Have queries on this Project?
28.561034
77.440191
Showing 1 blocks with 32 units
Total Carpet Area
16575.93 m²
178421.65 ft²
Total Units
155
3 different types
Blocks & Floors
1
27 floors across all blocks
Parking
0
0 garages, 0 open
No: Land Dues Payment Details with NOC Letter No. 1126 | Date: 10-07-2024
No: Letter with Challan copy to Greater Noida Authority | Date: 03-04-2017
No: Reply of Objection of Registration of RGs Pleiaddes Phase-4 ( Part-1) | Date: 06-11-2024
No: Reply of Objection of Registration of RGs Pleiaddes Phase-4 (Part-2) | Date: 06-11-2024
Total Area
33000.00 m²
355208.70 ft²
Plot No. GH-14B, Sector 1, Greator Noida, demarcation had been done by Greator Noida Industrial Development Authority.
Yes, Masonary Pucca and Railing Boundary Wall
Yes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
Yes, Footpath will be constructed using Interlocking / Paver as per Santioned Plans.
Yes, Water Supply from Authority further water to be collected in Under Ground Water reservoirs Terrace Tanks, equipped with Hydro Pneumatic pumps with GI rings and risers
Proper sewerage system will be constructed using R.C.C. / UPVC pipes as per drawings and will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
Draining system will be constructed using R.C.C / UPVC pipes as per drawings.
Yes, Beautiful Landscape with Civil Work with Masonary and Stone, Horticulture Work and various types of Plantation.
Sufficient No. of trees as per Sanctioned layout will be planted in the project. Beautiful landscape with civil work with masonary and stone, horticulture work and various types of plantation, shrubs. trees are to be planted out of that 50 percent will be evergreen tree.
HT electrical supply will be made by competent authority, a sub station will be set-up in project as per drawing and LT electrical supply will be available for Individual unit(s). Sufficient power back-up arrangement will be made using DG sets. Street Lighting will be done using LT supply / power back-up.
Yes, With Banquet, Gym, Indoor Games facilities etc.
Sewerage Treatment Plant will be installed / constructed as per approved drawing. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
Yes, Solid waste will be collected manually and disposal will be done as per norms.
Water conservation will be done by rain water harvesting system and through Sewerage Treatment Plant (STP)
Good quality and approved brand equipment will be used in sub-station to minimize energy loss and Solar Energy will be installed as per norms and approved drawings.
Shall be provided as per NBC and NOC from fire deptt.
Proper Water Supply and Sanitary facilities on Ground Floor of Every Tower.
Yes, Staircases shall be provided In Basement and all the Towers for fire/ emergency exit as per NBC.
Proper security system including security guards, CCTV Cameras and controlled access will be made available.