Have queries on this Project?
28.565569
77.476497
Showing 1 blocks with 574 units
Total Carpet Area
31042.89 m²
334142.56 ft²
Total Units
1033
3 different types
Blocks & Floors
1
26 floors across all blocks
Parking
0
0 garages, 0 open
No: Document No. 925, Book No. 1, Volume No. 30012, Page No. 301 to 350 | Date: 08-01-2025
Total Area
10400.00 m²
111944.56 ft²
Total Plot Area is 10400 Sq. Mtr. and demarcation will be as per Approved Plan.
Front Boundary Wall 1.5m High and Side Boundary wall 2.0m High boundary wall. Brick Work and Permanent Furnishing on Boundary wall.
7.5 m wide internal road, Road Finished in a cement concrete with lying of pavers on top.
Stone paving as per landscape architect plan, Fire pathway of 7.5 mtr.
Water supply to be taken from Greater Noida Industrial Development Authority. WTP to be installed in the project.
Underground sewer line will be laid. STP will be installed. Sewer connection will be obtained from authority.
Drain line will be laid and connection will be obtained from authority.
Landscaping with plantation including trees, shrubs and ground covers and recreational areas with benches and walkways.
As per landscape consultant, One tree per 100 sq. mtr. of open area is proposed having approx. 80 trees in total.
HT power connection will be hired from NPCL. Electrical substation will be installed in the project with dedicated Transformers, HT/LT panels and DG sets. Street lights will be installed with Grid power supply as well as backup power supply.
Not Applicable
Dedicated Sewage treatment plant will be installed for Sewage Treatment.
Organic waste composter will be installed for solid waste management. Disposal of organic waste will be done through authorised agency.
Rain water harvesting chambers will be installed.
Grid Supply through NPCL. Backup power- DG with CPCB guidelines. Emergency Power- UPS
The land is commercial and the project falls under Category A-5 having height above 60 meters for service apartment building. As per the NBC-2016, Table-7, page 41 and 42 . Internal and External fire hydrant system shall be provided with landing valve, hose reel with shut off nozzle, short branch pipe with nozzle and fire man axe. Automatic sprinkler system is provided. the system shall be suitable zoned for its optimum functional performance. Sprinklers shall be distributed throughout the building as per the National Building Code and IS 15105 requirements. In order to detect the fire/smoke in incipient stages an intelligent/Addressable automatic Fire detection and alarm system is proposed to be provided to cover all areas to provide timely warning to occupants to evacuate safely before the fire/smoke spreads. the system shall be fully zoned addressable, digital, self-diagnostic and cover all the internal and external areas.
Not Applicable
Fire Staircase provided as per sanction plan.
Hoarding.