Municipal water shall be used as prime source along with Ground water . Provision of RO in kitchen for drinking purpose
Soil & Waste from Toilet & Kitchen will be collected in single network of sewer pipe laid under ground with manhole & connected to Centralized STP of JP Greens
Separate line for rain water with harvesting pit & Other line for soil & waste
AS PER PLAN
AS PER PLAN
Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks
AS PER PLAN
Sewer water treatment through Centralized STP of Jaypee Greens Township with their disposal arrangement
AS PER PLAN
VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture
Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy
Internal & external hydrant system ,basement sprinkler ,MCP & Fire Extinguishers in all floors . As per Fire norms NBC -2016
AS PER PLAN
AS PER PLAN
AS PER PLAN
Showing 1 blocks with 49 units
Total Carpet Area
11676.00 m²
125679.30 ft²
Total Units
46
4 different types
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5206.00 m²
56036.86 ft²