DEMARCATION OF PLOT ALREADY DONE AS PER APPROVED LAY OUT PLAN
BOUNDARY WALL SHALL BE OF BRICK WORK UPTO 1.00 MTRS HEIGHT AND THE MS RAILING OF APPROX. 1.00 METERS HEIGHT SHALL BE INSTALLED. TOTAL HEIGHT SHALL BE APPROX. 2.00 METERS HEIGHT.
3 METER WIDE ROAD SHALL BE CONSTRUCTED FINISHED WITH HEAVY DUTY PAVERS.
FOOTPATH IS NOT PROPOSED
CPVC PIPES SHALL BE LAID . UNDERGROUND TANK AND OVERHEAD TANK TO BE INSTALLED. MUNICIPAL WATER SHALL BE USED FOR DRINKING AFTER PROPER TREATMENT.
UPVC PIPES SHALL BE LAID FOR SEWAGE. MAIN HOLES TO BE ERECTED . SEWAGE FROM MAIN HOLES SHALL BE DISCHARGED TO SAFETY TANK.
PVC PIPE FOR RAIN WATER SHALL BE LAID ON THE TERRACE AND SHALL BE CONNECTED TO DRAINAGE MAIN HOLE AND SHALL BE DISCHRGED TO AUTHORITIES DRAINAGE SYSTEM.
NOT APPLICABLE
30 NO OF TREES IS PROPOSED INCLUDING OF TOTAL EVERGREEN TREES IS 12 NUMBERS AND DECIDUOUS TREES IS 18 NUMBERS.
ALL UNITS WILL HAVE MDB/ELECTRIC POINTS AS PER ELECTRIC SUPPLY/ELECTRIC CODE MANUAL. STREET LIGHTS SHALL BE AS PER NPCL GUIDELINES. 4.5 MTRS. HEIGHT POLES SHALL BE INSTALLED AS PER NORMS.
NOT APPLICABLE
NOT APPLICABLE
ALL THE WASTE SHALL BE SEGREGATED AT SITE AND SHALL BE DISPOSSED OFF BY THE VENDORS OF THE AUTHORITY.
RAIN WATER HARVESTING PITS IS PROPOSED AS PER APPROVAL OF THE LOCAL BODY.
NOT PROPOSED
FIRE SAFETY SYSTEM IS PROVIDE AS PER THE SANCTION LAYOUT PLAN AND NBC 2016 CODE INCLUDING FIRE HOSE REEL AND OTHER REQUIRED FIRE EQUIPMENT. FIRE FIGHTING CYLINDERS SHALL BE INSTALLED ON THE STAIR CASES AS PER REQUIREMENT.
NOT PROPOSED
FIRE ASSEMBLY POINT IS PROVIDE IN OPEN AREA IN FRONT OF THE BUILDING
N.A
Showing 1 blocks with 4 units
Total Carpet Area
372.00 m²
4004.17 ft²
Total Units
14
1 different types
Blocks & Floors
1
2 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1500.00 m²
16145.85 ft²