Have queries on this Project?
28.31224
77.21066
Showing 1 blocks with 32 units
Total Carpet Area
6175.31 m²
66470.42 ft²
Total Units
30
2 different types
Blocks & Floors
1
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4028.00 m²
43356.99 ft²
Numbers of plots -1, size per plot- 4028 Sqm, total area demarcated; method of demarcation, survey accuracy- As Per Site Plan and Possession Plan
Length- 226 mtr, height- 7mtr+, material used; type (brick, RCC, fencing) - RCC and MS FENCE, apperance- Stonewall, safety features- CCTV and Additional Height of MS Fence
Total road length- 57 mtr and Motorable Green and width- 6 mtr -7.5 mtr, number of lanes- 1 and 2 on the Ramp/Road in Slope; type of pavement- PAVERS, drainage- As per Fire Tender Movement
Length- 160 mtr, width- 1.35m, number of crossings- None; material used- Stone and Pavers, accessibility- Ramp, safety design- Compilance with Safety Standards
Number of water connections- 2 (Treatment Water + Domestic), tank capicity- UGT (215 KL including Fire Tank) + Overhead Tank (33 KL including Fire, Flushing and Domestic), hydrants Yard hydrants (5 nos); source of water- Township, treatment method- Township STP will be used for Treatment, compilance with quality standards - YES
Length of sewer lines- 25 mtr External, pipe size- 250mm dia, manholes- 3; type (gravity/pressure) - Gravity, material used- DWC HDPE Pipes, network design- Piping Design Network connected to External Sewerage System of Township
Length- 480 MTR [Storm Drain 280 running meter and Surface Drain 200 running mtr], width- 150mm and 250mm dia pipe in External Storm Drain and Internal 160mm dia, number of open/covered drains- ALL COVERED DRAINS; type (storm/surface)- BOTH - Storm Drain in External Area and Surface Drain in Basement, material- STORM in Brickworks with waterproofing and Surface in RCC with Tiling, disposal method- RWH and Drain Connecting to Township
Area- 1102 sqm, number of parks- 3, number of trees/plants- 32; landscaping features- Water Body, Gezebo, Green wall, types od parks- Childrens Park, Celebration lawn, Gazebo Park, public amenities- Swings, Seating Area, Lighting
Number of trees- 32, type/species, spacing; native/exotic trees - Mainly Native with a couple of Exotic Trees, maintenance plan- Gardening AMC- (Details As per Landscape Plan)
Number of poles- 21, lights- 180 approx, tranformer units- 2; type of lighting (LED/solar) - LED, illumination design- Bollard, Street Poles, Uplighter and Wall washer Lights.
No- Ground Floor of Tower Area , area per building- 1024 sqm, capicity; purpose- Club/Community Centre and Lift Lobby for Towers, construction type- RCC (Ground floor of Tower Area) , facilities Gymnasium, Cafetaria, Indoor Games, Soft Play Area, Swimming Pool and Health Spa
STP capacity (KLD), number of treatment units; type of STP, treated water use, regulatory compilance- WILL BE USING OF TOWNSHIP
Estimated waste (kg/day) , number of bins/collection points- 30; segregation- Inside Flat, composting/recycling- Encouraging Residents, collection method- Conventional
Number and size of harvesting pits- , recharge wells; water-efficient fixtures, reuse/recharge strategy, system efficiency. - Independent Rainwater collecting System from roofs/terrace/balconies and connecting to Township
(Renewable Energy) Solar capacity (kW) , number of pannels; type of renewable energy used, grid integration, backup provision - 1 Percent of TOTAL DEMAND LOAD SHALL BE GENERATED AND FED BY SOLAR PV SYSTEM as per ENVIORNMENT MANDATORY REQUIREMENT
Number of hydrants - 5 , fire exits- 2 (One in each Tower), sprinklers- Automatic Sprinkler System in Basement; system type (manual/automatic)- AUTOMATIC, NBC compilance- YES, fir safety training - YES
Number/area of amenities- 4 toilets (toilets, health units); type of services offered- TOILET, inclusiveness, accessibility.
Number of evacuation points- 2, road widths- 6 mtr, signage count; route plan- Escape Route with Emergency Backed up Lighting, safety measures- Hooters, Manual Call Points, Talk Back System with telephone Jacks, public awareness system- Signages, Drills and Regular Updates.
Work based on the nature of work (e.g., number of CCTV units, benches); beautification efforts, signage, aesthetic and utility elements - CCTV- 40 approx; Benches, Water Body along Front Tower Profile to enhance beauty of Landscape, Aesthetic Lighting, Green wall with Creepers/Climbers to enrich the Boundary wall.
Page 3 Noida is located in Gautam Buddha Nagar.
Yes. Page 3 Noida is registered under UPRERAPRJ819615/01/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Page 3 Noida is 31 October 2026.
Page 3 Noida is developed by PAGE3 BUILDTECH PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.