
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.
NA
Fire escape staircase provided in Each tower as per Fire NOC.
As per requirement.
Showing 1 blocks with 14 units
Total Carpet Area
2303.81 m²
24797.98 ft²
Total Units
160
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2290.00 m²
24649.33 ft²