OngoingActive

PARSVNATH PRIVILEGE PHASE-III

Gautam Buddha Nagar, Uttar Pradesh
31-03-2012
Launch Date
Ongoing
Type
30-01-2022
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

30-01-2022

RERA ID

UPRERAPRJ6076

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)34840
Project NamePARSVNATH PRIVILEGE PHASE-III
Registration Fee (in Rs.)179500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)118
DistrictGautam Buddha Nagar
Original Start Date20-10-2007
TehsilGautam Buddha Nagar
Proposed Start Date31-03-2012
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)22616
Proposed Completion Date30-01-2022

Location

Latitude

28'28'08'

Longitude

77'32'23'

Bank Details

Account no.90361010016011
Name Of Account HolderPARSVNATH DEVELOPERS LIMITED
Bank NameSYNDICATE BANK
Branch AddressARUNACHAL BUILDING , BARAKHAMBA ROAD , NEW DELHI
Branch NameBARAKHAMBA ROAD
IFSC CodeSYNB0009036

Development Works

Demarcation of Plots

NA

Boundary Wall

RCC /Brick Work / Stone Cladding

Road Work

CC / Paver Blocks

Footpaths

Grass Pavers /CC /Landscaped Walkways

Water Supply Including Drinking Water Facilities

the Water supplied for drinking to be filtered treated Through Individual RO

Sewer System

RCC /SW Pipes & STP ( Moving Bed Bio Reactor)

Drain

RCC drains with designated Discharge Punts & RWH

Parks

As per Revised Submission Drawing

Tree Planting

As per Revised Submission Drawing /Landscape plan

Design For Electric Supply Including Street Lighting

Copper Wires in concealed PVC conduits , As per Revised Submission Drawing /Landscape plan/ Single Point Supply and then distributed to Units

Community Buildings

Club with Swimming pool

Treatment and Disposal System of Sewage and Sullage water

STP ( MBBR)

Solid Waste Management And Disposal System

2 Bin System ( green & Blue) and disposable to designated place as per Guidelines

Water Conservation System

Rain Water harvesting System

Energy Management System Including Use of Renewable Energy

As per Guidelines/Revised Submission

Fire Protection And Fire Safety System

As per NBC 2016 & Wet Riser ,Hydrants etcas per approved Fire plan

Social Infrastructure And Other Public Amenities Including Public Health Services

Club with Swimming pool

Emergency Evacuation Services

Fire egress Plan as per Approved Fire Scheme

Other Miscellaneous Work

NA

Documents

Lease Deed

No: LEASE DEED NO. 602 OF 2007 BOOK NO.01 | Date: 12-01-2007

Allotment Letter issued by Competent Authority

No: PROP/BRS/2006/579 | Date: 05-09-2006

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Details of Encumbrances

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 21-07-2018

Proforma of Conveyance Deed

Uploaded: 31-01-2019

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 21-07-2018

CA CERTIFICATE

Uploaded: 31-01-2019

ARCHITECT CERTIFICATE

Uploaded: 31-01-2019

ENGINEERS CERTIFICATE

Uploaded: 31-01-2019

Affidavit

Uploaded: 25-10-2017

Permits

Orignal Permit NoPLG/(BP)1417 FIS NO-1636
Orignal Permit Date12-03-2015
Valid Upto11-03-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-03-2025
End Date31-07-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameMr. C.L. Sharma
Architect AddressC-56, Sudharshan Park, Moti Nagar, New Delhi
Architect Licence NumberCA/75/9
Structural Engineer NameMr. Amar Kant Choudhary
Structural Engineer Address132, Mithila Apartments, I.P. Extension, Delhi-110092
Mobile number(Project Co-ordinator)9205809569

Land Details

AFS

Showing 7 blocks with 266 units

Property Summary

Total Carpet Area

43548.00 m²

468746.32 ft²

Total Units

382

2 different types

Blocks & Floors

7

20 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:114.00 m²
Balconies:682
Parking ratio:0.00 per unit

Block TOWER 6

45 units

Block TOWER 7

45 units

Block TOWER 10

55 units

Block TOWER 11

54 units

Block TOWER 19

22 units

Block TOWER 20

22 units

Block TOWER 21

23 units

Khasra Details

Total Area

100095.00 m²

1077412.57 ft²

1 plot
Plot
TypePlot
Khasra/Plot No11
Area(In Sq. Mt.)100095

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameMr. C.L. Sharma
Architect AddressC-56, Sudharshan Park, Moti Nagar, New Delhi
Architect Licence NumberCA/75/9
Structural Engineer NameMr. Amar Kant Choudhary
Structural Engineer Address132, Mithila Apartments, I.P. Extension, Delhi-110092
Mobile number(Project Co-ordinator)9205809569